Presentation is loading. Please wait.

Presentation is loading. Please wait.

Troy School District Bond Issue

Similar presentations


Presentation on theme: "Troy School District Bond Issue"— Presentation transcript:

1 Troy School District Bond Issue

2 Investment in Troy Schools
Last Bond Issue was in 2004; Troy residents have made a significant investment in our schools; TSD schools are nationally recognized centers of excellence.

3 Protect Our Investment
Keep us globally competitive; Ensure that staff and students have an environment conducive to teaching and learning; Maintain property values.

4 November 5, 2013 Security & Building Modifications Technology
Infrastructure Instructional Equipment Transportation

5 Security & Building Modifications
Secure entries Relocation of offices Additional security cameras Drop off/Parking changes Band/Theater/Orchestra storage

6 Technology Highlights
Interactive Projectors/Apple TV Video and technology equipment for existing courses Laptop/iPad replacements & new additions Wireless system upgrades Printer replacements Server upgrade

7 Infrastructure Highlights
Roof repairs/replacement Parking lot, walkways, drives Heating/Cooling systems Plumbing Electrical

8 Instructional Equipment Highlights
Science equipment Student desks/chairs, classroom furniture replacement Lab & specialty tables Musical instruments

9 Transportation Highlights
Bus replacement—9 year lifespan 75 total bus replacements Transport students every day

10 Bond Project Breakdown

11 2013Bond Scope $125 million Three series plan 2014 2017 2020
No tax increase for residents due to refunding of bonds and low interest rates.

12 Next Steps… Dissemination of information;
Staff, parent, and community presentations; Development of podcasts and informational materials; Updates through website, TS-TV and School Messenger.

13 Questions?


Download ppt "Troy School District Bond Issue"

Similar presentations


Ads by Google