Presentation is loading. Please wait.

Presentation is loading. Please wait.

WE-WC Almaty – Khorgos Road Section Materials prepared in %

Similar presentations


Presentation on theme: "WE-WC Almaty – Khorgos Road Section Materials prepared in %"— Presentation transcript:

1 WE-WC Almaty – Khorgos Road Section Materials prepared in %
ILI Bridge Main Indicators RCM Preparation General Contractor OHL ZS JSC Contract Cost 6  ,21 tenge Construction Period Disbursed in ,81 tenge Balance on 2017 ,40 tenge CSC Engineer Dongsung Engineering Co.Ltd in cooperation with Dongmeng Engineering and Zhol-Sapa LLC Project Author Акционерная Компания «Казакстан Жолдары Number of Equipment 30 pcs. Personnel 61 pers. Material to prepare Unit Plan for 2017 As of % Crushed stone thous.м³ 0,136 0,108 79 SGM 2,082 2,802 100 Cement thous.tn. 0,132 0,111 84 Quarry rock 2,040 0,689 34 Reinforcement thous.тн. 0,005 Almaty Khorgos ILI Bridge 0 км 304 km New Bridge – 682 m Existing Bridge – 684 m Type of Works Implementation in % Materials prepared in % River bed clearance 41 Earthworks 5 34 Binder coarse 100 Crushed stone base Repair of bearing block Steel construction for superstructure Precast r/c slabs at bridge connection Precast r/c of sidewalk slabs In-situ r/c of bore piles In-situ r/c for slopes protection In-situ r/c of pier cap Reinforcing 95 Clearance and painting of bridge Coating with bitumen Painting of bridge Waterproofing Bridge outfit 97 Hand railings Guard railings Repair of drive way slab Replacement of concrete on foundation of pier body 87 1 1


Download ppt "WE-WC Almaty – Khorgos Road Section Materials prepared in %"

Similar presentations


Ads by Google