Presentation is loading. Please wait.

Presentation is loading. Please wait.

System Integration Plan

Similar presentations


Presentation on theme: "System Integration Plan"— Presentation transcript:

1 System Integration Plan
Route 58 Corridor Concept Need The Virginia General Assembly established the Route 58 Corridor Development Program in 1989 to enhance economic development potential across this largely rural portion of the state. Travel is being improved on the mostly two-lane, winding and hilly road, and most work is now completed through Henry County.  The I58 will be improved and widened along the whole southern boarder of Virginia. from the Atlanctic Ocean to Tennessee . System Integration Plan Alternatives Analysis In the mid 1990s the Governor appointed a special commission to identify exactly what the Rt 58 Corridor should encompass.  A team of transportation officials identified the Rt 58 corridor to include portions of Rt 58, Rt 16, I-81, Rt 58A, Rt 23 and a few other projects.  Additionally, in 1999 there was another Rt 58 Bond sale and the General Assembly specified the Rt 58 projects that would be funded with these proceeds. A general east-to-west construction strategy was adopted.  However, this was not strictly followed and thus over time a general priority for projects was a "first in first out" so that as the PE was completed on a project it would go to construction utilizing the available corridor funds. 


Download ppt "System Integration Plan"

Similar presentations


Ads by Google