Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Snapshot May ‘10 Date: Authors: Name Company Address

Similar presentations


Presentation on theme: "WG11 Snapshot May ‘10 Date: Authors: Name Company Address"— Presentation transcript:

1 WG11 Snapshot May ‘10 Date: 2010-05-16 Authors: Name Company Address
doc.: IEEE /0463r1 May 2010 WG11 Snapshot May ‘10 Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 May 2010 doc.: IEEE /0463r1 May 2010 WG11 Task Group TGp PAR expires Dec 31, TGu PAR expires Dec 31, 2010 TGs PAR expires Dec 31, TGv PAR expires Dec 31, 2010 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

3 WG11 Task & Study Group Officers
May 2010 doc.: IEEE /0463r1 May 2010 WG11 Task & Study Group Officers Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Matthew Gast Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteener Guido Hertz Kazuyuki Sakoda Stephen Rayment U Necati Canpolat Dave Stephenson V Dorothy Stanley Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, John Barr AE AF Richard Kennedy Zhou Lan SC WNG Clint Chaplin ARC David Bagby AH JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

4 May 2010- WG11 Task & Study Group Officers
doc.: IEEE /0463r1 May 2010 May WG11 Task & Study Group Officers Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Matthew Gast Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteener Guido Hertz Kazuyuki Sakoda Stephen Rayment U Necati Canpolat Dave Stephenson V Dorothy Stanley Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, John Barr AE AF Richard Kennedy Zhou Lan SC WNG Clint Chaplin ARC David Bagby AH JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

5 May 2010- WG11 Task & Study Group Officers - Results
doc.: IEEE /0463r1 May 2010 May WG11 Task & Study Group Officers - Results Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteener Guido Hertz Kazuyuki Sakoda Guenal Strutt U Necati Canpolat Dave Stephenson V Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, James Yee AE AF Richard Kennedy Zhou Lan SG S1G Dave Halasz FIA Hiroshi Mano Marc Emmelmann Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

6 IEEE 802.11 Standards Pipeline
May 2010 doc.: IEEE /0463r1 May 2010 IEEE Standards Pipeline 802.11mb Maintenance k+r+y 802.11z TDLS MAC 802.11aa Video Transport e QoS 802.11s Mesh 802.11u WIEN 802.11r Fast Roam h DFS & TPC 802.11k RRM 802.11V Network Management i Security 802.11Y Contention Based Protocol Smart Grid f Inter AP 802.11ae QoS Mgmt Frm 802.11p WAVE FIA 802.11af TVWS a 54 Mbps 5GHz S1G 802.11n High Throughput (>100 Mbps) g 54 Mbps 2.4GHz 802.11ac VHT 5GHz 802.11W Management Frame Security 802.11ad VHT 60GHz 802.11b (’99) 11 Mbps 2.4GHz Published Amendment Discussion Topics Study groups TG without draft TG Letter Ballot Sponsor Ballot Published Standard PHY Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

7 WG11 Editor Abstract / Agenda – May 2010
March 2010 July 2007 May 2010 doc.: IEEE /0990r1 doc.: IEEE /0463r1 May 2010 May 2010 WG11 Editor Abstract / Agenda – May 2010 Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process Amendment Ordering / ANA Status / Draft Snapshots RevCom preparation process discussion Conference Call? Slide 7 Slide 7 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 7 Page 7 Bruce Kraemer (Marvell) Terry Cole (AMD) Bruce Kraemer (Marvell)

8 WNG SC – May 2010 Review of objectives
doc.: IEEE /0463r1 May 2010 WNG SC – May 2010 Review of objectives Carrier-Grade Operating in Paired Spectrum ( wng-carrier-grade operating-in-paired-spectrum.pptx) – Roberto Aiello Introduction to OTA Testing of MIMO Devices ( ac-introduction-to-ota-testing-of-mimo-devices.pdf) - Garth Hillman Review Objectives for July 2010 Meeting Bruce Kraemer (Marvell) Page 8 Bruce Kraemer (Marvell)

