Download presentation
Presentation is loading. Please wait.
1
September 2008 doc.: IEEE /1003r0 July 2009 802.11aa – Robust Audio Video Transport Streaming San Francisco Closing Report Date: Authors: Ganesh Venkatesan, Intel Corporation Alex Ashley, NDS Ltd
2
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 July 2009 Abstract TGaa Closing Report for the IEEE San Francisco Session (July 2009) Slide 2 Ganesh Venkatesan, Intel Corporation Page 2 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems
3
July 2009 Goals for the session Discuss [, adopt] proposals corresponding to graceful degradation and intra-AC [, intra-stream] prioritization OBSS Converge on the TGaa solution to OBSS Discuss TGaa goals for OBSS with TGac Joint meeting with 802.1AVB: TSpec mapping Triggered k traffic stream/category statistics Other requirements on that may be useful to AVB Resolve comments from Internal review of Draft D0.01 Review timeline Ganesh Venkatesan, Intel Corporation
4
Technical Presentations
July 2009 Technical Presentations Stream Classification Service (09/725r0) Implementation for Intra-AC Differentiated Services (09/0022r1) Applicability of .11s MCCA to HCCA OBSS (09/660r3) OBSS Sharing with Access Fraction (09/662r2) 40MHz Channel Selection (09/740r0) HCCAOP Scheme – Efficiency and Sharing 09/666r3) Proposal for OBSS (09/757r0) Agenda for the joint meeting with 802.1AVB (09/787r0) 20MHz versus 40MHz for Video (09/805r0) OSQAP OBSS Requirements Compliancy (09/882r0) Neighborhood Capture and OBSS (09/844r0) Slide 4 Ganesh Venkatesan, Intel Corporation
5
Accomplishments Listened to 11 technical presentations
July 2009 Accomplishments Listened to 11 technical presentations Adopted the Drop Precedence submission into TGaa draft (726r1) Listened to the complete OBSS solution (757r1) and started evaluating the proposal against the requirements document. Met jointly with 802.1AVB (see next slide) Decided not to meet in the September Interim Teleconference schedule Timeline review and noted a 4 month slip Ganesh Venkatesan, Intel Corporation
6
Topics at the Joint meeting with 802.1AVB
September 2008 November 2007 doc.: IEEE /2752r1 doc.: IEEE /1003r0 July 2009 Topics at the Joint meeting with 802.1AVB What is the worst case delay when streaming under different conditions over a link? Is there a mechanism specified in to propagate the worst case delay under current conditions, to upper layers? TSPEC mapping to 802.1Qav TSPEC How are QoS errors fed back from the MAC? SRP over – need for relaying stream information (09/403r0) – list choices, pros/cons of each for discussion jointly Status Update on aa Status Update on v Goals for the November 2009 joint meeting Slide 6 Ganesh Venkatesan, Intel Corporation Page 6 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems
7
TGaa will not be meeting in Waikoloa
July 2009 Interim – September 2009 TGaa will not be meeting in Waikoloa Ganesh Venkatesan, Intel Corporation
8
802.1Qat Sponsor Ballot Pool
July 2009 802.1Qat Sponsor Ballot Pool 802.1Qat will be forming a sponsor ballot pool soon Encourage all SA members interested in 802.1Qat (and how it should work with ) to join the pool Ganesh Venkatesan, Intel Corporation
9
Goals for the November Plenary
July 2009 Goals for the November Plenary Complete internal review, compile comments and resolve them Start November Plenary with Draft 0.02 Complete tasks that came out of the joint meeting with AVB Listen to technical proposals Make progress toward addressing all PAR scope items Meet jointly with 802.1AVB Ganesh Venkatesan, Intel Corporation
10
Mondays 11:00-12:30 Hrs ET on the following days:
July 2009 Teleconferences Mondays 11:00-12:30 Hrs ET on the following days: July 27, Aug 10, Aug 24, Sep 07, Oct 19, Nov 02 and Nov 30. Ganesh Venkatesan, Intel Corporation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.