Presentation is loading. Please wait.

Presentation is loading. Please wait.

Texas NAHRO 31st Annual Conference and Tradeshow

Similar presentations


Presentation on theme: "Texas NAHRO 31st Annual Conference and Tradeshow"— Presentation transcript:

1 Texas NAHRO 31st Annual Conference and Tradeshow
(REAC: UPCS Inspection Protocol) April , 2007

2 Training Agenda TUESDAY, APRIL 24TH:
8:30 am – Welcome / Go over this thing 8:45 am – Protocol 10:00 am – BREAK (30 Minutes) 10:30 am – Protocol (Oh no, not more of it!) 12:00 pm – LUNCH 1:30 pm – “Inspection Day” Video 2:00 pm – Deficiencies, Definitions and the Software, oh my!

3 Training Agenda (Continued)
TUESDAY, APRIL 24TH: 3:00 pm – BREAK (30 Minutes) 3:30 pm – Deficiencies, Definitions … 5:00 pm – End for the Day

4 Training Agenda (Continued)
WEDNESDAY, APRIL 25TH: 8:30 am – Deficiencies, Definitions … 9:30 am – HQS vs. UPCS, Scoring, Appeals, etc. 10:00 am – BREAK (30 Minutes) 10:30 am – HQS vs. UPCS, Scoring, Appeals, etc. (Continued) 12:00 pm – End of Session

5 “Don’t shoot the messenger!” (Me.)
Ground Rules RULE NUMBER 1: “Don’t shoot the messenger!” (Me.) RULE NUMBER 2: Ask questions! Remember, there are no dumb questions, just dumb answers. (Which I’ll try my best not to give.) RULE NUMBER 3: When in doubt, refer to RULE NUMBER 1 above.

6 Reminder! =

7 Questions to be Answered
- How do I properly prepare for a REAC inspection? - Where should I focus my resources? - What is my role during the inspection?

8 Questions to be Answered (Continued)
- How will certain things, like smoke detectors, be checked? (Will the inspector use canned smoke or just push the button?) - What kind of questions should I ask the inspector before he leaves my site so that I can better understand what went wrong?

9 Questions to be Answered (Continued)
- How do I appeal a finding, and what kinds of documentation do I need to back up my appeal? - How do I educate my residents during their annual inspections in order to prevent findings during the REAC inspection? - Is there a checklist of standards I can use before the inspection to help me make sure everything is up to par?

10 PROTOCOL

11 PIH/REAC’s Mission The Real Estate Assessment Center's (REAC) mission is to … … provide and promote the effective use of accurate, timely and reliable information assessing the condition of HUD's portfolio; … to provide information to help ensure that HUD subsidized housing remains decent, safe and sanitary; … and to restore the public trust by identifying fraud, abuse and the wasting of HUD resources. Our Mission

12 UPCS The Uniform Physical Condition Standards (UPCS) are the foundation of HUD/PIH-REAC’s Physical Inspection Program. Creates the structure of the physical inspection. (Identifies five inspectable areas and health and safety hazards.) Establishes standardized definitions for inspectable items, the basis for electronic inspections via UPCS software. (Inspection data is validated, producing a score which indicates the physical condition of a property.) Provides a uniform, objective protocol for training inspectors performing inspections of all property types.

13 PHYSICAL INSPECTION STRUCTURE
PROPERTY Site Building Inspectable Areas Area Building Exterior Systems Units Common Areas

14 PHYSICAL INSPECTION STRUCTURE
INSPECTABLE ITEMS SITE Fencing and Gates Grounds Mailboxes/Project Signs Market Appeal Parking Lots/ Driveways/Roads Etc. BUILDING SYSTEMS Domestic Water Electrical System Elevators Emergency Power Fire Protection HVAC Etc. UNIT Bathroom Call-for-Aid Ceiling Doors Electrical System Floors Hot Water Heater Kitchen Etc. BUILDING EXTERIOR Doors Fire Escapes Foundations Lighting Roofs Walls Etc. COMMON AREAS Basement/ Garage/Carport Community Room Day Care Halls/Corridors/ Stairs Etc. HEALTH & SAFETY Air Quality Elevator Emergency/Fire Exits Flammable Materials Electrical Hazards Etc.

15 UPCS SOFTWARE CONFIGURATION
Deficiency Definitions No Observed Deficiency (NOD) Level 1 Level 2 Level 3 - or - Inspectable Area Inspectable Item Observed Deficiency (OD) - or - Not Applicable (NA)

16 PASS SUBSYSTEM COMPONENTS
Inspector gathers data using UPCS Software on a DCD PASS Physical Assessment Subsystem - Scoring - Checklist - Inspection Review - Time Stamp Analysis - Reporting The INTERNET Data Collection Device Added Time Stamp Analysis to PASS box.