9 No meeting in May session Primary Topics for 802 Plenaries
doc.: IEEE /0547r0 doc.: IEEE /0463r1 May 2010 IEEE ARC SC – May 2010 ARC SC No meeting in May session Primary Topics for 802 Plenaries 802.1 architecture document revision effort Impacts to .11 Interface approach Interested .11 Members Slide 9 David Bagby (Calypso Ventures, Inc) Bruce Kraemer (Marvell) Page 9 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

10 May 2010 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0463r1 May 2010 TGmb May 2010 Summary Draft 3.0 was balloted in LB162 between March 2010 & May 2010 meetings LB 162 votes = 167 affirmative (increase of 1) LB 162 comments = 149 comments (decrease of 97) TGmb is actively seeking a new chair Matthew Gast has changed affiliation and will not be attending regularly Major task of this meeting is comment resolution Anticipate start of sponsor ballot process at July meeting Slide 10 Bruce Kraemer (Marvell) John Doe, Some Company Page 10 Bruce Kraemer (Marvell) John Doe, Some Company

11 TGp Snapshot for May 2010 Conditional approval obtained in March
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0463r1 May 2010 TGp Snapshot for May 2010 Conditional approval obtained in March Sponsor Ballot #2 passed, 99.2 % affirmative (1 no vote remained ) 0 comments Submitted approval package to RevCom Slide 11 Lee Armstrong (Armstrong Consulting, Inc.) Bruce Kraemer (Marvell) Page 11 Bruce Kraemer (Marvell) John Doe, Some Company

12 November 2009 May 2010 September 2009 doc.: IEEE xxx doc.: IEEE /0547r0 doc.: IEEE /0463r1 May 2010 May 2010 IEEE s Mesh Networking TGs Draft 5.0 passed LB#161 (closing April 15) with 89% approval and 421 comments. The official announcement counted 313 comments, and there were 108 late arrivals. TGs will vote on the inclusion of these, monday The current comment resolution spread sheet is 11-10/478r1. See table below for comments overview. TGs draft agenda is in submission 11-10/0519r1. The focus is on comment resolution TGs will have leadership elections on Monday editorial technical Comments from LB 161 107 35% 206 65% Plus “late arrivals” 150 271 Slide 12 Slide 12 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 12 Page 12 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

13 IEEE 802.11u – May 2010 Review of Teleconferences
doc.: IEEE /0547r0 doc.: IEEE /0463r1 May 2010 IEEE u – May 2010 Review of Teleconferences Completed 1st Re-circulation Sponsor Ballot Comment Resolution Joint meeting with FIA SG Liaisons Agenda in document r0 Slide 13 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 13 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

14 IEEE 802.11v – May 2010 This week Agenda in document 11-10-0523
doc.: IEEE /0463r1 May 2010 IEEE v – May 2010 This week Comment Resolution, Third Recirculation Sponsor Ballot Agenda in document Second Recirculation SB (closed 13 April 2010) results 161 in ballot pool, 122/18/6 Y/N/A : 87% approve, 13% disapprove 1181 comments received, 1156 Technical, 20 Editorial, 5 General (1040 comments expand/duplicate 7 prior ballot comments) Comments in First Recirculation SB (closed 17 Feb 2010) results 161 in ballot pool, 112/23/6 Y/N/A : 83.6% approve, 16.4% disapprove 1045 comments received, 988 Technical, 34 Editorial, 23 General (935 comments expand/duplicate 7 prior ballot comments) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

15 May 2010 IEEE z – May 2010 Beijing The second z Recirculation Sponsor Ballot passed with 94% approval rate 121 yes, 8 no, 7 abstain 15 comments received TGz has 4 timeslots this week to work on comment resolution A third recirculation SB is expected after the Beijing meeting Slide 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 IEEE 802.11aa – Beijing, China Goals for the Beijing Meeting:
May 2010 May 2008 doc.: IEEE /0463r1 doc.: IEEE /xxxxr0 May 2010 May 2010 IEEE aa – Beijing, China Goals for the Beijing Meeting: Listen to technical proposal(s) Complete Draft 0.05 comment resolution Approve Draft 1.0 and kickoff WG letter Ballot Opening report in document 10/0521r0 Slide 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 May 2010 May 2008 doc.: IEEE /0463r1 doc.: IEEE /xxxxr0 May 2010 May 2010 IEEE ac – May 2010 Continue with Ad Hoc group meetings and straw polls Continue the development of the Specification Framework document. TG approved documents: r12, TGac Channel Addendum Document r5, ac Proposed Selection Procedure r12, TGac Functional Requirements and Evaluation Methodology r9, Proposed Specification Framework for TGac Technical contributions Agenda in document r0 Slide 17 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 17 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

