Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Snapshot July ‘10 Date: Authors: Name Company Address

Similar presentations


Presentation on theme: "WG11 Snapshot July ‘10 Date: Authors: Name Company Address"— Presentation transcript:

1 WG11 Snapshot July ‘10 Date: 2010-07-10 Authors: Name Company Address
doc.: IEEE /0692r0 July 2010 WG11 Snapshot July ‘10 Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 July 2010 doc.: IEEE /0692r0 July 2010 WG11 Task Group TGp PAR expires Dec 31, TGu PAR expires Dec 31, 2010 TGs PAR expires Dec 31, TGv PAR expires Dec 31, 2010 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

3 WG11 Task & Study Group Officers - Roster
July 2010 doc.: IEEE /0692r0 July 2010 WG11 Task & Study Group Officers - Roster Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U Necati Canpolat Dave Stephenson V Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordeiro AE AF Richard Kennedy Zhou Lan SG S1G Dave Halasz FIA Hiroshi Mano Marc Emmelmann Ad hoc ARC Dave Bagby Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

4 WG11 Task & Study Group Officers – July adjustments
doc.: IEEE /0692r0 July 2010 WG11 Task & Study Group Officers – July adjustments Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Peter Ecclesine Stephen McCann TG Mb Dorothy Stanley Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteneer Guido Hiertz Kazuyuki Sakoda Guenael Strutt U Necati Canpolat Dave Stephenson V Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, James Yee Carlos Cordieiro AE AF Richard Kennedy Zhou Lan SG S1G Dave Halasz FIA Hiroshi Mano Marc Emmelmann Ad hoc ARC Dave Bagby Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open Bruce Kraemer (Marvell)

5 IEEE 802.11 Standards Pipeline
July 2010 doc.: IEEE /0692r0 July 2010 IEEE Standards Pipeline 802.11mb Maintenance k+r+y 802.11z TDLS MAC 802.11aa Video Transport e QoS 802.11s Mesh 802.11u WIEN 802.11r Fast Roam h DFS & TPC 802.11k RRM 802.11V Network Management i Security 802.11Y Contention Based Protocol Smart Grid f Inter AP 802.11ae QoS Mgmt Frm 802.11p WAVE FIA 802.11af TVWS a 54 Mbps 5GHz S1G 802.11n High Throughput (>100 Mbps) g 54 Mbps 2.4GHz 802.11ac VHT 5GHz 802.11W Management Frame Security 802.11ad VHT 60GHz 802.11b (’99) 11 Mbps 2.4GHz Published Amendment Discussion Topics Study groups TG without draft TG Letter Ballot Sponsor Ballot Published Standard PHY Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

6 WG11 Editor Abstract / Agenda – July 2010
March 2010 July 2007 July 2010 doc.: IEEE /0990r1 doc.: IEEE /0692r0 July 2010 July 2010 WG11 Editor Abstract / Agenda – July 2010 Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process Amendment Ordering / ANA Status / Draft Snapshots RevCom preparation process discussion Conference Call? Slide 6 Slide 6 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 6 Page 6 Bruce Kraemer (Marvell) Terry Cole (AMD) Bruce Kraemer (Marvell)

7 WNG SC – July 2010 Review of objectives <TBD>
May 2008 July 2010 doc.: IEEE /0692r0 July 2010 WNG SC – July 2010 Review of objectives <TBD> Review Objectives for September 2010 Meeting Bruce Kraemer (Marvell) Page 7 Bruce Kraemer (Marvell)

8 IEEE 802.11 ARC SC – July 2010 802.11 ARC SC meets “as needed”
May 2008 doc.: IEEE /0692r0 doc.: IEEE /0547r0 July 2010 July 2010 IEEE ARC SC – July 2010 ARC SC meets “as needed” Topics for July 802 Plenary 802.1 architecture document revision effort There were no meetings re the architecture revision project between March and July Last minute change- Not meeting in July Slide 8 David Bagby (Calypso Ventures, Inc) Bruce Kraemer (Marvell) Page 8 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

9 July 2010 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0692r0 July 2010 TGmb - July 2010 Draft 4.0 was balloted in LB163 between May & July 2010 meetings LB 163 votes = Pool 246, 164 affirmative – 89%, 20 Disapprove, 28 Abstain LB 163 comments = 98 comments Major task of this meeting is comment resolution, agenda in Anticipate requesting EC conditional approval for sponsor ballot at this July meeting Plan to incorporate published amendments (11p, 11z, 11v, 11u) during SB process Slide 9 Bruce Kraemer (Marvell) John Doe, Some Company Page 9 Bruce Kraemer (Marvell) John Doe, Some Company