17 SCORING Physical Assessment Score
Predetermined weights and factors Building Profile Information Observed Deficiencies Physical Assessment Score

18 PHYSICAL INSPECTION PROTOCOL
Standard set of rules and procedures followed on all inspections as established in the UPCS. Includes three phases: Pre-Inspection Inspection Post Inspection Each phase is completed in the above order

19 INSPECTOR’S ROLE Perform objective, factual physical assessments.
Conduct inspections according to the HUD/PIH-REAC Physical Inspection Protocol. Ensure success by complying with the UPCS.

20 CODE OF CONDUCT Maintain professional conduct and demeanor at all times during the inspection and interaction with the inspection participants. Display the HUD-issued photo id during the inspection. Dress appropriately. Be courteous and professional. Be aware of cultural differences. Defer resident questions concerning maintenance to the property representative. Do not make promises about inspection results.

21 CODE OF CONDUCT (Continued)
Conflicts of interest – be aware! Do not offer an opinion as to the quality of the site, building or unit. Do not bring a firearm or other weapons onto a property. Do not invade a resident’s privacy by attempting to open a closed door within a unit (bedroom, bathroom, etc.) without the permission of the resident or the property representative.

22 CODE OF CONDUCT (Continued)
Do not disclose any information to a third party about the inspection results. Defer to the property owner/representative. Do not utilize local HUD offices, MF or PHA offices to conduct personal business (phone calls, inspection uploads, etc.)

23 SUMMARY HUD Physical Inspections are: Objective Consistent
Comprehensive Evaluations of HUD-supported properties A step to help HUD prioritize and direct its resources A method to ensure that we all work together to provide housing that is decent, safe, sanitary and in good repair

24 PHYSICAL INSPECTION PROTOCOL
Day Inspection Day Receive inspection assignment 1 Download property profile 2 Confirm 3 Update schedule 4 Travel to 5 Meet with property representative 6 7 Verify/update property profile info. a. property, b. participant, c. certificate, d. area measures 8 Visually verify/update building information Generate sample 9 a. Identify sample buildings b. Enter generated sample units 10 Inspect a. site, b.-d. building(s), and e. units 11 Confirm/verify data 12 Complete Notification of Exigent and Fire Safety Hazards Observed form (if needed) and provide a copy to property 13 Upload completed 14 Step 14 revise by deleting one of the two boxes and change to circle or oval.

25 PHYSICAL INSPECTION PROTOCOL
PRE-INSPECTION Receive inspection assignment 1 Download property profile 2 Confirm inspection 3 Update inspection schedule 4 No change

26 STEP 1: Receive Inspection Assignment
HUD awards RAP inspections to winning bidder. Contractor/servicing mortgagee assigns inspection and notifies an inspector. Property profile information is available for downloading from the REAC Web site. PRE-INSPECTION PHASE

27 STEP 2: Download Property Profile
Inspector downloads Property Profile from the REAC Web site directly to the UPCS software on their DCD. Downloaded information automatically populates appropriate fields in the UPCS software. Property Profile contains the following information, and MUST BE VERIFIED while on site! Inspection number. Property information: name, street address (no P.O. Box), and telephone number of the property, and number of buildings and units. Participant information: participant’s name, role, and organization name, address, telephone number. Building information: building name, street address (no P.O. Box), type, construction year, number of units. PRE-INSPECTION PHASE No change

28 STEP 3: Confirm Inspection [Arrange Date and Time]
Inspector contacts the authorized property representative (owner, management company or PHA) to: Explain the purpose of the inspection To objectively assess the physical condition of the property, not to create a laundry list of maintenance items Negotiate mutually agreeable time for physical assessment PRE-INSPECTION PHASE Switched help desk with TAC Inspector should notify the TAC if the property owner refuses to permit an inspection. All inspections must occur in presence of the property representative.

29 STEP 3: Confirm Inspection [Arrange Date and Time] (Continued)
Inspector sends an Inspection Notification Letter Informs property representative to: Notify all residents of upcoming inspection Have available for the inspector on day of inspection ... Copy of document notifying residents Total number of buildings and units Address or unique building identifier for each building Applicable certificates (e.g., elevators, boilers, etc.) Occupancy rate Rent roll Site map or plot of property (if available) Area measures for parking lots/driveways/roads and walkways/steps PRE-INSPECTION PHASE No change in content

30 STEP 4: Update Inspection Schedule
Inspections are to be performed during normal business hours, which vary from agency to agency. The inspector is responsible for updating the REAC Inspection Schedule for any and all changes and also for notifying any affected parties. PIH-REAC Quality Assurance (QA) inspections are based on the REAC Inspection Schedule Servicing mortgagee provides REAC with individual inspector schedules PIH-REAC must be aware of all schedule changes PRE-INSPECTION PHASE

