Download presentation
Presentation is loading. Please wait.
1
Mark Petree: Current Projects
Phase Cavity Timing System Beam Arrival Time Down Converter and Upgrade Timing Phase Shift Chassis System Integration in UND Hall
2
Phase Cavities in Undulator Hall
3
Down Converters, Phase Shifter and LBL Chassis
4
VME Crate, IOC, Phase Shifter and LBL Chassis
5
Mark Petree: Current Projects
Coaxial Stabilization System and Upgrade Transmit and Receive Chassis Two Designs: Circulator and RF Coupler based Designs for LCLS and LHC
6
Coaxial Stabilization Receiver Chassis
7
Coaxial Stabilization Transmitter Chassis
8
B685 Lab Management and Organization
Lab space available for APE members Large inventory of instrumentation and parts George Burgueno available for assistance
9
B685 Lab Workbenches
10
B685 Lab Rackspace
11
B685 Lab Rackspace
12
Project Coordination and Management
Available for management of member projects and coordination of SLAC shops and groups
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.