Download presentation
Presentation is loading. Please wait.
1
Service Across Multiple Transmission Systems
This presentation shows the steps that a Customer must take on OASIS to establish and coordinate requests on multiple transmission systems. The following slides show how to Submit a Coordinated Request (CR) Document the other requests in the Coordinated Group (CG) Attest that all of the Coordinated Group information meets the NAESB requirements Update the status of other CRs in the CG Approve, Adjust or Withdraw the CR
2
Service Across Multiple Transmission Systems
PTP Service Across Multiple Transmission Systems A new Coordinated Request (CR) Must be Preconfirmed Must set CG Status = PROPOSED
3
Service Across Multiple Transmission Systems
Secondary A new Coordinated Request (CR) Must be Preconfirmed Must set CG Status = PROPOSED
4
Service Across Multiple Transmission Systems
DNR A new Coordinated Request (CR) Must be Preconfirmed Must set CG Status = PROPOSED Must right click to add Auxiliary Transmission. Complete CR Provider, CR AssignRef, CR ServiceIncrement, CR TSClass, CR TSType, CR Disposition
5
Service Across Multiple Transmission Systems
PTP Service Across Multiple Transmission Systems After the CR is submitted, the TSR Detail screen will show: The CG Status will display the “PROPOSED” hyperlink The CG Deadline will be the Queue Time + 24 hours.
6
Service Across Multiple Transmission Systems
Secondary After the CR is submitted, the Secondary Detail screen will show: The CG Status will display the “PROPOSED” hyperlink The CG Deadline will be the Queue Time + 24 hours.
7
Service Across Multiple Transmission Systems
DNR After the CR is submitted, the DNR Detail screen will show: The CG Status will display the “PROPOSED” hyperlink The CG Deadline will be the Queue Time + 24 hours.
8
Service Across Multiple Transmission Systems
PTP Service Across Multiple Transmission Systems Before the 24-hour deadline, the Customer must enter on OASIS the information about all of the Coordinated Requests and/or Reservations in the Coordinated Group (CG) that are made on other Transmission systems. Click on the “PROPOSED” hyperlink in the TSR Detail screen to bring up the “New Coordinated Group” screen. Enter information on each of the other requests and/or reservations. DO NOT ENTER information on the DEC CR (in example do not enter info on request # ). For Each CR or reservation, enter the following information: Transmission Provider, CR Disposition, CR Assignment Ref, CR Increment, CR TS Type. A popup list of Assignment Refs is available for CRs or reservations that are on another transmission system supported by OATI. When available, much of the information is filled in when the Assignment Ref is selected. Be sure to check that all required information is provided. NITS info will/may have to be entered manually into PTP Coordinated Groups.
9
Service Across Multiple Transmission Systems
Secondary and DNR Before the 24-hour deadline, the Customer must enter on OASIS the information about all of the Coordinated Requests and/or Reservations in the Coordinated Group (CG) that are made on other Transmission systems. Click on the button in the Secondary Detail screen, then right click and add “Auxiliary Transmission” template. Enter information on each of the other requests and/or reservations. DO NOT ENTER information on the DEC CR. For Each CR or reservation, enter the following information: CR Primary Provider, CR Assignment Ref, CR Service Increment, CR TS Class, CR TS Type, CR Disposition. A popup list of Assignment Refs is available for CRs or reservations that are on another transmission system supported by OATI. When available, much of the information is filled in when the Assignment Ref is selected. Be sure to check that all required information is provided.
10
Service Across Multiple Transmission Systems
PTP Service Across Multiple Transmission Systems After providing the information on all the requests and reservations in the Coordinated Group in the “New Coordinated Group” screen, the Customer must attest that all of the Coordinated Group information meets the NAESB requirements. If the attestation is not done by the CG Deadline, the status of the CR will be set to INVALID. To begin this process, open the TSR Detail screen and click the “Customer Update” button at the top of the screen.
11
Service Across Multiple Transmission Systems
Secondary After providing the information on all the requests and reservations in the Coordinated Group in the “Update Coordinated Group” screen, the Customer must attest that all of the Coordinated Group information meets the NAESB requirements. If the attestation is not done by the CG Deadline, the status of the CR will be set to INVALID. To begin this process, open the Secondary Detail screen and click the button at the top of the screen.
