Download presentation
Presentation is loading. Please wait.
1
Waterflood History Match + Tracer Design
Goals: History match primary and waterflood production: Only match production after 1970 Earlier production records not available Adjust reservoir size and area heteregeneities Vary Dykstra Parsons coefficients to obtain correct permeability field Vary layering to match breakthrough times
2
Waterflood History Match + Tracer Design
Goals: Design tracer to understand layering in detail & predict: Minimum and maximum breakthrough times Concentration profiles Tracer volumes Sampling schedule
3
Digitized Structure and Net Sand
4
Field History Match
5
Individual Well Matches
6
Water Position at Various Times
7
Ternary Cross Sections
Time across and cross section down
8
Tracer Movement Profiles
9
Waterflood Tracer Design - Conclusions
Primary and recent waterflood history matched Tracer design created Model will be updated after tracer breakthrough to: Optimize waterflood recovery Minimize water production
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.