Download presentation
Presentation is loading. Please wait.
Published byAbdiel Merlin Modified over 10 years ago
1
1 Item 11, Presentation to the TPB, September 15, 2010
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
Major Corridor Studies Considering Managed / Priced Lanes Under Construction 1.Capital Beltway in Virginia HOT Lane Project 2.Intercounty Connector (ICC) Included in CLRP 3.I-95/395 HOV/Bus/HOT Lanes Plan Corridor Studies 4.14th Street Bridge Corridor 5.South Side Mobility Study 6.West Side Mobility Study 7.Capital Beltway Study 8.I-270/US 15 Multi-Modal Corridor Study 9.Interstate 66 Studies 10.MD 5 Corridor Transportation Study Network Analysis Study 11.MDOT Maryland Managed Lanes Study
18
Public Acceptability of Regional Road Pricing: Can it be Designed to Garner Public Support? New TPB study will examine the public acceptability of various regional road pricing scenarios Funded Through the Value Pricing (VPP) Program of the Federal Highway Administration (FHWA) Proposal submitted on November 3, 2009 Grant awarded on August 2, 2010 18
19
Conducting the Study Working group of 10-14 experts will frame options/scenarios for comprehensive regional road-use pricing Consultant(s) will conduct telephone survey and convene stakeholder focus groups to discuss scenarios; results to be significant at regional and jurisdictional levels Report results to TPB 19
20
Administering the Study Submitted by VDOT on behalf of TPB to FHWA on Nov. 3 TPB will be lead implementing agency, with support from Brookings Greater Washington Total Budget = $400,000 – $320,000 Federal with $80,000 COG match One-year project, beginning Oct. 2010 (estimated) 20
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.