1 Motor Row Streetscapes
Michigan Avenue, Cermak Road to 24th Place 23rd Street, State Street to Indiana Avenue Community Meeting February 1, 2016

2 Project Limits Michigan Ave: Cermak to 24th PL
23rd Street: State to Indiana Wabash Ave State St Michigan Ave Indiana Ave CTA Green Line 23rd St 24th St

3 23rd Street Improvements, State Street to Indiana Avenue
Construction to begin this Spring Concentrating on infrastructure improvements to create a functional and aesthetically pleasing street Road reconstruction (Wabash to alley west of Michigan) Road resurfacing (Wabash to Indiana) Streetscape Improvements (Wabash to Indiana): New sidewalks with decorative pavers New curb and gutter Catch basin upgrades/replacement Decorative lighting Trees and tree grates ADA ramps Site furniture Light pole community identifier New crosswalks Burying of ComEd lines (State to alley west of Michigan) Coordinating with water main work on 23rd Street

4 23rd Street Improvements
Construction to begin this Spring Proposed Trees Tree Grates Pavers New Walk Existing Trees New Lighting Light Pole Community Identifiers

5 Michigan Avenue, Cermak Road to 24th Place
Design underway Concentrating on placemaking improvements to compliment and expand on the infrastructure improvements completed in 2008 Initial concepts presented: Flex spaces for café, entertainment, pedestrian, exhibit use, etc. Bump outs with trees and possible pavers Light pole community identifier Crosswalks Gateway Identifier Benches Above ground planters Intersection stamps and sidewalk stamps

6 Michigan Avenue – initial concept perspectives

7 Michigan Avenue cross section – water main conflict
8” water main on both sides of street 13’ from R.O.W. preventing sidewalk expansion Maximized flex space and bump outs given requirement to remain 5’ from all service lines

8 Michigan/Cermak Gateway
Initial Concept Perspectives Gateway Concepts – A Inspirations: Period Aesthetic in Entertainment Light Pole Identifier Gateway Concepts – B Inspirations: Period Aesthetic in Car Design Gateway Concepts – C

9 Michigan Avenue Design underway
Concentrating on placemaking improvements to compliment and expand on the infrastructure improvements completed in 2008 Community Concerns/Comments: Wider sidewalks are desired Maintain street parking Next Steps: Currently coordinating with IDOT to determine final roadway width Results will determine the achievable sidewalk width (11’ – 14’) Construction anticipated to start in 2017 Water main will be upgraded and relocated first Streetscape construction will follow

10 facebook.com/CDOTNews
Thank you Website Twitter @CDOTNews Facebook facebook.com/CDOTNews