Download presentation
Presentation is loading. Please wait.
1
Troy School District Bond Issue
2
Investment in Troy Schools
Last Bond Issue was in 2004; Troy residents have made a significant investment in our schools; TSD schools are nationally recognized centers of excellence.
3
Protect Our Investment
Keep us globally competitive; Ensure that staff and students have an environment conducive to teaching and learning; Maintain property values.
4
November 5, 2013 Security & Building Modifications Technology
Infrastructure Instructional Equipment Transportation
5
Security & Building Modifications
Secure entries Relocation of offices Additional security cameras Drop off/Parking changes Band/Theater/Orchestra storage
6
Technology Highlights
Interactive Projectors/Apple TV Video and technology equipment for existing courses Laptop/iPad replacements & new additions Wireless system upgrades Printer replacements Server upgrade
7
Infrastructure Highlights
Roof repairs/replacement Parking lot, walkways, drives Heating/Cooling systems Plumbing Electrical
8
Instructional Equipment Highlights
Science equipment Student desks/chairs, classroom furniture replacement Lab & specialty tables Musical instruments
9
Transportation Highlights
Bus replacement—9 year lifespan 75 total bus replacements Transport students every day
10
Bond Project Breakdown
11
2013Bond Scope $125 million Three series plan 2014 2017 2020
No tax increase for residents due to refunding of bonds and low interest rates.
12
Next Steps… Dissemination of information;
Staff, parent, and community presentations; Development of podcasts and informational materials; Updates through website, TS-TV and School Messenger.
13
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.