Download presentation
Presentation is loading. Please wait.
1
PBN and Regional Aircraft
Pierre Alibert Marchi Product Development Engineer - Avionics, October 17th, 2012 Legacy, turboprop and regional issues
2
Embraer Commercial Airplanes
37 PAX ERJ-135 1,750nm ERJ-140 1,650nm In Service Since 1998 Since 2000 Embraer 170 2,100nm ERJ-145 1,550nm Since 1995 Since 2004 Embraer 175 2,000nm Embraer 190 2400nm Since 2005 44 PAX 50 PAX PAX 78 – 88 PAX 98 – 114 PAX 108 – 122 PAX Honeywell Primus 1000 Primus Epic Since 2006 Embraer 195 2200nm PBN and Regional Aircraft
3
Regional Aircraft Scenario
Introduction – Basic Assumptions Constructed based on NextGen Operational Statistic (Commercial Aircraft Fleet Readiness Estimative) given by FAA Equipment Interoperability Other Transaction Agreement Project.*Additional information with Mr. Ronald L. Stroup - PBN NextGEN Operations Definition: World wide Commercial Aircraft Fleet Classification : Regional Aircraft: ERJ-135/140/145, E 170/175, Dash8/Q400, CRJ100/200, CRJ700, CRJ900/705, CRJ1000 Wide-body: , 747-8, 767, 777, 787, A300, A330/340,A380, A350 Narrow-body: 737NG Family, A320 Family, E 190/195, CS100, CS300 PBN and Regional Aircraft
4
PBN and Regional Aircraft
Enroute Operations Basic Interim PBN and Regional Aircraft
5
Terminal Operations (SID, STARS)
Basic Interim PBN and Regional Aircraft
6
Approaches Operations
Basic Interim PBN and Regional Aircraft
7
AR Approaches Operations
Basic Interim PBN and Regional Aircraft
8
Conclusion – Are we ready to go?
Basic RNAV capability already can bring significant benefits: Enroute optimization (using RNAV 5, RNAV 1 and 2), improving capacity and reducing fuel consumption, noise levels, etc.; Replacing conventional routes with RNAV routes leads to reduced maintenance of conventional navaids (eg:NDB, VOR); Terminal airspace optimization and reduced controller-pilot communication. Improves the predictability and situational awareness since it creates a repeatable ground track and patterns of depature and arrival. PBN and Regional Aircraft
9
Conclusion – Are we ready to go?
Many of the current regional aircraft cannot meet more stringent PBN requirements without retrofits that are often too costly, e.g.: incorporation of a VNAV capability, inertial, etc. Due to current forecasts of service, the economics to justify such retrofit costs may not exist. Therefore we recommend: To explore more the use of RNAV basic capabilities; Consider that for more stringent requirements, the future airspace must accommodate those aircraft without major operational restrictions; Exemptions for mandates need to be considered; Standards and Requirements need to be frozen in advance of the expected entry into service. In general 3-5 years is necessary; Developments based on preliminary standards add risks and possible re-work. PBN and Regional Aircraft
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.