Senior Design Project Office Building
By: Heath Yeager ET – 494 Fall 2014 Instructor: Chris Koutsougeras Advisors: Mr. E. Rode and M. Zeidan
2
Objective To design an office building that can be used by multiple companies
3
Location Riverside Dr. and Nouveau Dr., Metairie, LA 70003
78, sf. 335’ x 215’
4
Survey of Land Trees Low spots Apartment complex on left
Future doctors office on right Another office building across the street
5
Zoning General Office 2 (GO-2) Banks and homesteads
The purpose of this district is to create an environment especially suited to a group of professional, general administrative, and general sales offices, together with certain commercial uses primarily to service employees in the district. The district regulations are such as to protect adjacent commercial and residential uses. Banks and homesteads Clinic, medical, dental, or chiropractic General and professional offices Laboratories, medical and dental Public utility structures Residential dwelling
6
Description Size of Building: 155’ x 100’ Basic Office Building
3 Stories tall Open floor plan – renters of space can determine the design Glass façade
7
Elevations
8
Floor Plan - 1st floor
9
Floor Plan - 2nd and 3rd floor
10
Soil Test Kenner dirt, drained Has multiple layers
Black to dark gray in color
11
Foundation Concrete pilings Pilings create more friction
Used in softer ground
12
Structural Plan
13
LRFD Calculations 𝑊 𝑈 =1.2∗1+1.6∗1.5=3.6 𝑘 𝑓𝑡
𝑊 𝑈 =1.2∗1+1.6∗1.5=3.6 𝑘 𝑓𝑡 Beam moment = 3.6∗ = 𝑘𝑓𝑡 using AISC manual table 3-2, W18x50 Girder moment = 3.66∗ ∗2∗10.83= 𝑘𝑓𝑡 using table 3-2 W24x131
14
LRFD Calculations cont’d
Reaction of beams = 3.6∗29 2 =52.2 𝑘 Reaction of girders = 2∗ ∗33 2 =163.8 𝑘 Assume it is going to be a W14x109 based on the column width ≥ 12.9” Column = 𝑃 𝑈 = 2∗52.2+2∗ ∗3= 𝑘
15
LRFD Calculations cont’d
𝑃 𝑢 = 𝑘 Using table 1-1 we can gather r = 3.73, Ag = 32 𝐾𝐿 𝑟 = .8∗11∗ =28.31 use table 4-22 to find ∅ 𝐹 𝑐𝑟 =42.3 ∅ 𝑃 𝑛 =42.3∗32= 𝑘≥ 𝑃 𝑢
16
Other Plans
17
Estimation Structure……………………………………………………….$ 1,691,624.16
Walls/Ceiling………………………………………………….$ ,017.10 Electrical……………………………………………………….$ ,289.98 Plumbing……………………………………………………….$ ,293.64 HVAC…………………………………………………………….$ ,705.57 Miscellaneous…………………………………………………$ ,945.67 Grand Total: $2,002,876.12
18
Schedule
19
Questions????