Download presentation
Presentation is loading. Please wait.
Published byΛεωνίδας Γούσιος Modified over 6 years ago
1
The summer of 2018 and all the work that has taken place
Summer work at a glance The summer of 2018 and all the work that has taken place
2
Floors have been stripped and waxed at all schools
N Scituate Elementary MS HS Halls Floors have been stripped and waxed at all schools
3
Water fountains with bottle fills installed in HS (4) MS (1)
HS Water Fountain MS Water Fountain Water fountains with bottle fills installed in HS (4) MS (1)
4
Corridor at Gym Entrance
Main Corridors Let the painting begin
5
And the painting goes on
Music Wing Music Offices And the painting goes on
6
Kitchen floor resurface at HS
Before After Kitchen floor resurface at HS
7
Kitchen floor resurface at N Scituate elementary
Before After Kitchen floor resurface at N Scituate elementary
8
The hs ms Library Remodel
New Library Floor New Electrical and Data
9
Exterior Concrete Work
Exterior Concrete Work. We added a ramp for the HS kitchen staff to access outdoor freezer
10
Ten classroom floors at N Scituate Elementary were removed and replaced adding a moisture mitigation system to resolve issues. The BOND Work
11
The behind the scenes work
Annual HVAC filter changes Annual equipment inspections Parking lot striping Curb painting Landscaping Tree trimming E Waste removal Data fiber optic upgrades Water lines for the greenhouse Freezer and fridge repairs Painting at elementary schools by custodial staff The behind the scenes work
12
What The Future Holds for the BOND projects
HS MS restroom remodels taking place at night for 4 to 5 weeks starting Sept. of 2018 HS boys locker room remodel over Christmas break. New windows in MS Cafeteria are scheduled for Christmas break The football field will start ASAP New septic for HS Window repairs at HS summer of 2019 Manning field renovations to go out to bid Sept. of 2018 N Scituate Elementary all new windows and doors in original wing of school summer of 2019 Hope ramp and railings summer of 2019 Hope boys room remodel to take place throughout the year 4 to 5 weeks during the night Clayville well tank liner will be done summer of 2019 What The Future Holds for the BOND projects
13
Capital work fy19 Generators for all 3 elementary schools
Generators will be large enough to support school to avoid issues during the winter Tie IT into HS existing generator Add motors and new cables to HS MS basketball backboards Clayville integral gutter repairs Control upgrades for HVAC and lighting Capital work fy19
14
Other initiatives being worked on
LED District wide using Trust Energy and funding from RI Infrastructure Bank HVAC repairs and major maintenance using Trust Energy and funding from RI Infrastructure Bank Weatherization of buildings using Trust Energy and funding from RI Infrastructure Bank All of the work proposed to be funded by RI Infrastructure Bank is cash flow positive and all savings will pay for the upgrades. The goal is that energy savings will be great enough that we put cash back into the district after paying RI Infrastructure Bank each month. At this point the projected annual positive cash flow is $60, / $5, a month I have also worked with our Energy Partner Trust Energy to evaluate the Town owned properties in an effort to help the town save energy as well. Other initiatives being worked on
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.