Sudbury South Area Schools
March 23, 2010
2
Sudbury South Area Schools:
Alexander PS JK-8 French Immersion Algonquin PS Long Lake PS JK-6 MacLeod PS Monetville PS RL Beattie PS Wanup PS Lo-Ellen SS 9-12 Lockerby SS
5
Ministry Benchmarks
6
Sudbury South Area Schools: Projected Enrolment
Reduction Alexander PS 277 276 (1) (0.4%) Algonquin PS 267 217 (50) (18.7%) Long Lake PS 72 61 (11) (15.3%) MacLeod PS 589 552 (37) (6.3%) Monetville PS 94 76 (18) (19.1%) RL Beattie PS 362 352 (10) (2.8%) Wanup PS 89 62 (27) (30.3%) Lo-Ellen SS 771 739 (32) (4.1%) Lockerby SS 954 842 (112) (11.7%) Total 3,474 3,177 (297) (8.6%) Figures reflect the Average Daily Enrolment (ADE) JK and SK students are reported at 1.0
7
Ministry Benchmarks
8
Capacity Loading Factors (Elementary) For purposes of determining the capacity of elementary schools (Junior Kindergarten to Grade 8), the capacity of the following types of spaces are:
9
Capacity Loading Factors (Elementary) For purposes of determining the capacity of elementary schools (Junior Kindergarten to Grade 8), the capacity of the following types of spaces are: NOTE: Special Education rooms are deemed to have a capacity of 9; General Instructional Space having an area ranging from approximately 38m2 to approximately 64m2 (400 to approximately 700 square feet) are deemed to have a capacity of 12; Special Purpose Rooms of less than 38 m2 (400 square feet) are deemed to have a capacity of 0.
10
Capacity Loading Factors (Secondary) For purposes of determining the capacity of secondary schools (Grade 9 to OAC), the capacity of the following types of spaces are:
11
Capacity Loading Factors (Secondary) For purposes of determining the capacity of secondary schools (Grade 9 to OAC), the capacity of the following types of spaces are:
12
Utilization Rating
13
Sudbury South Area Schools: Capacity Utilization
14
Cumulative Capital Projects
In 2003, the Ministry of Education conducted a review of all schools in the province. All capital projects and repairs identified through the inspections were entered into a central database. In 2005, Rainbow District School Board verified and validated all of the cumulative capital projects. In the fall of 2009, Rainbow District School Board validated cumulative capital projects in Sudbury South Area Schools.
15
Cumulative Capital Projects
16
Cumulative Capital Projects
17
Sudbury South Area Schools: Renewal Needs