Download presentation
Presentation is loading. Please wait.
Published byΠοδαργη Αναγνώστου Modified over 6 years ago
1
Status of CO2 Cooling tests at CERN for Pixel phase 1
AO,HP / 28 January 2009
2
Main news Manpower: João Noite, started on a CERN technical studentship (Jan-Dec 2009). Equipment: All material available. Assembly work started. AO,HP / 28 January 2009
3
AO,HP / 28 January 2009
4
Pixel upgrade CO2 cooling R&D
Planning Year Pixel upgrade CO2 cooling R&D Pixel upgrade project 2008 Oct-Dec: Definition of the CO2 study project, write requirements, collect existing documentations into project database. TASK NOT FULLY COMPLETED! 2009 Jan: Project start Sep: Provisional results of the CO2 studies available Upgrade to long feed pipes, closed circuit, etc.? 2010 Jan: CO2 study results ready for deciding on the pipe dimensions and manifolding in the Pixel phase 1 Jan onwards: Detail design of Phase 1 pixel upgrade July: Start of component procurements 2011 Dec: All components ready 2012 Jan: Final integration work start Nov: Pixel detector ready for installation 2013 Jan: Pixel installation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.