12
Service Across Multiple Transmission Systems
DNR Service Across Multiple Transmission Systems After providing the information on all the requests and reservations in the Coordinated Group in the “Update Coordinated Group” screen, the Customer must attest that all of the Coordinated Group information meets the NAESB requirements. If the attestation is not done by the CG Deadline, the status of the CR will be set to INVALID. To begin this process, open the DNR Detail screen and click the button at the top of the screen.
13
Service Across Multiple Transmission Systems
PTP Service Across Multiple Transmission Systems To attest that all of the Coordinated Group information meets the NAESB requirements Change the CG Status to “ATTESTED” Click on the Submit Changes button at the top of the screen
14
Service Across Multiple Transmission Systems
Secondary Service Across Multiple Transmission Systems To attest that all of the Coordinated Group information meets the NAESB requirements Change the CG Status to “ATTESTED” Click on the Submit Changes button at the top of the screen
15
Service Across Multiple Transmission Systems
DNR Service Across Multiple Transmission Systems To attest that all of the Coordinated Group information meets the NAESB requirements Change the CG Status to “ATTESTED” Click on the Submit Changes button at the top of the screen
16
Service Across Multiple Transmission Systems
PTP Service Across Multiple Transmission Systems The Customer must monitor the status of each Coordinated Request on other transmission systems and update the information in the “New Coordinated Group” screen. Click on the “ATTESTED” hyperlink in the TSR Detail screen to bring up the “Update Coordinated Group” screen. Set the (CR) Disposition Set the (CR) Disposition Time equal to the Date and Time the request status was changed. TSR Status (CR) Disposition CR_ACCEPTED FULL CR_COUNTEROFFER PARTIAL WITHDRAWN prior to TP changing status WITHDRAWN Any other status NONE
17
Service Across Multiple Transmission Systems
Secondary and DNR The Customer must monitor the status of each Coordinated Request on other transmission systems and update the information in the “Auxiliary Transmission” template. Click on the “Assignment Ref” hyperlink in the TSR Detail screen to bring up the “AddNITSDNR Details” screen. Click the button. Set the (CR) Disposition Set the (CR) Disposition Time equal to the Date and Time the request status was changed. Disposition Time auto fills for CRs on another transmission system supported by OATI for PTP. TSR Status (CR) Disposition CR_ACCEPTED FULL CR_COUNTEROFFER PARTIAL WITHDRAWN prior to TP changing status WITHDRAWN Any other status NONE
18
Service Across Multiple Transmission Systems
Finalizing the Coordinated Request The Customer may confirm a CR that has a status of CR_ACCEPTED or CR_COUNTEROFFER at any time. Once the Customer sets the status to CONFIRMED no further action will be available to modify capacity. The Customer may withdraw a CR that has a status of CR_COUNTEROFFER at any time. Once the Customer sets the status to WITHDARAWN no further action will be available to modify capacity. The Customer may wait to finalize the status of the CR until all the CRs in the CG have been acted on by their respective Transmission Providers.
19
Service Across Multiple Transmission Systems
Finalizing the Coordinated Request When all Transmission Providers have responded to the CRs and all (CR) Dispositions have been changed from PENDING in the “Update Coordinated Group” screen a Response deadline will be calculated and posted on the CR on the Duke system. If any or all of the CRs in the CG were accepted in full as requested, the Customer is to change the status of the CR on the Duke system to CONFIRMED. If the status in not changed by the Response deadline, OASIS will change the status to CONFIRMED. If any of the CRs in the CG were not accepted in full as requested, the Customer has the option to lower the capacity granted by Duke. If Duke set the status to CR_ACCEPTED, the Customer may change the status to CONFIRMED, REBID or WITHDRAWN. All rebids to lower capacity will be approved by Duke. If Duke set the status to CR_COUNTEROFFER, the Customer may change the status to CONFIRMED, REBID or WITHDRAWN. All rebids to lower capacity will be approved by Duke. If the Customer fails to respond by the Response deadline OASIS will take the following actions: Change the status to CONFIRMED for a CR with the status of CR_ACCEPTED Change the status to RETRACTED for a CR with the status of CR_COUNTEROFFER
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.