THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT NUMBER: NRA N /1 CLIENT: SOUTH AFRICAN NATIONAL ROADS AGENCY SOC LIMITED CONSULTANT: UWP CONSULTING (PTY) LTD CONTRACTOR: CONCOR INFRASTRUCTURE PRESENTED BY: STEWART WILSON (RESIDENT ENGINEER)
2
OVERVIEW OF THE CONTRACT
Went to tender: Design (2010) Construction (September 2015) Tender Awarded: December 2015 Handover of project to contractor: February 2016 Project completion date: March 2019 Contract Duration: 37 months Total CPG Target: 18% Estimated Contract Value: R900 million
3
PAVEMENT DESIGN FOR THE NEW CARRIAGEWAY
Surfacing: 20mm UTFC 40mm Continuously graded asphalt wearing course Basecourse: 80mm Asphalt Basecourse (BC3) Upper Subbase: 150mm C3 Stabilised Crushed Gravel Lower Subbase: 150mm C3 Stabilised Crushed Gravel Upper Selected Layer: 150mm G7 Natural Gravel Lower Selected Layer: 150mm G9 Natural Gravel
4
CONTRACT PARTICIPATION GOALS
Targets Achieved Target Area Labour 6% 6,36% 352/494 SCD 12% 7,9% 19/29 Total 18% 14,26%
5
TRAINING Students: 4 interns with contractor 4 interns with engineer
1 OHS intern 12 ‘go for gold ‘ students Programme Generic (R25 000) NQF 3(R ) NQF 4 (R ) SMME (R ) Progress 6 of 8 Modules – R
6
RIVER BRIDGES Mlalazi River Bridge (B1085A)
Four span structure with 29.5m long spans Simply supported precast, prestressed concrete beam deck and 3 internal wall type piers Using a combination of pad type footings and 32 x 900mm diameter bored piles, ranging in depths from 16m to 23m
7
RIVER BRIDGES Umhlathuze River Bridge (B484A)
Eight span structure with 29m long spans Simply supported prestressed beam and slab deck construction with 7 internal wall type piers Piers founded on 70 x 900mm diameter bored piles to depths between 45m to 62m
8
OVERPASSES & UNDERPASSES
Ridge Bridge (B1416) Windy Ridge Bridge (1086) Port Durnford Bridge 1 (B1087) Mzingwenya Agricultural Overpass (B1090) Underpasses Port Durnford Bridge 2 (B1088A) Sugar Mill Bridge (B485) CFA Piling at Mzingwenya Overpass Mzingwenya Overpass Removing Jackspan
9
MAJOR BOX CULVERTS 16 Major box culverts with numerous smaller box culverts that require lengthening
10
FACTS AND QUANTITIES Mass of reinforced concrete
Major Structures: m3 ( tons) Minor Structures: m3 ( tons) Total mass of reinforced concrete: m3 Length of piles 600mm diameter CFA piles: 0.38 Km 900mm diameter bored piles: Km Total length of piles: 4.74 Km Mass earthworks: m3 Asphalt to be paved: tons