Download presentation
Presentation is loading. Please wait.
1
TRANSIT POTENTIAL OF KAZAKHSTAN 2018, Bangkok
2
8% +14 88th place in 2014 77th place $ 30 billion in 2016
BRIEF OVERVIEW OF TRANSPORT SECTOR 8% Contribution to GDP since 2015 new railways 2 000 km In invested into the sector $ 30 billion renewed roads 6 300 km increased seaport capacity up to 23.5 million tons modernized airport infrastructure 15 airports In improved position in WEF GCI in terms of infrastructure quality +14 World Bank Logistics Performance Index ranking 88th place in 2014 77th place in 2016
3
MAJOR RAILWAY PROJECTS
ARKALYK – SHUBARKOL’ ZHEZKAZGAN – BEINEU Length– 214 km Length– 1036 km ASTANA Arkalyk Shubarkol’ Shalkar Moiynty Aktogai Zhezkazgan Beineu Saksaul’skaya Dostyk Yeraliyevo Korgas Zhrtygen Kuryk Uzen ALMATY UZEN’ – BOLASHAK ZHETYGEN– KORGAS Total length – 926,5 km, including: Kazakhstan– 146 km; Turkmenistan – 700,5 km; Iran – 80 km. Total length– 579 km, including: Kazakhstan– 293 km; China – 286 km.
4
DRY PORT IN FREE ECONOMIC ZONE “EASTERN GATE KHORGOS”
Logistic area 224,9 hа Industrial area 224,4 hа Dry port 129 ha KAZAKHSTAN CHINA Lianyungang Khorgos Gate Way Options Forecast freight traffic: 4,4 mln. tons in year June 29, 2015: the first start-up complex (dry port) was put into commercial operation. International Managing Director: DP World Port Operator On October 18, 2016, the infrastructure facilities of the FEZ "Khorgos-Gate Way" were put into operation To date, the formation of the infrastructure of FEZ has been fully completed LOGISTIC TERMINAL IN THE PORT OF LIANYUNGAN TOTAL AREA 21.6 HA Container area - 13 ha Open area for dry cargo - 6 ha Covered warehouses ha (12 thousand m²) 69 participants of the Special Economic Zone were registered
5
MULTIMODAL TRANSPORT THROUGH “WESTERN GATE”
Port Aktau AKTAU KURYK TURKMENBASHI ASTRAKHAN ОЛЯ MAHACHKALA BAKU ALYAT BENDER-ENZELLI NOUSHAHR AMIRABAD 3 dry cargo terminals with the capacity of 3 million tons were built in the port of Aktau increase in the capacity of seaports from 16.5 to 19.5 million tons Port Kuryk in mln. tons Phase 1: Railways ferry terminal Capacity - 4 million tons Put into operation in December 2016 Transported: 1.5 million tons of cargo increase in the capacity of seaports from 16.5 to 23.5 million tons Phase 2: Truck ferry terminal Capacity 2 million tons Put into operation in December 2017
6
INTERNATIONAL RAILWAY ALLIANCES
Стамбул Saint Petersburg Riga Dubai Bender-Abbas Moscow Lianluangan Brest Urumchi Amsterdam Chendu Dostyk Сиань Баку Khorgos Актау Берекет Astana Бейнеу Шымкент Аркалык United Transport Logistics Company TCITR Trans-Caspian International Transport Route
7
TRANSIT CONTAINER TRANSPORTATION
Рига Baku Bender-Abbas Аксарайская Абу-Даби Chuncin Chendu Saint Peterburg Uhan Чжэнчжоу Nahodka Озинки Dostyk Moscow Брест Lianyungan Berlin Urumchi Ablyk Клайпеда Istanbul Tokio Pusan Osaka Актау Болашак Илецк Altynkol Оазис Astana Almaty Number of railway lines: block trains block-trains 15 international routes with major consolidation points of China's cargo flows Container flow China- Caucasus - Turkey (thousand TEU) Container flow China - EU - China (thousand TEU) 205 Container flow Kazakhstan - Turkmenistan - Iran (thousand TEU) In up to 2 million containers
8
NEW RAILWAY LAW UNDER ELABORATION
To ensure deeper integration of railway transport into Eurasian transport links Priority to rapid transit trains Identification of functions of freight forwarders, statuses of international documents endorsed by international organizations Improvement of standards concerning functioning of railway stations, better quality of service to passengers
9
THANK YOU FOR ATTENTION
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.