31 PHYSICAL INSPECTION PROTOCOL
Travel to property 5 Meet with property representative 6 Verify/update property profile info. a. property, b. participant, c. certificate, d. area measures 7 a. Identify sample buildings b. Enter generated sample units 10 Visually verify/update building information 8 Generate sample 9 Inspect a. site, b.-d. building(s), and e. units 11 No change Confirm/verify inspection data 12 Complete Notification of Exigent and Fire Safety Hazards Observed form (if needed) and provide a copy to property representative 13

32 STEP 5: Travel to Property
Inspector must follow REAC rules for travel: Inspector must be physically present and on time to conduct the inspection. If the inspection cannot be performed or completed on the scheduled day, the inspector must call the TAC immediately. If the weather prevents the inspector from arriving at the property, they must request approval from the TAC to declare the inspection “unsuccessful”. INSPECTION PHASE No change

33 INCLEMENT WEATHER POLICY
Property representative may postpone an inspection due to inclement weather. Inspector must report immediately to REAC’s Physical Inspections Technical Assistance Center (TAC). Inspector receives log number from the TAC to upload with the inspection confirming cancellation. Inspectors should not inspect a property if a “Severe Weather Advisory” in in effect. Includes, but is not limited to, hurricanes, tornadoes, thunderstorms, hail or any other adverse weather condition that would likely endanger the safety of the participants (includes any snowstorm for which such an advisory has been issued). Check validity of 2nd bullet

34 SNOW POLICY In the absence of a severe weather advisory, inspectors should attempt to inspect all properties regardless of snow. Any inspectable item not visible due to snow is recorded as NOD (No Observed Deficiency). Provide comment indicating items were hidden by snow. No change

35 STEP 6: Meet with Property Representative
Inspector identifies himself as an inspector of HUD properties, not an employee of HUD. Inspector verifies that residents were given written notification of inspection. Inspector must notify the TAC, if residents were NOT notified and TAC will advise if inspector is to continue. Inspector discusses inspection purpose with property representative. To objectively record the physical condition of the property, NOT to instruct property representative on maintenance and repair. Inspector explains sampling process Generates random sample of units to inspect. Reduces length of inspection. INSPECTION PHASE Added: if TAC advises (1st bullet)

36 STEP 6: Meet with Property Representative (Continued)
Inspector explains how Life-Threatening Health and Safety Hazards will be handled. Inspector ... Displays the HUD-issued photo id at all times. Verifies rent roll (or other all-inclusive documents) to confirm proper building/unit count. Verifies, if applicable, list of units relative to 504/FHA/ADA. Verifies occupancy rate and records as percentage in DCD (for MF properties only). Obtains area measures. Inspector is always accompanied by the property representative while on the property. INSPECTION PHASE No change

37 STEP 7: Verify/Update Property Profile Information
The Property Profile … Includes information on the property, participant, certificates and area measures. Must be updated before the inspection begins. Is used to generate statistically accurate building and unit inspection samples. Incorrect sampling will invalidate the inspection which may require a re-inspection (at no additional cost to the Government) INSPECTION PHASE No change

38 STEP 7a: Verify/Update Property Information
Inspector verifies/updates property information prior to conducting the inspection, including: Property name, address and telephone number. Scattered site information. Total number of buildings and units. A building is defined as any structure that has a contiguous roofline, a permanent foundation, is enclosed on all sides, and at least one utility servicing it, such as electric, gas, water or sewer. INSPECTION PHASE No change

39 STEP 7b: Verify/Update Participant Information
Inspector verifies/updates participant information. Participant name. Participant role (e.g., site manager, owner, etc.) Participant organization name. Participant address and telephone number. Participant address. Participants may be individuals or organizations. There should be at least 3 participants listed. For PHA: must include Executive Director. For MF: must include Owner and the Management Agent. INSPECTION PHASE No change

40 STEP 7c: Verify Certificates
Inspectors should verify the existence of applicable certificates. Check expiration date to ensure it is current. Record results in UPCS software. Inspectors should verify the existence of a Lead-Based Paint Disclosure Form and a Lead-Based Paint Inspection Report for buildings constructed built prior to 1978. INSPECTION PHASE No change

41 STEP 7d: Obtain Area Measures
Inspectors should try to obtain Area Measures. Refers to proportionality. Proportionality is used to determine the percentage (square footage) of the defective area. Proportionality only applies to: Parking lots, driveways and roads. Walkways and steps. The rating level of the defect is based on the percentage of the defect. INSPECTION PHASE No change

