Download presentation
Presentation is loading. Please wait.
Published byHelena Fredricks Modified over 10 years ago
1
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky and Phil Martin, Consultants
2
Purpose of Study 1.Given the practical capacities of the existing schools and in light of future enrollment projections, is it feasible to reduce the number of operating school buildings and continue to maintain the quality of the educational program? If so, how might the buildings best be utilized and what might the fiscal implications be? If not, what building modifications, if any, should be made, and why? 2.Is it feasible to relocate district office functions to another school building? If so, what are the options for their relocation? 2 Castallo & Silky-Education Consultants
3
Enrollment History and Projections: Update 3 Castallo & Silky-Education Consultants
4
Updated Enrollment Projections 4 Castallo & Silky-Education Consultants
5
Potential Residential Development 8 single-family homes and an 8-plex under construction 30-40 lots on the same site, 75% could be started in next five years 86 units within four complexes with 1-3 bedroom apartments proposed 100 unit possibility on former Air Force base Current level of residential development is comparable to 5-8 years ago; during time 40 lots developed 5 Castallo & Silky-Education Consultants
6
Overview of Building Conditions 6 Castallo & Silky-Education Consultants
7
Overview: Elementary Schools 7 Castallo & Silky-Education Consultants
8
Overview: Middle School, High School, Duken Building 8 Castallo & Silky-Education Consultants
9
2010 Building Conditions Survey: Elementary Schools 9 Castallo & Silky-Education Consultants
10
2010 Building Conditions Survey: Middle School, High School & District Office 10 Castallo & Silky-Education Consultants
11
Overview of the Instructional Program 11 Castallo & Silky-Education Consultants
12
Elementary Attendance Zones 12 Castallo & Silky-Education Consultants
13
The Student and Staff School Day 13 Castallo & Silky-Education Consultants
14
Elementary School Staffing Summary 14 Castallo & Silky-Education Consultants
15
Overview of the Elementary Curriculum 15 Castallo & Silky-Education Consultants
16
Elementary Special Area Subjects 16 Castallo & Silky-Education Consultants
17
Other Curricular Items Momot and Bailey have Pre-K programs Momot and Bailey have full-day kindergarten AIS is offered in all three schools Limited ESOL program due to few students Choir at Oak and Momot (gr. 3, 4, 5) Band & orchestra at Oak and Momot 17 Castallo & Silky-Education Consultants
18
Free/Reduced Price Lunch Percentage 18 Castallo & Silky-Education Consultants
19
Elementary Student Performance: ELA 2009-10 to 2011-12 19 Castallo & Silky-Education Consultants
20
Elementary Student Performance: Math 2009-10 to 2011-12 20 Castallo & Silky-Education Consultants
21
Middle School Student Performance: Math 2009-10 to 2011-12 21 Castallo & Silky-Education Consultants
22
Elementary & Middle School Student Performance: 2012-13 ELA and Math 22 Castallo & Silky-Education Consultants
23
Number of Special Class Students 2013-14 23 Castallo & Silky-Education Consultants
24
Space Utilization 24 Castallo & Silky-Education Consultants
25
SED Space Requirements for Special Education New Construction 15:1770 square feet 12:1:1770 square feet 8:1:1550 square feet 6:1:1450 square feet 12:1:4900 square feet Resource Room300 square feet Pre-School 50 or 60 square feet/child 25 Castallo & Silky-Education Consultants
26
Classroom Space Usage 2013-14: Stafford Middle School 26 Castallo & Silky-Education Consultants
27
Practical Capacity of the Schools 27 Castallo & Silky-Education Consultants
28
Estimated Space Needs for District Office Functions 28 Castallo & Silky-Education Consultants 1-2 rooms: Superintendents Office 2.5 rooms: Business Office 1.5 rooms: Special Education Office 1.0 rooms: Buildings and Grounds 1.0 rooms: Education Technology Center 2.5 rooms: Records Storage 1.0 rooms: Credit Union 0.5 rooms: Miscellaneous
29
Options Under Consideration Option 1: Remain as is Option 2: Close Oak Street Elementary School and add 20 Classrooms to Bailey Elementary School Option 3: Change grade configuration to K- 4/5-8; 9-12; Add 8 classrooms to Bailey; Realign elementary attendance zones (1/4 Bailey/Oak to Momot); Close Oak Street 29 Castallo & Silky-Education Consultants
30
Option 2 30 Castallo & Silky-Education Consultants
31
Option 3 31 Castallo & Silky-Education Consultants
32
Questions???? 32 Castallo & Silky-Education Consultants
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.