Presentation is loading. Please wait.

Presentation is loading. Please wait.

FORSCOM AVN TRANSFORMATION OVERVIEW FY 04-07.

Similar presentations


Presentation on theme: "FORSCOM AVN TRANSFORMATION OVERVIEW FY 04-07."— Presentation transcript:

1 FORSCOM AVN TRANSFORMATION OVERVIEW FY 04-07

2 2002 CSA Approved Design C EAD DIV USAREUR Theater USARAK USARSO NEA
X SWA X X X X R B E A I R O N X X X C S X C S I I X X C S I I X X C S I I ATK CAB ATK CAB RAS ATK CAB RAS ATK CAB RAS EAD ATK CSAB ATK CSAB ATK CSAB ATK CSAB C B ATK ASLT ATK ASLT ASLT ATK ASLT HHB HHB HHB HHB DIV 1 AD 1 OLD IRONSIDES 1 CAV 1 ID 2 ID 3 ID 4 ID 10 MT M O U N A I T 25 ID 82 ABN R B E 101 AA X ATK GS CAV ATK GS CAV ATK GS CAV ATK ASLT CAV ATK GS CAV ATK GS CAV ATK ASLT CAV ATK ASLT CAV ATK ASLT CAV ATK CAB ATK HHB ASLT UH* ATK UH* UH* UH* UH* UH* UH* UH* UH* UH* CAV C 28 DIV 29 DIV 34 DIV 40 DIV 42 DIV 49 DIV LONE STAR 49 35 DIV 38 DIV X 2x10 UH 2x8 UH X 2x8 UH 2x10 UH 3x10 UH X Legend ATK GS CAV ATK GS CAV ATK GS CAV ATK GS CAV ATK GS CAV ATK GS CAV

3 AVIATION TRANSFORMATION
Multi-functional Aviation Brigades optimized to support up to four BCT’s Company Building Blocks Capable & Lethal – More combat power in support of the soldier and the Joint Force Commander Modular – Standard Company size capabilities Tailorable – Flexible for Task Organization Sustainable – Provide Modular Maintenance Packages R/A ASLT U I GS I HVY I MED I 8 10 8 12 12 OR Standardized Heavy, Light and Medium structures MF X 10 HVY GS II ASLT U ATK 3 x 8 AH 3 x 10 UH 8 x UH 12 x CH 12 x HH MED GS II ASLT U ATK 3 x 8 AH 3 x 10 OH 8 x UH 12 x CH 12 x HH 3 x 10 UH LT GS II ASLT U ATK 3 x 10 OH 3 x 10 UH 8 x UH 12 x CH 12 x HH AER II II ATK 3 x 8 AH (2 x 8 Auth) II II C 3 x 8 OH current 3 x 8 LUH Future S&S II U 3 x 10 UH ASLT II 8 x UH 12 x CH 12 x HH GS 6 AC & 2 RC 3 AC 2 AC 6 RC

4 Aviation Transformation Force Structure (DTG 101600 DEC 2004)
EUSA O A I R B N E IN WORK ARCENT USARPAC 3x10 OH 1 x 8 AH 1x10 UH UEy ACS I I Theater UEy X 5 x 8 FW 1 x 8 UH 1x12 CH 1x12 HH X 5 x 8 FW 1 x 8 UH 1x12 CH 1x12 HH II Totals 90 OH 24 AH 258 UH 72 CH 72 HH X X X 1 x 8 UH 1x12 CH 1x12 HH 3x10 UH Totals 50 UH 46 CH 160 FW 36 HH FW FW FW 1 x 8 UH 1 x 6 CH GSAB GSAB GSAB GSAB GSAB ACS I I 3x10 OH 1 x 8 AH 1x10 UH ARNORTH USARSO GSAB GSAB GSAB USAREUR 5 x 8 FW 1 x 8 UH 1x12 CH 1x12 HH I ASLT ASLT ASLT I I X ASLT ASLT ASLT ACS I I 5x8 FW 1x8 UH 1 x 8 UH 1 x 4 CH ATS ATS ATS FW FW ASB ASB ASB CAC GSAB MFAB (HVY) 1 CAV 1 AD 1 OLD IRONSIDES 1 ID 1 2 ID 3 ID 4 ID 28 ID 29 ID X ASLT R/A ASB GSAB X ASLT R/A ASB GSAB X ASLT R/A ASB GSAB X ASLT R/A ASB GSAB X ASLT R/A ASB GSAB X ASLT R/A ASB GSAB 3 x 8 AH (R/A) 3x10 UH (ASLT) 1 x 8 UH (CAC) 1x12 CH (HHC) 1x12 HH (MEDEVAC) X ASLT R/A ASB GSAB X ASLT R/A ASB GSAB Totals 384 AH 304 UH 96 CH 96 HH MFAB (MED) 101 AA A I R B N E O 159 AA A I R B N E O 82 ABN O A I R B N E 10 MT M O U N A I T 25 ID X GSAB ASLT ASB R/A MFAB (LT) Totals 90 OH 72 AH 114 UH 36 CH 36 HH X ASLT R/A ASB GSAB X GSAB ASLT ASB R/A 3x10 OH (R/A) 3x 8 AH (R/A) 3x10 UH (ASLT) 1 x 8 UH (CAC) 1x12 CH (HHC) 1x12 HH (MEDEVAC) X ASLT R/A ASB GSAB X ASLT R/A ASB GSAB 3x10 OH (R/A) 3x10 UH (ASLT) 1 x 8 UH (CAC) 1x12 CH47 (HHC) 1x12 HH-60 (MEDEVAC) Totals 120 OH 76 UH 24 CH 24 HH UEY FROM RIGHT TO LEFT – XVIII CORPS, III CORPS, V CORPS AER 38 DIV 42 ID 35 DIV C 34 DIV 36 ID 40 ID 3 x 8 AH (ATTACK) 3 x 8 LUH (S&S) 3x10 UH (ASLT) 1 x 8 UH (CAC) 1x12 CH (HHC) 1x12 HH (MEDEVAC) Totals 96 AH 144 LUH 228 UH 72 CH 72 HH X ASLT R/A ASB GSAB S&S Legend