42 STEP 8: Visually Verify/Update Building Information
Inspectors must validate building information Building name and address Building type Building construction year (original year built – not rehabilitation date) Total number of units Failure to validate building information may result in an inaccurate count of buildings and units Building and unit counts are used to generate the inspection sample Inspectors must also determine if a building is uninspectable Important to record uninspectable buildings before generating the sample INSPECTION PHASE No change

43 BUILDING TYPE DEFINITIONS
Common Building – A detached non-residential structure. Duplex – A detached residential structure consisting of two units. Low-Rise/Garden Apartments – A multi-unit residential structure consisting of two and one-half or less floors with a common hall entrance. Mid/High-Rise Apartments – A multi-unit residential structure consisting of three or more floors with or without elevators. Row/Town House – A single unit residential structure that is connected to a similar structure by a common sidewall with individual exterior unit entrance. Single Family House – A detached residential structure consisting of one unit. No change

44 CLIENT ROOM POLICY For nursing homes, group homes, and assisted living facilities, any room with a bed, or beds, is considered a “client room”. Client rooms are to be inspected and listed as dwelling units. Inspectors should change the number of units in the DCD to reflect client rooms. All other areas of the facilities, including kitchens, dining areas, community areas, etc., are to be inspected as common areas. No change

45 STEP 9: Generate Sample Inspector generates sample using the sampling function of UPCS software Mathematical and statistical equations Statistically valid random sample Displayed as sequence of unit numbers Designed to produce a sample that accurately reflects what would have been recorded if all buildings/units were inspected INSPECTION PHASE No change

46 STEP 9: Generate Sample (Continued)
Variations to protocol produce inaccurate samples and may invalidate inspections Inspector must follow protocol steps Verify/update all property information before generating sample Generate only one sample for each inspection in UPCS software INSPECTION PHASE No change

47 SAMPLING “DO’s” AND “DON’Ts”
Verify all property and building information prior to generating the sample. Use the all-inclusive list of units to determine sample units. Select units in the order they are displayed. Select alternate units in the order they are displayed. Do No change Allow property owners to alter sample units. Provide property owners with a list of samples prior to inspection. Deviate from inspection protocol. Don’t

48 STEP 10a-b: Identify Sample Buildings and Enter Generated Sample Units
UPCS software displays “Yes” in the “In Sample” field for each building included in the sample. UPCS software displays sequence of unit numbers in the “Sample Units” text field. Each number represents a unit in the selected building. The order of the numbers represents the relative position of each unit on a complete list of units. For example: The number 4 represents the fourth unit on the list. Inspector adds sample units by using an ALL-INCLUSIVE list of units. The list may be the rent roll if it includes vacant as well as occupied units. INSPECTION PHASE No change

49 INSPECTION GUIDELINES
Direct specific resident complaints to the property representative. Remind residents of the purpose of the inspection. To record the physical condition of the unit, not evaluate housekeeping Observe and inspect all five inspectable areas: Site Building Exterior Building Systems Common Areas Units No change

50 INSPECTION GUIDELINES (Continued)
Call out all observed deficiencies and the severity level to the property representative as you perform the inspection. Be alert to any Health & Safety hazards that may exist in an inspectable item. Record items inside the development/property. Any physical structures under the control of the housing provider (e.g., city streets and sidewalks) must be inspected. No change

51 HEALTH AND SAFETY HAZARDS
Inspectors must rate and record observed Health and Safety deficiencies Health and Safety items include: Air Quality Electrical Hazards Elevator Emergency/Fire Exits Certain Level 3 deficiencies automatically generate Health and Safety hazards Flammable Materials Garbage and Debris Hazards Infestation No change

52 LIFE-THREATENING HEALTH
AND SAFETY HAZARDS Be observant of the life-threatening health and safety hazards listed on the Notification of Exigent and Fire Safety Hazards Observed form: A. Propane, natural, or methane gas B. Exposed wires or open electrical panels C. Water leaks on or near electrical equipment D. Blocked or unusable emergency or fire exits E. Blocked fire escapes or ladders F. Missing or misaligned chimney for gas-fired water heater/HVAC G. Window security bars preventing exit H. Expired fire extinguishers I. Inoperative/missing smoke detectors No change

53 LIFE-THREATENING HEALTH AND SAFETY HAZARDS (Continued)
All observed life-threatening health and safety hazards ... MUST be recorded in the DCD. MUST be recorded on the Notification of Exigent and Fire Safety Hazards Observed form. Include hazards found in buildings not in the sample. Inspector notifies property representative of all hazards immediately. No change

54 STEP 11a: Inspect Site Site is defined as the area surrounding the building(s) of a property Example: Fencing and Gates, Grounds, Mailboxes/Project Signs. Only one site per property. Site may be inspected at any time during the inspection. INSPECTION PHASE No change

