Download presentation
Presentation is loading. Please wait.
Published byMallory Cordell Modified over 10 years ago
1
HOUSING STRATEGY AND ENERGY EFFICIENCY Kieran Gallagher Deputy City Architect February 2011
2
POLICY CONTEXT Climate change strategy For Dublin city 2008 - 2020 Dublin Sustainable Energy Action Plan Dublin City Council Draft Housing Energy Action Plan 2009 - 2020
4
HOUSING DUBLIN CITY 190,984 Housing units 27,760 (15%) are the property Of Dublin City Council. 12,368 - Houses 11,614 - Apartments 3,778 - Senior Citizens D.C.C Housing Stock
5
Proportion of unit types in DCC housing stock
6
Table 1: Sample data from DCC Housing Energy Use Action Plan
7
Age Profile of housing Stock
8
Drumcondra Memorial Court Wolfe Tone close courtyard Bishop Street
9
Patrick Heeney cresent10 – 10A Rafters road
10
C. 700 Units per year refurbished and relet. VOIDS
11
Dwelling suitable for cavity wall insulation
12
SEDBUK Ratings of D.C.C boilers
13
Table 3: Typical running costs and CO2 emissions in terms of BER rating
14
BER ratings of DCC houses (657 surveys)
15
Three opportunity scenarios have been identified in the plan New Build Demolitions Refurbishment of voids Leased units Buy Backs ( former D.C.C properties) Covers: Opportunity 1
16
New Build Demolitions Refurbishment of voids Leased units Buy Backs ( former D.C.C properties) Boiler and control upgrade Cavity wall insulation Demolition / Replacement of senior citizens bedsit accommodation Covers: Opportunity 2
17
New Build Demolitions Refurbishment of voids Leased units Buy Backs ( former D.C.C properties) Boiler and control upgrade Cavity wall insulation Demolition / Replacement of senior citizens bedsit Accommodation Refurbishment of all houses to B3. Refurbishment of all apartments to C1 standard Covers: Opportunity 3
18
EXISTING GLOVER COURT VIEW FROM YORK STREET
19
GROUND FLOOR PLAN
20
EXISTING SECTION PROPOSED SECTION
21
Average BER
22
EXISTING GLOVER COURT VIEW FROM YORK STREET
23
PROPOSED GLOVER COURT VIEW FROM YORK STREET
24
Private/ Social Dwellings Glasgow
25
YORK STREET
27
New Buildings Refurbished Heating system Solar panels New Build / Refurbishment Bunnratty Road
28
Behavior/ Education/ Training/ Tenant Briefing
29
District Heating Feasibility Study: Poolbeg to Heuston
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.