10 July 2010 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0692r0 July 2010 TGp Snapshot for July 2010 Conditional approval by EC to submit to RevCom obtained in March Conditional approval conditions met in April RevCom package submitted in April RevCom/Stds Board approval granted in June Publication target July 2010 Press release target July 2010 Awards target September 2010 Slide 10 Lee Armstrong (Armstrong Consulting, Inc.) Bruce Kraemer (Marvell) Page 10 Bruce Kraemer (Marvell) John Doe, Some Company

11 November 2009 July 2010 September 2009 doc.: IEEE xxx doc.: IEEE /0547r0 doc.: IEEE /0692r0 July 2010 July 2010 IEEE s Mesh Networking TGs Draft 6.0 passed LB#165 (closing April 15) with 88% approval and 232 comments. The official announcement erroneously counted 191 comments Approval rate was down by 0.5% from previous LB #161 The current comment resolution spread sheet is 11-10/725r2. See table below for comments overview. TGs draft agenda is in submission 11-10/0735r1. The focus is on comment resolution editorial technical Comments from LB 165 89 38% 143 62% Slide 11 Slide 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 11 Page 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

12 IEEE 802.11u – July 2010 Review of Teleconferences
May 2008 doc.: IEEE /0547r0 doc.: IEEE /0692r0 July 2010 IEEE u – July 2010 Review of Teleconferences 2nd Re-circulation Sponsor Ballot Comment Resolution Possible Conditional RevCom Approval Liaisons Agenda in document r0 Slide 12 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 12 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

13 July 2010 doc.: IEEE /0692r0 July 2010 TGv – July 2010 This week Comment resolution, recirculation SB, request conditional approval from EC to go to Revcom; Agenda in document Third Recirculation SB (closed 10 June 2010) results 161 in ballot pool, 130/11/6 Y/N/A : 92% approve, 8% disapprove 1087 comments received, 1076 Technical, 7 Editorial, 4 General (1037 comments expand/duplicate 7 prior ballot comments) Comments in Fourth Recirculation SB (closed 7 July 2010) results 161 in ballot pool, 133/8/7 Y/N/A : 94% approve, 6% disapprove 1074 comments received, 1067 Technical, 2 Editorial, 5 General Comments in Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

14 July 2010 IEEE z – July San Diego The third z Recirculation Sponsor Ballot passed with 94% approval rate 123 yes, 6 no, 7 abstain 12 comments received TGz has 3 timeslots this week to work on comment resolution A fourth recirculation SB is expected after the San Diego meeting Slide 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

15 IEEE 802.11aa – San Diego, California
July 2010 May 2008 doc.: IEEE /0692r0 doc.: IEEE /xxxxr0 July 2010 July 2010 IEEE aa – San Diego, California Goals: Listen to technical proposal(s) Joint meeting with 802.1AVB Resolve Letter Ballot comments Opening report in document 10/0xxxr0 Slide 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 July 2010 May 2008 doc.: IEEE /0692r0 doc.: IEEE /xxxxr0 July 2010 July 2010 IEEE ac – July 2010 Continue with Ad Hoc group meetings and straw polls Continue the development of the Specification Framework document. TG approved documents: r5 is the approved TGac Selection Procedure document. r2 is the approved TGac Usage Model document . r12 is the approved TGac Channel Models Addendum document. r14is the approved TGac Functional Requirements and Evaluation Methodology document r11 is the approved TGac Specification Framework document. Technical contributions Agenda in document r0 Slide 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 TGad – July Meeting Goals
doc.: IEEE /0692r0 July 2010 TGad – July Meeting Goals Comment resolution on D0.1 ITU-R 60 GHz liaison Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

18 TGae July 2010 Summary Find a TG Editor and TG Secretary
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0692r0 July 2010 TGae July 2010 Summary Find a TG Editor and TG Secretary Task Group working documents: Produce TGae draft for Working Group Review. Revise plan of record. Slide 18 Bruce Kraemer (Marvell) John Doe, Some Company Page 18 Bruce Kraemer (Marvell) John Doe, Some Company