55 STEP 11b-d: Inspect Building: Exterior, Systems and Common Areas
It is encouraged to complete all inspectable areas of a building, before inspecting another building. The inspector must record the physical condition of three areas for each sample building: Building Exteriors - outside building surfaces (e.g., fire escapes, lighting) Building Systems - civil systems that support the building (e.g., domestic water, HVAC) Common Areas - areas within each building that are usable by more than one resident or by the property administration. INSPECTION PHASE No change

56 STEP 11b-d: Inspect Building: Exterior, Systems and Common Areas (Continued)
Inspector physically verifies that all buildings declared uninspectable meet REAC standards for that classification. If a sample building is discovered to be uninspectable during the inspection: Inspector indicates uninspectable reason in the UPCS software. Inspector selects the next available alternate building. Alternate building may be inspected at any time during the inspection. Alternate buildings must be selected in the order they are displayed in the UPCS software. INSPECTION PHASE No change

57 STEP 11e: Inspect Units Per Code of Conduct, with respect to resident privacy, an inspector should not open closed doors within a unit. After property personnel provides access, inspector may open/close to test functionality of the door(s). If a sample unit is declared uninspectable during the inspection: Inspector indicates uninspectable reason using the UPCS software. Inspector selects the next available alternate unit Alternate units must be selected in the order they are displayed in the UPCS software. Alternate unit may be inspected at any time during the inspection. INSPECTION PHASE No change

58 STEP 11e: Inspect Units (Continued)
Alternate units are inspected when a sample unit is considered uninspectable. UPCS software automatically generates alternate units. Selection Guidelines for Alternate Units: Alternate units must be selected in the order they are displayed. Example: If the alternates for a sample are 5 and 3, 5 must be used as an alternate before 3. If no alternate units exist in the sample building then select an alternate unit of the same building type. If no alternate units exist for same building type then select an alternate unit in the next building type group. If no other alternate units remain then call TAC for assistance. INSPECTION PHASE Deleted help desk

59 VACANT UNITS POLICY Multifamily housing properties:
Vacant units are included in the random sample. Only inspect vacant units at properties with 15% or more total vacant units (85% or less occupancy rate). At properties with less than a 15% vacancy rate, inspectors should not inspect vacant units, but replace them with alternates from the sample. Public housing properties: Vacant units are included in the random sample. Vacant units should not be inspected. No change

60 INSPECTING CLIENT ROOMS
Client rooms in nursing homes, group homes and assisted living facilities are inspected as dwelling units but do not always have assigned numbers. To inspect these rooms, start room count at the lowest level, move to the right, and then up through the building to select rooms as they are listed in the sample. Mixed-use facilities contain both client rooms and residential (apartment-style) dwelling units - the total number of units used to generate the sample will include both. No change

61 STEP 12: Confirm/Verify Inspection Data
Inspector uses “Check/Prepare/Import” function of UPCS software to automatically review inspection completion. UPCS software verifies thoroughness and identifies any missing items. Use function before leaving site. Only completed inspections are accepted by the DCD for uploading to REAC. INSPECTION PHASE No change

62 STEP 13: Complete Notification of Exigent
and Fire Safety Hazards Observed Form Life-threatening hazards are documented on the Notification of Exigent and Fire Safety Hazards Observed form. Property representative signs the form. If representative refuses to sign, note the refusal on the form. A copy of the form, signed by the inspector, must be left with property representative. INSPECTION PHASE No change

63 CORRECTING LIFE-THREATENING
DEFICIENCIES For Public Housing properties, life-threatening deficiencies must be corrected and/or abated within 24 hours and reported to the HUD field office within 3 business days. For Multifamily Housing properties, life-threatening deficiencies must be mitigated immediately and reported to the HUD field office within 3 business days. Check validity of both statements

64 PHYSICAL INSPECTION PROTOCOL
POST INSPECTION Upload Completed Inspection Data 14 Removed obsolete step

65 STEP 14: Upload Completed Inspection Data
Receipt # received by inspector when upload is complete. Completed inspections must be uploaded to the REAC Web site within 24 hours. Technical problems with uploading should be referred to the TAC immediately. Inspections should be deleted from the DCD only after the inspections are accepted by REAC. POST INSPECTION PHASE Deleted help desk and changed step #

66 VARIANCES Subjectivity Negligence Gaming
Occur when inspectors do not follow the standard inspection procedures as defined by the Physical Inspection Protocol. Negatively affect the accuracy and validity of physical assessments. Types of variances: Subjectivity Negligence Gaming No change

67 TYPES OF VARIANCES SUBJECTIVITY
When inspectors make personal judgments about the condition of a property or allow their personal biases to affect how they inspect NEGLIGENCE When inspectors purposely try to avoid following the Physical Inspection Protocol in order to reduce the time or effort required to inspect a property GAMING When inspectors perform illicit activities in an attempt to cheat the system NO CHANGE

