Research on a new crystal-assisted positron source for the ILC
このプレゼンテーションでは、出席者間で討論をし、アクション アイテムを作成する場合があります。PowerPoint を使って、プレゼンテーションの実行中にアクション アイテムを作成するには ... スライド ショーの実行中に control + クリック [会議メモ] をクリック [アクション アイテム] タブをクリック アクション アイテムを入力 [OK] をクリック このようにすると、入力したアクション アイテムを集めたスライドが、プレゼンテーションの最後に自動的に作成されます。 A_R&D_06 proposal T.Suwada Accelerator Laboratory, KEK Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
2
Collaboration Japanese Group
K.Furukawa, T.Kamitani, T.Omori, M.Satoh, T.Suwada, J.Urakawa, Accelerator Laboratory, KEK K.Umemori, IMSS, KEK T.Takahashi, S.Kawada, Y.Uesugi, Hiroshima University French Group A.Variola, O. Dadoun, F. Poirier, I. Chaikovska, LAL-Orsay R.Chehab, X. Artru, M. Chevallier, IPNL-Lyon with collaboration of V. Strakhovenko , BINP-Novosibirsk Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
3
Introduction It is a challenge task to construct a dedicated and also robust positron source towards the next generation of e+e- linear colliders. The present RDR-based ILC e+ (positron) source uses photo-production from a long helical undulator to generate positrons. A crystal-assisted positron source with a hybrid target would be another approach for the ILC, and this new scheme has been adopted as the CLIC positron source. We propose that the feasibility studies based on this new scheme need to be conducted under powerful collaboration between France and Japan. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
4
An atomic undulator for the generation of unpolarized positrons for CLIC and ILC
An hybrid source using an atomic undulator (first proposition for a crystal source, Proceedings of PAC, Chicago, 1989) R.Chehab, A.Artru, F.Couchot, A.R.Nyaiesh, F.Richard Simulations of a hybrid source made of Ge or Si crystals as radiators and amorphous W as converters: For Ge and Si crystals oriented on <110> axis and 1 cm thick, we had e+ accepted yields of 0.5 to 0.6 e+/e- for 0.5 Xo thick converter and 1.2 to 1.3 e+/e- for 1 Xo thick; the incident e- energy is 20 GeV R. Chehab, POSIPOL2010, KEK, June2010 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
5
New hybrid target scheme for positron production
THE HYBRID SCHEME FOR FUTURE LINEAR COLLIDERS Assuming thin crystal target and, hence, moderate heating in it and in order to lower the amount of energy deposited in the amorphous target and also the PEDD, the following scheme has been proposed by [R.Chehab, V.M.Strakhovenko, A.Variola] This new scheme is the basis of the present common research between France and Japan. Magnet Putting a drift between the 2 targets allows sweeping off the charged particles coming from the crystal; only the ϒ impinge on the amorphous target R. Chehab, POSIPOL2010, KEK, June2010 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
6
Development of simulation code at LAL-Orsay
+ X. Artru simulation The present work is consisting in the combination of X. Artru’s program on channeling with GEANT4. The new program will be used for extended simulations and for the KEKB experiment (data analysis). O. Dadoun, POSIPOL2010, KEK, June2010 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
7
Experimental status at KEK
The purpose is the experimental evaluation for the hybrid-target scheme. Particularly, to estimate the positron-production efficiency, and to evaluate the heat load on a hybrid target. The positron-production experiments based on a hybrid target has been continued with 8-GeV e- beam at KEK and the systematic studies were carried out on the positron-production efficiency in 2010. The experiments on the heat load with a hybrid target has been continued from 2011, and however, they have been carried out as only a test experiment with 3-GeV e- beam due to the Tohoku heavy earthquake. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
8
Experimental site at KEKB LINAC
Switchyard KEKB Linac 8-GeV e- beam 1nc/bunch upto 25Hz single bunch Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
9
Site Set up at the KEK Linac Looking up from Down stream
Max. Ee-=8GeV Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France 9
10
This is the beginning of the earthquake (11 Mar.2011).