19 TGaf – Meeting Goals July 2010
Review regulatory landscape Resolve Technical Review comments Make necessary edits to the draft Plan for September Interim in Waikoloa Slide 19 Slide 19 Bruce Kraemer (Marvell)

20 July 2010 May 2008 doc.: IEEE /0692r0 doc.: IEEE /0547r0 July 2010 July 2010 IEEE JTC1 ad hoc – July 2010 The agenda items that will be addressed this week are: Approval of minutes from previous meetings Review goals of JTC1 ad hoc Review status of Sponsor Ballot drafts sent to ISO/IEC JTC1/SC6 Discuss status of liaison sent to ISO/IEC JTC1/SC6 in June 2010 Appoint an IEEE 802 representative to SC6 meeting in Sept 10 Review WAPI status in ISO/IEC JTC1/SC6 Discuss any other JTC1/SC6 liaison matters Slide 20 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 20 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

21 Regulatory Ad Hoc Committee Meeting Goals July 2010
The regulatory summaries Regulatory issues status The impending FCC TVWS rulings EN revision update; actions in TG11 and TG28 FCC 5 GHz rules changes update; full band for indoor use Wi-Fi (2.4GHz)/LTE interference issues 60 GHz rules, RF Health discussion Critical issues actions TBD Slide 21 Bruce Kraemer (Marvell)

22 IEEE 802.11 FIA SG – San Diego, July 2010
May 2008 doc.: IEEE /0692r0 doc.: IEEE /xxxxr0 July 2010 July 2010 IEEE FIA SG – San Diego, July 2010 Goals for the San Diego Meeting: Extend Study Group Edit and approve draft of PAR & 5C Plan for September Interim and Teleconference Slide 22 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 22 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

23 S1G Goals for July Respond to 802 Plenary Review comments
Note 1: Comments received by 5 pm Tuesday, July 13 Note 2: Response due by 5 pm Wednesday, July 14 Slide 23 David Halasz, Aclara Bruce Kraemer (Marvell)

24 Smart Grid – July 2010 Tuesday pm1
doc.: IEEE /0692r0 July 2010 Smart Grid – July 2010 Tuesday pm1 Open Forum for discussing in depth what WG11 should do to service requirements for NIST Smart Grid PAP#2 Thursday am1 Open Forum for discussing in depth what 802 should do to service requirements for NIST Smart Grid NIST PAP#2 Update of activities in P2030 Open SG Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

25 July 2010 Recent Ballots May - July Bruce Kraemer (Marvell)

26 P802.11u - 2nd Sponsor Recirculation
July 2010 P802.11u - 2nd Sponsor Recirculation The 15 day IEEE P802.11u (Interworking with External Networks) 2nd recirculation Sponsor Ballot asked the question “Should  P802.11u  Draft 10.0 be forwarded to RevCom?” Results for this Sponsor Ballot follow: Ballot Opening Date:   Wednesday  June 23 , 2010 - 23:59 ET Ballot Closing Date:     Thursday       July 08, 2010 - 23:59 ET  RESPONSES: This ballot has met the 75% returned ballot ratio requirement 154 eligible people are in this ballot group.   120 affirmative votes 7 negative votes with comments 1 negative vote without comments 14 abstention votes ======= 142  votes received  =  92.2 % returns                              =  9.9% valid abstentions   APPROVAL RATE: 120  affirmative votes       =      94.5 % affirmative    7  total negative votes  =       % negative Motion passes There were 13 comments received Bruce Kraemer (Marvell)

27 P802.11v - 3nd Sponsor Recirculation
July 2010 P802.11v - 3nd Sponsor Recirculation The 15 day, third recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management) asked the question “Should  P802.11v  Draft 11.0 be forwarded to RevCom?” Results for this Sponsor Ballot follow: Ballot Opening Date:   Wednesday  May 26, 2010 - 23:59 ET Ballot Closing Date:     Thursday       June 10, 2010 - 23:59 ET  RESPONSES: 161 eligible people are in this ballot group.     130 affirmative votes 11 negative votes with comments 0 negative votes without comments 6 abstention votes ======= 147  votes received  =  91.3% valid returns                            =  % valid abstentions   APPROVAL RATE: 130  affirmative votes       =     92.2 % affirmative 11  total negative votes  =      7.8  % negative The Motion passes. There were 1087 comments received Bruce Kraemer (Marvell)

