Download presentation
Presentation is loading. Please wait.
1
Pump House wall before installation
3
Mikie preps the wall for the utility box
5
Access from outside building. Fiber run from ML, enters building
Cisco Phone will be installed at this location Access from outside building. Fiber run from ML, enters building at this 8x8x4 junction box. 1in emt feeds fiber to NETS new utility box
6
Power has been installed at this location 3 1in emt conduits enter the utility box at this location
7
Fiber will be terminated and all
equipment will be located in this utility box. Dedicated network for PPS monitoring equipment
9
Final Product
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.