Presentation is loading. Please wait.

Presentation is loading. Please wait.

A SUGGESTION DAVE BYERS 2011/3/22

Similar presentations


Presentation on theme: "A SUGGESTION DAVE BYERS 2011/3/22"— Presentation transcript:

1 A SUGGESTION DAVE BYERS 2011/3/22
IN-SPACE PROPULSION A SUGGESTION DAVE BYERS 2011/3/22

2 O STRATEGIC RESOURCES TO ACADEME &
SCOPE O STRATEGIC RESOURCES TO ACADEME & GOVERNMENT ASSUMED/NOT CONSIDERED - PROVIDE UNIQUE/CRITICAL VALUES O TECHNOLOGY DEVELOPMENTS/INSERTIONS - SINGLE SUGGESTION ON PRIORITIZATION

3 BACKGROUND O NASA BUDGET (Policy) NEGOTIATIONS DOMINATE
- MAJOR ECONOMIC/EXTERNAL CONSIDERATIONS DOMINATE - TECHNICAL CONSIDERATIONS ≤ SECONDARY - NEAR-TERM OFTEN EMPHASIZED -

4 A SUGGESTION O STRONGLY PRIORITIZE ISP RESPONSIVE
TO MULTI-SECTOR DRIVERS - ENHANCE COMPETITIVENESS & CAPABILITIES O & WITH MULTI-MISSION BENEFITS

5 Q & A O CAN ISP CREDIBLY/SIGNIFICANTLY AFFECT
MULTI-SECTOR ISSUES & DRIVERS? O YES! BECAUSE: - HUGE PENALTY FOR NEARLY ALL HIGH-VALUE MISSIONS - OPTIMUM MISSION COSTS ACHIEVED VIA LOW-COST LAUNCH & HIGH PERFORMANCE ISP - CREDIBLE TECHNICAL OPTIONS EXIST

6 SUGGESTED ISP PRIORITIES
O ISP TECHNOLOGY/SYSTEMS THAT SIGNIFICANTLY INCREASE/ENABLE USA: - LAUNCHER MARKET CAPTURES/RELEVANCES - USA COMSAT BID COMPETITIVENESS - NEW BIZ VENTURES (S/C REFURB, DEBRIS, SMALLSAT, ?) - USA FULL RLV & DUAL-LAUNCH PRACTICALITY(?) O AND ARE RELEVANT/EVOLVABLE TO: - NASA ROBOTIC & EXPLORATION MISSIONS O INCLUSIVE ANALYSES TO DEFINE & VALIDATE THE ABOVE

7 A RIDER O ASSURE ALL VALIDATIONS REQUIRED FOR ACCEPTANCES & INSERTIONS
- KEY PLAYER INVOLVEMENT CRITICAL - INTERFACE & NON-PROPULSION ISSUES - DON’T START IF FINISH IS UNREALISTIC

8 CONCLUSION O AN ISP INVESTMENT PRIORITY SUGGESTED THAT OFFERS NASA:
- BROADENED CRITICAL RELEVANCES - MIMINIZED RISK & RESOURCE EXPOSURES - GREATLY INCREASE EXPECTATIONS FOR VALUES ADDED


Download ppt "A SUGGESTION DAVE BYERS 2011/3/22"

Similar presentations


Ads by Google