18 TGad – Meeting Goals Complete proposal presentations
May 2010 doc.: IEEE /0463r1 May 2010 TGad – Meeting Goals Complete proposal presentations New Technique proposal presentations Continue working on enterprise cubicle model of the channel model document Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

19 TGae May 2010 Summary Elect Task Group Officers
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0463r1 May 2010 TGae May 2010 Summary Elect Task Group Officers Task Group working documents: Goal is to entertain technical proposals and create initial draft for TGae. Revise plan of record. Slide 19 Bruce Kraemer (Marvell) John Doe, Some Company Page 19 Bruce Kraemer (Marvell) John Doe, Some Company

20 TGaf – Meeting Goals May 2010
Task Group officer elections Review regulatory landscape Review Technical Review comments Make necessary edits to the draft Plan for July Plenary in San Diego Slide 20 Slide 20 Bruce Kraemer (Marvell)

21 May 2010 May 2008 doc.: IEEE /0463r1 doc.: IEEE /0547r0 May 2010 May 2010 IEEE JTC1 ad hoc – May 2010 The agenda items that will be addressed this week are: Approval of minutes from previous meetings Review goals of JTC1 ad hoc Review status of Sponsor Ballot drafts sent to ISO/IEC JTC1/SC6 Discuss possible liaison to ISO/IEC JTC1/SC6 regarding Sponsor Ballot draft review process Review WAPI status in ISO/IEC JTC1/SC6 Discuss any other JTC1/SC6 liaison matters Slide 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 21 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

22 Regulatory Ad Hoc Committee Meeting Goals May 2010
The regulatory summaries Regulatory issues status The FCC Net Neutrality plan EN revision update FCC 5 GHz rules changes update FCC TVWS rules Critical issues actions TBD Slide 22 Bruce Kraemer (Marvell)

23 Approve PAR & 5c for full WG approval motion
May 2010 May 2010 S1G – Meeting Goals May 2010 Create PAR & 5 criteria Approve PAR & 5c for full WG approval motion Slide 23 Slide 23 Bruce Kraemer (Marvell)

24 Smart Grid – May 2010 Monday pm1
doc.: IEEE /0463r1 May 2010 Smart Grid – May 2010 Monday pm1 Open Forum for discussing in depth what WG11 should do to service requirements for NIST Smart Grid PAP#2 Thursday am1 Open Forum for discussing in depth what 802 should do to service requirements for NIST Smart Grid NIST PAP#2 Update of activities in P2030 Open SG Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

25 May 2010 Recent Ballots Bruce Kraemer (Marvell)

26 TGmb – WG recirculation
May 2010 TGmb – WG recirculation  Ballot #162  was a 25 day Working Group technical recirculation Ballot asking the question "Should P802.11mb D3.0 be forwarded to Sponsor Ballot?".   Results: Ballot Opening Date:    Wednesday              March31, 2010 - 23:59 ET Ballot Closing Date:      Sunday                       Apr 25, 2010 - 23:59 ET  246 eligible people are in this ballot group    167 affirmative votes     20 negative votes      25 abstention votes ===     212 votes received =  86.2% valid returns                            =  11.8% valid abstentions   167  affirmative votes       =      89.3 % affirmative   20  total negative votes  =      10.7 % negative Motion passes. There were 149 comments received. Bruce Kraemer (Marvell)