Long (~3 minutes) and strong (6 lower in Japanese scale) earthquake we never experienced! KEK Tohoku area hypocenter ~0.2 s (~5 Hz) K-Netによる加速度の観測 (防災科学技術研究所提供) 342.9 gal 328.8 gal Tsukuba Tsukidate Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
11
Drop-down of a quadrupole triplet
and the recovery work is in progress! Beamline Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
12
Experimental Setup based on the hybrid target scheme
amorphous W 8 mm 18 mm 8GeV e- Sweeping Magnet 0.96T 0.75m Analyzing magnet 5 ~ 30MeV 1mm thick W crystal Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
13
pictures e- 8GeV Sweeping magnet W Crystal on the goniometer
Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
14
pictures thermocoupoles attached back end amorphous targets
Amorphous Ws mounted on a linear stage movable stage Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
15
Experimental scheme Hybrid scheme Conventional scheme e- 8GeV γ
positrons from the target momentum analyzed Amorphous W sweep mag 1mm-thick W Crystal on axis (aligned to the beam) off axis (not aligned to the beam) temperature at the end of the targets by thermocouples and infrared camera Amorphous W e- 8GeV amorphous Ws 1.75, 3.5, 5.25, 8, 18mm Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
16
Rocking curve measurement
Amorphous W 8-GV e- sweep magnet Crystal W on a goniometer 8 mm rotaion in vertical plain Fitting function for the rocking curve Preliminary factor 3 enhancement positron yield (arb. unit) [mrad] angle of crystal axis<111> w.r.t. beam (mrad) Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
17
Positron yield measurement
Ee- = 8GeV, Pe+ = 20MeV e+ detected [a.u] amorphous W thickness [mm] Need more simulations for analyzing the magnet collimator , detector to evaluate e+ yields Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
18
Temperature Measurement with 8-GeV e- beam
Temperature of the 8mm amorphous W target for the hybrid case Beam charge ~1nC/bunch, 25Hz Preliminary Temperature (degree Celsius) ΔT~32 degree Base temp. 23.3deg. Time from Beam On (Minutes) Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
19
Temp. rise vs. total energy deposit
Temperature at equilibrium has information for total energy deposit except for 18mm hybrid (measured) conventional 18mm hybrid on axis target thickness is larger than shower maximum hybrid off axis T at equilibrium (deg.) 8mm (simulation)
20
Development of a thermocouple array to measure temperature rise of the target
Thermocouple array fixed at the back plane of amorphous target Thermocouple 1mm x 1mm to fast data logger read temperature each 10ms temperature at equilibrium 9 thermocouples are fixed on the target with use of silver paste total energy deposit bunch by bunch temperature variation PEDD information by thermocouple Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
21
Test results on pulse-by-pulse Temp. rise measurement (3-GeV e- beam)
3-GeV e- single-bunch beam is directly hitting at the center of target. 温度 The pulse-by-pulse temp. measurement has been successfully performed at the rep. rate of 1Hz. A clear signal was obtained from each thermocouple. 2mm 1秒 1mm 1℃ 1s Clear temp. signal trace with a data logger has been obtained in a test measurement. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
22
Funding requests in 2012 From French group Euro/unit Nb of units
Total (Euro) PhD Student stay in France 1000/month 3 months 3000 Visit to Japan (2 visits) 150/day 10 days Travels (2) 1000 2 travels 2000 Total 8000 From Japan group kYen/unit Nb of units Total (kYen) Travel (3persons) 750 1 travels Visit to France(3persons) 60/day 10 days 600 Total 1350 Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France
23
Summary The systematic study on positron-production efficiency has been successfully carried out with 8-GeV e- beam at KEK. Test measurements for the thermocouple array detector have been preliminary conducted to evaluate the pulse-by-pulse temperature rise with 3-GeV e- beam. The systematic simulations to estimate the detector acceptance are in progress with a new simulation code taking into account crystal effect. Due to unfortunate heavy earthquake, the recovery work of the KEKB linac is in progress, and after the suitable recovery in this September, we will restart our experiments as soon as possible. Tsuyoshi Suwada/KEKB Linac FJPPL Workshop 2012, May 2012, Le L.P.C., Clermond-Ferrand, France