68 SUMMARY Inspection protocol is designed to:
Standardize the inspection process Provide HUD with consistent, objective and factual inspection data Inspection protocol is divided into three main phases: Pre-Inspection Inspection Post Inspection Adherence to the protocol is critical for: Accurate physical assessments Maintenance of decent, safe, and sanitary housing in good repair No change

69 DEFICIENCIES, DEFINITIONS AND
THE SOFTWARE, OH MY!

70 DCD 2.3 INSPECTABLE DEFECTS
* Time to check out some pictures! *

71 HQS VS. UPCS, SCORING, APPEALS, ETC.

72 The Process Regulatory requirement that housing providers must
inspect their units/properties to a HUD defined standard. OLD: (HQS) Housing Agency Inspects to Standard Field Office Quality Assurance Paper based Pass/Fail Subjective Inconsistent NEW: (UPCS) HUD Headquarters Housing Agency Inspects to Standard PIH-REAC Quality Assurance Electronic Point Deductions Objective More Consistent Field Office

73 “Decent, safe, sanitary and in good repair.”
The Standard “Decent, safe, sanitary and in good repair.” MEASUREMENT 44 Elements Housing Quality Standards (HQS) 41 Elements Future Uniform Physical Condition Standards (UPCS)

74 HQS vs. UPCS Insulation Curtains and Shades Water Saver Devices

75 Holes/Missing Tiles/Panels
Dwelling Units Building LEVEL 3 Dwelling Units Living Room Ceiling Holes/Missing Tiles/Panels

76

77

78

79 Item: Ceiling Condition
HQS: Uses “subjective” measurements such as “serious”, “large”, “significant” and “severe” without specifying a quantifiable amount. (Makes consistent ratings more difficult to obtain amongst different inspectors.) If just one item is marked “Fail”, then the entire unit fails the inspection. UPCS: Uses “objective” measurements such as “larger than 8-1/2 x 11” or “more than 3 tiles”. (Makes consistent ratings more obtainable amongst different inspectors.) If an item receives a “Level 3” rating, then the score for that unit will be reduced from its potential maximum points.

80 Item: Ceiling Condition UPCS Guidance (electronic)
HQS Guidance (paper) UPCS Guidance (electronic) *Covered under either: “Bulging/Buckling”, “Peeling/Needs Paint” or “Water Stains/Water Damage/Mold/Mildew”.

81 Misaligned Chimney/Ventilation System
Building Systems Building LEVEL 3 Building Systems Domestic Water Misaligned Chimney/Ventilation System

82 Item: Hot Water Heater HQS:
If just one item is marked “Fail”, then the entire unit fails the inspection. UPCS: If an item receives a “Level 3” rating, then the score for that building will be reduced from its potential maximum points.

83 UPCS Guidance (electronic)
Item: Hot Water Heater HQS Guidance (paper) UPCS Guidance (electronic) *Covered under: “Missing Pressure Relief Valve”.

84 LEVEL 3 Dwelling Units Missing/Inoperable Building Dwelling Units
Smoke Detector Missing/Inoperable

85 Item: Smoke Detectors HQS:
If this item is marked “Fail”, then the entire unit fails the inspection. UPCS: If this item receives a “Level 3” rating, an “Exigent Health & Safety” notation is made but no points are deducted from the overall score.

86 UPCS Guidance (electronic)
Item: Smoke Detectors HQS Guidance (paper) UPCS Guidance (electronic)

87 Top 20 Deficiencies 1. HVAC – the water heater Pressure Relief Valve discharge tube extends to within 18 inches of the floor; 2. Misaligned Chimney – the vent stack on gas operated water heaters or furnaces are properly aligned; 3. Missing HVAC Covers – there are covers on all baseboard heaters; 4. Access to the Electrical Panel – access to electrical panels is not blocked by furniture or other items; 5. Missing Covers – electrical panels have interior covers (aside from the panel lid box itself) to prevent exposure from the wire connections; 6. Open Breaker Ports – Open breaker ports are covered; 7. Doors Damaged Seals – the factory-installed seals on Exterior Doors, such as building or unit doors, are in place and undamaged; 8. Doors Damaged Hardware – Exterior door hardware locks or latches properly and Fire Doors function as designed; 9. Security Doors – security doors do not have dual-side key locks; 10. Kitchen – Damaged Stoves/Ovens – stove burners are working;

88 Top 20 Deficiencies (Continued)
11. Plumbing – pipes and faucets are not leaking, and areas around any leaks are cleaned up and repaired; 12. Damaged Sinks/Showers – any hardware problems are repaired, diverters are working, drains have stoppers, Hot or Cold water handles are in place and working; 13. Clothes Dryers - are properly vented to the outside from units or laundry rooms; 14. Storm Water Sewers - are not clogged with trash or leaves; 15. Sanitary Sewer Damaged Covers –caps located in the grass on the exterior of the building that have been damaged by a lawn mower are cleaned out. Replace and mark the areas to prevent further damage; 16. Trash Chutes – hardware is in place and the chute door closes properly; 17. Trash Receptacles - are not overflowing and are adequate in size for the property; 18. Auxiliary Lighting – the back up lighting works even when the test light does not work; 19. Leaking Domestic Water – there are no leaks in the domestic water supply, including the hose bibs located on the exterior of the building; 20. Switchplate Covers – are not cracked or broken.

