Presentation is loading. Please wait.

Presentation is loading. Please wait.

4x5 SC array for the test beam in Apr 2007

Similar presentations


Presentation on theme: "4x5 SC array for the test beam in Apr 2007"— Presentation transcript:

1 4x5 SC array for the test beam in Apr 2007
Dee Calibration Apr 2007 4x5 SC array for the test beam in Apr 2007 D Cockerill, 10 April 2006

2 VPT sorting by SC position
Mean ~33 e/MeV now Old data D Cockerill, 10 April 2006

3 Backplate angle as for beam from CMS I.P.
SC region on Dee Backplate angle as for beam from CMS I.P. =2.5 =1.57 TT26 TT19 D Cockerill, 10 April 2006

4 Appropriate any five trigger mapping
DCC boundary TCC boundary ‘Any 5’ trigger map D Cockerill, 10 April 2006

5 Readout needed for 20 SCs 100 trigger GOH 20 data GOH
Dee patch panel H4 control room Short fanout trunk cable MPO MPO Readout needed for 20 SCs trigger GOH data GOH Short fanouts on Dee FE – DCC 20 optical lines = 2 short fanouts (24 lines) FE – TCC 100 optical lines = 9 short fanouts (108 lines) MEM optical lines = 2 short fanouts Totals 144 optical lines = 14 short fanouts MPO trunk cables from Dee to H4 CR (barrel had MFS trunk cables at SM10 end) 2 trunk cables 2*96 = 192 lines +1 trunk cable for CCS/token rings/MEM D Cockerill, 10 April 2006

6 Additional info D Cockerill, 10 April 2006

7 Transverse noise across Dee, VPTs sorted
ET from 30 – 60 MeV (old normalisation) D Cockerill, 10 April 2006


Download ppt "4x5 SC array for the test beam in Apr 2007"

Similar presentations


Ads by Google