Presentation is loading. Please wait.

Presentation is loading. Please wait.

3E ECN Forwind REpower RWE Innogy Imperial College London

Similar presentations


Presentation on theme: "3E ECN Forwind REpower RWE Innogy Imperial College London"— Presentation transcript:

1 3E ECN Forwind REpower RWE Innogy Imperial College London
Participants 3E ECN Forwind REpower RWE Innogy Imperial College London

2 Validation Toolbox Design Operation Measurements
Wind & Turbine Measurements Cluster Control Testing Modelling Wake/flow Electrical Cluster Design Loads & Performance Cluster Control Validation Guidelines & Recommendations Improve industry practices / efficiency of power extraction Toolbox Design Operation

3 Timeline Programme Aspects Months 6 12 18 24 30 36 42 48 54 Model development Measurements Control testing Validation Toolbox Validation throughout entire process, but intensive toolbox validation in darker period.