28 P802.11v – 4th Sponsor Recirculation
July 2010 P802.11v – 4th Sponsor Recirculation The 15 day, fourth recirculation Sponsor Ballot for IEEE P802.11v (Wireless Network Management) asked the question “Should  P802.11v  Draft 12.0 be forwarded to RevCom?” Results for this Sponsor Ballot : Ballot Opening Date:   Tuesday  June 22, 2010 - 23:59 ET Ballot Closing Date:     Wednesday       July 07, 2010 - 23:59 ET  RESPONSES: 161 eligible people are in this ballot group.     133 affirmative votes 8 negative votes with comments 0 negative votes without comments 7 abstention votes ======= 148  votes received  =  91.9% valid returns                            =  % valid abstentions   APPROVAL RATE: 133  affirmative votes       =     94.3 % affirmative 8  total negative votes  =      5.7  % negative The Motion passes. There were 1074 comments received Bruce Kraemer (Marvell)

29 P802.11z - 3nd Sponsor Recirculation
July 2010 P802.11z - 3nd Sponsor Recirculation The third IEEE P802.11z (Extensions to Direct Link Setup) 15 day recirculation Sponsor Ballot asked the question “Should  P802.11z  Draft 9.0 be forwarded to RevCom?” Results for this Sponsor Ballot: Ballot Opening Date:   Wednesday  May 26, 2010 - 23:59 ET Ballot Closing Date:     Thursday      June 10, 2010 - 23:59 ET  RESPONSES: 144 eligible people are in this ballot group.     123 affirmative votes 6 negative votes with comments 0 negative votes without comments 7 abstention votes ======= 136  votes received  =  94.4 % valid returns                        =  % valid abstentions   APPROVAL RATE: 123  affirmative votes       =      95.3 % affirmative     total negative votes  =      % negative The motion passes. There were 12 comments received Bruce Kraemer (Marvell)

30 P802.11mb - WG Recirculation July 2010
Ballot #163 was a 15 day Working Group technical recirculation Ballot asking the question "Should P802.11mb D4.0 be forwarded to Sponsor Ballot?". The ballot results are: Ballot Opening Date:    Thursday Jun 10, 2010 - 23:59 ET Ballot Closing Date:   Friday Jun 25, 2010 - 23:59 ET  RESPONSES: 246 eligible people are in this ballot group.     164 affirmative votes    negative votes      28 abstention votes =======   212 votes received = 86.2% valid returns                                =  13.2% valid abstentions   APPROVAL RATE: 164  affirmative votes       =   % affirmative   20  total negative votes  =     % negative Motion passes. There were 98 comments received. Bruce Kraemer (Marvell)

31 P802.11s - WG Recirculation July 2010
IEEE WG Letter Ballot #165 was a 15 day Working Group technical recirculation Ballot asking the question "Should P802.11s D6.0 be forwarded to Sponsor Ballot?". The ballot results follow: Ballot Opening Date:    Sunday Jun 13, 2010 - 23:59 ET Ballot Closing Date:   Monday Jun 28, 2010 - 23:59 ET  RESPONSES: 248 eligible people are in this ballot group.     157 affirmative votes  20 negative votes     33 abstention votes =====  210 votes received = % valid returns                           =  15.71% valid abstentions   APPROVAL RATE: 157  affirmative votes       =   % affirmative   20  total negative votes  =     % negative Motion passes. There were 191 comments received. Bruce Kraemer (Marvell)

32 P802.11aa – Initial WG Ballot July 2010
IEEE WG Letter Ballot #164 was a 30 day Working Group technical Ballot asking the question "Should P802.11aa D1.0 be forwarded to Sponsor Ballot?". The ballot results follow: Ballot Opening Date:    Thursday June 10, 2010 - 23:59 ET Ballot Closing Date:   Saturday July 10, 2010 - 23:59 ET  RESPONSES: 257 eligible people are in this ballot group.     112 affirmative votes  31 negative votes     37 abstention votes =====  180 votes received = 70.0% valid returns                           =  20.6% valid abstentions   APPROVAL RATE: 112  affirmative votes       =   % affirmative   31  total negative votes  =     % negative Motion passes. There were 965 comments received. Bruce Kraemer (Marvell)


Download ppt "WG11 Snapshot July ‘10 Date: Authors: Name Company Address"

Similar presentations


Ads by Google