Presentation is loading. Please wait.

Presentation is loading. Please wait.

Gigabit Ethernet Design ECE 4006C – Spring 2003

Similar presentations


Presentation on theme: "Gigabit Ethernet Design ECE 4006C – Spring 2003"— Presentation transcript:

1 Gigabit Ethernet Design ECE 4006C – Spring 2003
Group 7 Presentation #10 Courtenay Smith April 17th, 2003

2 Progress Report Sensitivity problem solved
Eye diagram comparisons Attenuation testing complete: Tx at 5dB, and 10dB. Loopback (TxRx) at 5dB, 10dB, and 15dB Alignment tolerance test completed. Eye diagrams and Plot Run 2 layout completed and shipped. Begun work on final paper. Presentation #10 - April 17, 2003

3 VCSEL Power Test Setup Presentation #10 - April 17, 2003

4 Sensitivity Problem Corrected
We were not driving the VCSEL hard enough. [ ] mW 320.5 V P measured IN = W 320.5 8 mV P 1 = 25 mW 320.5 289 mV P 2 = .903 Presentation #10 - April 17, 2003

5 Signal Comparisons Tx PRBS7 - Old Loopback PRBS7 - Old Tx PRBS7 - New
Loopback PRBS7 - New Presentation #10 - April 17, 2003

6 Tx Attenuation at 5dB D21.5 at 5dB K28.5 at 5dB K28.7 at 5dB
PRBS7 at 5dB Presentation #10 - April 17, 2003

7 Tx Attenuation at 10dB D21.5 at 10dB K28.5 at 10dB K28.7 at 10dB
PRBS7 at 10dB Presentation #10 - April 17, 2003

8 Loopback Attenuation at 5dB
D21.5 at 5dB K28.5 at 5dB K28.7 at 5dB PRBS7 at 5dB Presentation #10 - April 17, 2003

9 Loopback Attenuation at 10dB
D21.5 at 5dB K28.5 at 5dB D21.5 at 10dB K28.7 at 10dB Presentation #10 - April 17, 2003

10 Loopback Attenuation at 15dB
D21.5 at 15dB K28.7 at 15dB Presentation #10 - April 17, 2003

11 Alignment Tolerance Setup
Presentation #10 - April 17, 2003

12 Unconnectorized PD Eyes
K28.5 K28.7 PRBS7 Presentation #10 - April 17, 2003

13 Alignment Tolerance Results
Presentation #10 - April 17, 2003

14 Alignment Tolerance Results
Diameter of bottom circle  45 m Height of cone  76.7 m Presentation #10 - April 17, 2003

15 Run 2 Layout Presentation #10 - April 17, 2003

16 Gantt Chart Scheduled Progress On Schedule Progress Event
Presentation #10 - April 17, 2003

17 Game Plan Assemble and Test Run 2 PCB. Full throttle on FINAL PAPER.
Presentation #10 - April 17, 2003

18 Dan Quayle Quote of the Day..
“This president is going to lead us out of this recovery. It will happen.” Presentation #10 - April 17, 2003


Download ppt "Gigabit Ethernet Design ECE 4006C – Spring 2003"

Similar presentations


Ads by Google