EHV Transmission Equipments
C. K. Thakur Chief Design Engineer (Project Engineering Electrical) NTPC
2
Over view Switching Schemes. Type of Towers. Type of conductors.
Switchyard types. Switchyard equipments. Switchyard Layouts. 1 December 2018
3
Switching schemes Single bus. Main and Transfer (sectionalised).
Double bus. One and half breaker scheme. Double main and Transfer (Sectionalised). Double Breaker 1 December 2018
4
Factors Affecting Switching Scheme
System Security/Reliability. - Feeder Fault. - Bus Fault. - Equipment Failure. - Redundancy. 1 December 2018
5
Factors Affecting Switching Scheme (Contd.)
Operational Flexibility. Ease of Maintenance. Simplicity of Protection Arrangements. Ease of Extension. Area available. Cost. 1 December 2018
6
Line Towers Single Circuit. Double Circuit. Dead end type.
Tension Towers. Suspension Towers. 1 December 2018
7
Tower Design Wind Force. Conductor Tension. Span. Type of conductor.
1 December 2018
8
Tower Hardwares Insulator Strings. Vibration Dampers. Spacers.
Earthwire & OPGW. 1 December 2018
9
Type of Conductor ACSR Moose (800A). Zebra (700A). Rabbit (190A).
Dog (290A). 1 December 2018
10
Switchyard Type Conventional Air Insulated Type. Gas Insulated type.
Air Insulated (Enclosed type). 1 December 2018
11
Switchyard Equipments.
Circuit Breaker. Disconnectors. Current Transformers. Capacitor Voltage Transformers. Lightning Arrestors. Post Insulators. Wave Traps 1 December 2018
12
General Parameters Dielectric Parameters .(IEC 694)
- Power Frequency Voltage. - Lightning Impulse Voltage. - Switching Impulse Voltage. - Corona Extinction Voltage. - RIV Level. 1 December 2018
13
400kV Equipments 1 December 2018
14
220kV Equipments 1 December 2018
15
132kV Equipments 1 December 2018
16
General Parameters (Contd.)
Rated Current. Short Time Current. Creepage Distance. 1 December 2018
17
Circuit Breakers Type MOCB. ABCB. SF6 1 December 2018
18
Circuit Breaker Fault clearing. Load Make Break. Break Time.
Single/Multi Break. Voltage Distribution across breaks. Closing resistors. Operating mechanism (Spring/Pneumatic/Hydraulic) 1 December 2018
19
Disconnectors HCB Type. Double Break Type. Pantograph type.
Vertical Break type. Provision of Earth Switches. Motor / Pneumatic operated. Gang operated/Single pole type. 1 December 2018
20
Current Transformer Bar Primary type. Dead tank/Live tank type.
Ring Type. No. of Cores. Ratio. Accuracy. 1 December 2018
21
Capacitor Voltage Transformer
Capacitance. Voltage Ratio. No. Of Cores. Accuracy. 1 December 2018
22
Lightning Arrestor Gap Type / Gapless Type. Voltage Rating.
Energy Capability. Monitoring. Location. 1 December 2018
23
Post Insulators Voltage Rating. Cantilever Strength. Fixing Details.
1 December 2018
24
Wave Trap Rated Inductance(0.5/1.0 mH). Rated current. Band Width.
* 07/16/96 Wave Trap Rated Inductance(0.5/1.0 mH). Rated current. Band Width. Coupling (Phase to Phase). 1 December 2018 *
25
Switchyard Layout Guidelines
Place All Equpt. At ground level for ease of maintenance. Busbars placed at right angles to feeders. Accessibility of feeders from either side of switchyard. Conductor crossings at right angles be separated to achieve adequate clearances. 1 December 2018
26
Switchyard Layout Guidelines(Contd.)
For 400kV - Phase to Phase 4000 mm - Phase to earth 3500mm For 220kV - Phase to Phase 2100 mm - Phase to earth mm 1 December 2018
27
Switchyard Layout Guidelines(Contd.)
Lower level connections can be of Rigid pipe or flexible conductor. Upper level connections can be of strung type only. For aesthetic looks and similarity all same equipments be in one line as far as possible. Road near circuit breaker be kept for maintenance purpose. 1 December 2018
28
Switchyard Layout Guidelines(Contd.)
Provide Double insulator strings for upper level for safety reasons and to avoid busfaults due to conductor snapping. Cable trenches to be routed for ease in maintenance and movement. Lightning protection to be provided using Lightning masts and/or shield wires. Lighting to be provided by fixtures on LM platform. 1 December 2018