27 P802.11s – WG Recirculation May 2010
IEEE WG Letter Ballot #161 was a  15 day Working Group technical recirculation Ballot asking the question "Should P802.11s D5.0 be forwarded to Sponsor Ballot?".   Results: Ballot Opening Date:    Wednesday              Mar 31, 2010 - 23:59 ET Ballot Closing Date:      Thursday                   Apr 15, 2010 - 23:59 ET  248 eligible people are in this ballot group.    159 affirmative votes     19 negative votes      32 abstention votes ===     210 votes received =  84.68% valid returns                           =  15.24% valid abstentions 159  affirmative votes       =      % affirmative 19  total negative votes  =      10.67 % negative Motion passes. There were 323 comments received. Bruce Kraemer (Marvell)

28 P802.11u - 1st Sponsor recirculation
May 2010 P802.11u - 1st Sponsor recirculation The 15 day IEEE P802.11u (Interworking with External Networks) 1st recirculation Sponsor Ballot asked the question “Should  P802.11u  Draft 9.0 be forwarded to RevCom?” Results: Ballot Opening Date:    Thursday        April 08 , 2010 - 23:59 ET Ballot Closing Date:       Friday               April 23, 2010 - 23:59 ET  154 eligible people are in this ballot group.   115 affirmative votes   10 negative votes with comments     2 negative votes without comments   13 abstention votes ======= 140  votes received  =  90.1 %   returns                            =   9.3% valid abstentions   115  affirmative votes       =      92.0 % affirmative   10  total negative votes   =      8.0  % negative Motion passes There were 127 comments received Bruce Kraemer (Marvell)

29 P802.11v – 2nd Sponsor Recirculation
May 2010 P802.11v – 2nd Sponsor Recirculation The IEEE P802.11v (Wireless Network Management) 15 day 2nd recirculation Sponsor Ballot asked the question “Should  P802.11v  Draft 10.0 be forwarded to RevCom?” Results: Ballot Opening Date:    Monday        March 29 , 2010 - 23:59 ET Ballot Closing Date:      Tuesday         April 13, 2010 - 23:59 ET  161 eligible people are in this ballot group.     122 affirmative votes   18 negative votes with comments     0 negative votes without comments     6 abstention votes ======= 146  votes received  =  90.7% valid returns                           =    4.1 % valid abstentions   122  affirmative votes         =     87.1 % affirmative   18  total negative votes    =      12.9  % negative The Motion passes. There were 1181 comments received Bruce Kraemer (Marvell)

30 P802.11p – 2nd Sponsor Recirculation
May 2010 P802.11p – 2nd Sponsor Recirculation The 2nd IEEE P802.11p (Wireless Access in Vehicular Environments) 15 day recirculation Sponsor Ballot asked the question “Should  P802.11p  Draft 11.0 be forwarded to RevCom?” The official results for this Sponsor Ballot  follow: Ballot Opening Date:    Tuesday                    March 23, 2010 - 23:59 ET Ballot Closing Date:      Wednesday              April 07, 2009 - 23:59 ET  164 eligible people are in this ballot group    131 affirmative votes     1 negative votes with comments     0 negative votes without comments   13 abstention votes ======= 145  votes received  =  88.4 % valid returns                            =    9.0% valid abstentions   131  affirmative votes       =      99.2 % affirmative     1  total negative votes    =      0.8  % negative Submitted to RevCom. Bruce Kraemer (Marvell)

31 P802.11z - 2nd Sponsor Recirculation
May 2010 P802.11z - 2nd Sponsor Recirculation The second IEEE P802.11z (Extensions to Direct Link Setup) 15 day recirculation Sponsor Ballot asked the question “Should  P802.11z  Draft 8.0 be forwarded to RevCom?” Ballot Opening Date:    Monday             April 19, 2010 - 23:59 ET Ballot Closing Date:     Tuesday               May 04, 2010 - 23:59 ET  Results: 144 eligible people are in this ballot group.     121 affirmative votes     8 negative votes with comments     0 negative votes without comments     7 abstention votes ======= 136  votes received  =  94.4 % valid returns                           =   5.1% valid abstentions 121  affirmative votes       =      93.8 % affirmative    8  total negative votes    =     6.2  % negative The motion passes. There were 15 comments received Bruce Kraemer (Marvell)


Download ppt "WG11 Snapshot May ‘10 Date: Authors: Name Company Address"

Similar presentations


Ads by Google