Presentation is loading. Please wait.

Presentation is loading. Please wait.

Graham Chisholm –President & CEO

Similar presentations


Presentation on theme: "Graham Chisholm –President & CEO"— Presentation transcript:

1 Graham Chisholm –President & CEO
PDAC – TORONTO – March 2008

2 Disclaimer Certain statements herein constitute “forward-looking statements” such as estimates and statements that describe ICS Copper Systems Ltd.’s future plans, objectives or goals. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by those forward-looking statements. The Company may, from time to time, make oral forward-looking statements. The Company disclaims any intention or obligation to update or revise any oral or written forward-looking statements, whether as a result of new information, future events or otherwise. The foregoing disclosure is for information purposes only and no representation or warranty is made as to its accuracy or completeness. I’LL BEGIN WITH THE USUAL DISCLOSURE FOR INFORMATION PURPOSES. 2

3 CORPORATE OVERVIEW Listed on TSX Venture Exchange- May 2007 with symbols: TSX-V:ICX, & TSX-V: ICX.WT Issued Share Capital 26,963,869 Fully Diluted (TSX) ,784,120 Management ownership % Institutional Investors % Trading History Cdn. $ .55 – 1.37 Market Cap Cdn. $19,413,985

4 PROPERTY LOCATIONS Mokambo Mine –Zambia- 80% Sebembere Mine -Zambia TBA Musoshi Tailings – DRC 76% Sakania Gold properties DRC- 73.5% “Bayombwe” P.R. –DRC-73.5%

5 Mokambo Mine –Flagship Property
Initially developed by Geomin in ’s – 77 diamond drill holes drilled-feasibility study completed. Sulphide Historical Indicated Estimate of 12mm 1.72%. Sulphide Historical Inferred Estimate of 12mm Oxide Cap drilling program nearing completion- approx meters. Land package size 403 hectares

6 Mokambo Property Geology

7

8 Mokambo Oxide Drill Program
Initial results % Cu over 4.58 meters and 1.23% Cu over meters. Cobalt % over 3.67 meters. Oxide drill program to be completed by end March 2008.

9 Sebembere Mine Developed by Geomin in 1970’s –completed a 10,700 drill program – completed a feasibility study. Historic Estimate of 16.3 m/t @1.61% Cu. Geological Structure is Sebembere Syncline. Exploratory shaft to 37 meters. Potential for oxide cap. Located 21km north west of Kabwe, Zambia.

10 Other ICS Assets. ICS will earn 76% interest in the Musoshi Tailings- DRC- in JV with MMK. ICS has a 73.5% interest in Bayombwe Concession -DRC(PR7248). ICS has 73.5% interest in 2 “gold” concessions (PR 599 and PR 600) approx 60 sq kms) near Sakania District, Kipushia, DRC.

11 Comparable Copper Companies

12 Corporate Directory Mel Smale Chairman
Graham Chisholm A.C.I.S President & CEO, Director David Makepeace M.Eng., P.Eng, Director Fred Sveinson B.Sc B.A., P.Eng, Director David Fynn C.A CFO & Director Brett Whitelaw Director Mike Halvorson Director John Mutambo M.Eng.Sc, BSc(Hons), MEIZ, R.Eng FSAIMM, Project Mngr.

13 Graham Chisholm –President & CEO
PDAC – TORONTO – March 2008


Download ppt "Graham Chisholm –President & CEO"

Similar presentations


Ads by Google