89 Questions to be Answered
- How do I properly prepare for a REAC inspection? A: Pray. - Where should I focus my resources? A: You have resources?!? - What is my role during the inspection? A: Refer to the first question above.

90 Assign a score to the overall property
The Goal Assign a score to the overall property condition based on the data collected by the inspector Measure physical condition Objective & consistent Accommodates all property types & configurations Numerical Score: 100 point scale Property types: High-rise to single-family homes Property Condition Criteria: Decent, Safe, Sanitary Good Repair Data Collected: 5 Property Areas with 50 Unique Items 3 Severity Types + Health & Safety Objective, consistent

91 Scoring is Based on Objective Data
The inspector records the existence and the severity of deficiencies according to preset criteria

92 The Scoring Approach Relative importance (“weights”) were assigned to each physical area, item, and deficiency in the inspection protocol HUD applies the weights to the inspection data to compute the score The score is based on a 100 point scale

93 The weights were assigned as part of a consensus process:
Scoring Protocol The weights were assigned as part of a consensus process: - Industry stakeholder input Public Housing Authorities Multifamily Housing (Owners / Agents) Trade groups PHA industry groups - HUD information - Trade professionals’ experience

94 Areas & Items 15% 20% 15% 35% 15% Building Systems Site
Building Exterior Fencing and Retaining Walls Grounds Lighting Mailboxes/Project Signs Market Appeal Parking Lots/Driveways/Roads Play Areas and Equipment Refuse Disposal Storm Drainage Walkways/Steps Doors Fire Escapes Foundations Lighting Roofs Walls Windows Domestic Water Electrical System Elevators Emergency Power Exhaust System Fire Protection HVAC Sanitary System 15% 20% 15% Dwelling Units Common Areas Bathroom Call-for-Aid Ceiling Doors Electrical System Floors Hot Water Heater HVAC System Kitchen Lighting Outlets/Switches Patio/Porch/Balcony Smoke Detector Stairs Walls Windows Areas & Items Basement/Garage/Carport Office Closet/Utility/Mechanical Other Community Spaces Community Room Patio/Porch/Balcony Day Care Pools and Related Structures Halls/Corridors/Stairs Restrooms/Pool Structures Kitchen Storage Laundry Room Trash Collection Areas Lobby 35% 15%

95 Scoring Dynamics Wgt 15% 15% 20% 35% 15% 100% Inspection Areas
Property Physical Condition Inspection Areas Site Health & Safety Deductions Whole Point Deductions From Final Score Building Exterior Building Systems Dwelling Units Common Areas Building Wgt 15% 15% 20% 35% 15% 100%

96 No Two Properties Are Alike
(For example, if there are no Common Areas on a property, the other inspection areas become more important) Property Physical Condition Inspection Areas Site Health & Safety Deductions Whole Point Deductions From Final Score Building Exterior Building Systems Dwelling Units Common Areas Building Wgt 15% 20% 35% 100% Wgt 15% 20% 35% 100% Wgt 18% 23% 41% 0% 100%

97 Scoring Methodology Area Points x Item Weight x Criticality x Severity
Scores calculated based on: Area Points x Item Weight x Criticality x Severity Ranges are: Area Points Site = 15 Bldg Systems = 20 Dwelling Units = 35 Bldg Ext = 15 Common Areas = 15 Item Weight (Examples) Smoke Detector = 0 Missing Toilet = 10 Damaged Ceiling = 4.5 Misalinged Chimney = 15.5 Criticality (5) Critical = (2) Contributes = 1.25 (4) Very Important = (1) Slight Contribution = 0.5 (3) Important = 2.25 Severity (3) Most Severe = 1.0 (2) Severe = 0.50 (1) Least Severe = 0.25

98 Scoring Methodology (Continued)

99 Scoring Methodology (Continued)

100 Scoring Dwelling Unit: Living Room, Ceiling - Holes/Missing Level 3 (Item Weight x Criticality x Severity) 4.5 x 3.0 x 1.0 = 13.5% *Assuming 250 Units (24 Sample Units) (Area Points x Item Weight x Criticality x Severity / # Units) 35 x x 3.0 x 1.0 = / 24 = 0.20 Point Deduction