5 Aviation Implementation Timeline - Overview
FY04 FY05 FY06 FY07 FY05-08 USAREUR OCT 06 – OCT 07 4-123rd AVN FT WAINWRIGHT, AK APR 05 – OCT 05 1-228th AVN SOTO CANO, HONDURAS OCT 04 – OCT 04 1-207th AVN ALASKA 8TH ARMY SEP 05 – OCT 06 160th SOAR SEP 04 – OCT 05 3RD ARMY XVIII MAY 04 – SEP 06 O A I R B N E III JAN O5 – OCT 06 V SEP 05 – OCT 06 I UEy 1 ID(M) KATTERBACH, GERMANY SEP 05 – OCT 06 UEx 3 ID(M) HUNTER AAF, GA MAR O4 - AUG 04 4 ID(M) FT HOOD,TX AUG 04 – FEB 05 10 ID(L) FT DRUM, NY APR 04 - APR 06 M O U N A I T 82 ABN FT BRAGG, NC SEP 04 – SEP 06 O A I R B N E 1 CAV FT HOOD, TX SEP 05 – SEP 06 2 ID CAMP CASEY, KOREA JAN 05 - OCT 06 101 AA FT CAMPBELL, KY A I R B N E O 159 AA FT CAMPBELL, KY A I R B N E O 25 ID(L) SCHOFIELD BKS, HAWAII OCT 05 – SEP 06 1 AD HANAU, GERMANY SEP 05 – OCT 06 OLD IRONSIDES 1 4/3 ACR FT CARSON, CO MAY 06 – OCT 06 4/2 ACR FT POLK, LA OCT 04 – AUG 06 The division conversion timeline matches the Army timeline for reset and conversion to new modular designs. Corps conversion timelines currently reflect movement of AC structure associated with supporting the division conversions. Theater and unique structures are converted as AC structure changes are required to support division conversions. 4/2 ACR conversion in FY05 reflects conversion in support of the 2CR conversion – the AH64D Company will still activate in FY06. ARNG Division conversion timelines are still pending approval and coordination within ARNG. APR 04 – SEP 04 28 ID(M) PA 38 DIV IN C 35 DIV MO 29 ID(L) MD 40 ID(M) CA 42 ID(M) NY 4/278 ACR TN 34 DIV MN 36 AD TX ARNG AVIATION RE QUESTING 1 JUN 05 AND 1 OCT 05 EDATES AS OF: 18 JULY 2004

6 Aviation Reset Production Summary By Mission Design Series (MDS)
UNCLASSIFIED Aviation Reset Production Summary By Mission Design Series (MDS) G-4 OIF 1 / OEF 1 thru 4 Reset Status MDS Reset Required Awaiting Induction In-Work Completed AH-64 160 4 3% 11 7% 145 91% CH-47 148 16 11% 35 24% 97 66% OH-58 123 0% 19 15% 104 85% UH-60 402 10 2% 33 8% 359 89% Total 833 30 4% 98 12% 705 85% OIF 2 / OEF 5 Reset Status MDS Reset Required Awaiting Induction In-Work Completed AH-64 68* 42 95% 2 5% 0% CH-47 50 47 94% 3 6% 0% OH-58 90 55 74% 15 20% 4 5% UH-60 189 150 79% 37 20% 2 1% Total 397 294 82% 57 16% 6 2% * 24 AH-64 were turned in to Re-man Line at Boeing Current OIF / OIF 4-6 Aircraft Future OIF / OEF 5-7 Requirements MDS Aircraft Required MDS Aircraft Required AH-64 142 AH-64 120 CH-47 65 CH-47 64 OH-58 48 OH-58 60 Next Briefing UH-60 288 UH-60 277 Total 543 Total 521 FORSCOM UNCLASSIFIED As Of APR05


Download ppt "FORSCOM AVN TRANSFORMATION OVERVIEW FY 04-07."

Similar presentations


Ads by Google