1 Speculative Production Capacity Reactive Production Capacity
Production Planning Speculative Production Capacity Reactive Production Capacity Retail Selling Initial Forecast Las Vegas Orders November March September

2 Criteria for Ordering Less Risky Styles in November
Order styles with the lowest uncertainty (standard deviation) Order styles with the highest demand (mean) Order styles with the lowest price (wholesale) Order styles with demand that is more than twice the minimum production quantity

3 First Period Production Quantity
Style Mean 2*S.D. First period production First period production – using heuristic Seduced 4017 1113 2904 3052 Assault 2525 680 1845 1706 Electra 2150 807 1343 1252 Anita 3296 2094 1202 2026 Daphne 2383 1394 989 1329 Entice 1358 496 862 600 Total 9145 10032

4 Reduce Constraints REDUCE MINIMUM LOT-SIZE CONSTRAINTS
Lean manufacturing More efficient cutting equipment (for smaller lots) Invest in worker cross-training INCREASING REACTIVE CAPACITY Longer work force hours during peak season Use more subcontractor capacity during peak season Increase total Alpine capacity Reduce manufacturing and raw material lead-times Use common components, e.g., zippers, rings Invite most representative retailers for January “Early-Write”