101 * EH&S TICKET ITEM! * Scoring 15.5 x 5.0 x 1.0 = 77.5%
Building Systems: Domestic Water, Misaligned Ventilation System - Level 3 * EH&S TICKET ITEM! * (Item Weight x Criticality x Severity) 15.5 x 5.0 x 1.0 = 77.5% *Assuming 5 Buildings (Area Points Item Weight x Criticality x Severity / # Buildings) 20 x x 5.0 x 1.0 = 15.5 / 5 = 3.10 Point Deduction

102 * EH&S TICKET ITEM! * Scoring 0 x 5.0 x 1.0 = 0 no point deduction
Dwelling Units: Smoke Detector, Missing/Inoperable - Level 3 * EH&S TICKET ITEM! * (Item Weight x Criticality x Severity) 0 x 5.0 x 1.0 = 0 no point deduction 40% of the inspected properties have inoperable smoke detectors 90%+ of the time the residents have disabled the detectors this is a national problem that we must solve together *Assuming 15 Units (10 Sample Units) (Area Points x Item Weight x Criticality x Severity / # Units) 35 x 0 x 5.0 x 1.0 = 0 / 10 = no point deduction

103 Questions to be Answered
- How will certain things, like smoke detectors, be checked? (Will the inspector use canned smoke or just push the button?) A: Push the button. (No cigarettes please.) - What kind of questions should I ask the inspector before he leaves my site so that I can better understand what went wrong? A: Don’t let them leave! (Lock them up.)

104 Technical Reviews You can appeal a physical score if you believe the inspection was not conducted in accordance with the Public and Indian Housing Real Estate Assessment Center (PIH-REAC) Uniform Physical Condition Standards (UPCS) inspection protocol or feel that certain inspection data may have been recorded in error that, if corrected, will result in an improvement in the property's overall score What qualifies for a Technical Review? - Building Data Errors - Unit Count Errors - Non-Existent Deficiency Errors What does NOT qualify for a Technical Review? - Disagreements over the severity of a defect - Deficiencies that were repaired or corrected

105 Technical Reviews (Continued)
Timeline for submittal: - Public Housing = 15 days - Multifamily Housing = 30 days What to include: - All property identification information - All deficiency location information * OBJECTIVELY VERIFIABLE! * How to document: - Written Material - Photographs - Video

106 Technical Reviews (Continued)
Where to send your request: Attn: PASS Technical Reviews HUD/PIH/REAC 550 12th Street SW, Suite 100 Washington, DC What can happen: - Request Denied - New Inspection Scheduled - Correct the Inspection Report (Adjust score)

107 Database Adjustments You can appeal a physical score if you believe the inspection was not conducted in accordance with … blah … blah … blah … (Same as the previous one.) What qualifies for a Database Adjustment? - Local conditions and exceptions - Ownership issues - Adverse conditions beyond the owner’s control - Modernization work in progress What does NOT qualify for a Database Adjustment? - Deficiencies that were repaired or corrected - Deficiencies caused by residents - Items covered by the Technical Review process

108 Database Adjustments (Continued)
Timeline for submittal: - Public Housing = 15 days - Multifamily Housing = 45 days What to include: - All property identification information - All deficiency location information * OBJECTIVELY VERIFIABLE! * How to document: - Written Material - Photographs - Video

109 Database Adjustments (Continued)
Where to send your request: Attn: PASS Database Adjustments HUD/PIH/REAC 550 12th Street SW, Suite 100 Washington, DC What can happen: - Request Denied - New Inspection Scheduled - Correct the Inspection Report (Adjust score)

110 “In The Works” RAPID 1.0 (a.k.a. DCD 3.0)

111 Prototype Look and Feel
Download Inspection

112 Prototype Look and Feel
Inspection Profile

113 Prototype Look and Feel
Property Profile

114 Prototype Look and Feel
Inspection Sample

115 Prototype Look and Feel Archive / Restore Inspections

116 Prototype Look and Feel
Inspect Common Areas . . . . . . . .

117 Prototype Look and Feel
Inspect Units . . . . . . . . . . .

118 Questions to be Answered (Continued)
- How do I appeal a finding, and what kinds of documentation do I need to back up my appeal? A: Ha, ha ha. That’s a good one! (Ever hear of “War and Peace”?) - How do I educate my residents during their annual inspections in order to prevent findings during the REAC inspection? A: It’s easier to just have them move out. - Is there a checklist of standards I can use before the inspection to help me make sure everything is up to par? A: The “Top 20” list is a good place to start.

119 products/pass/pass_trng.cfm

120 For More Information

121 Any Questions? Phone: (202)


Download ppt "Texas NAHRO 31st Annual Conference and Tradeshow"

Similar presentations


Ads by Google