Download presentation
Presentation is loading. Please wait.
1
Optimization of O3 NAAQS Compliance Networks
OTC/MANE-VU Committee Meeting Hall of States 444 N. Capitol Street, NW Washington, D.C. April 11, 2017 Will Ollison (American Petroleum Institute) 1220 L Street, NW • Washington, DC •
2
Isn’t an OTC Monitoring Committee now needed?
New Opportunities Isn’t an OTC Monitoring Committee now needed? Enhanced Monitoring Plans are required by 2019 for moderate & above nonattainment areas [40 CFR §58.10(a)(11)]. Use of best available monitoring and modeling techniques are required to determine transport contributions to nonattainment areas [42 CFR §7511c(d)]. The reliability of O3 models is judged on their agreement with compliance monitoring data. New “interference-free” FRMs/FEMs are available but are not currently required/deployed within the O3 compliance network - 1220 L Street, NW • Washington, DC •
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.