Presentation is loading. Please wait.

Presentation is loading. Please wait.

ELCITA UPDATE December 2016.

Similar presentations


Presentation on theme: "ELCITA UPDATE December 2016."— Presentation transcript:

1 ELCITA UPDATE December 2016

2 Estate Management E – Toilets
16 e-toilets operational. 2 More E- Toilet Installation Work in Progress Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 100 % completed. GIS Web Application Software Installed in ELCITA server. Acceptance check in progress.

3 Road Works – Under Progress
East Avenue-5 (SBI Road) West Avenue-1 (IIITB Side)

4 KSSIDC Complex Internal Road
Road Works – Under Progress KSSIDC Complex Internal Road

5 Drain Works – Under Progress
West Avenue-9 (Petrol Bunk Road) West Avenue-8 (Police Station Side)

6 Drain Works – Under Progress
RS Junction Doddathogur Drain

7 Footpath Work – Under Progress
@ Lord Plaza @ Tata Power

8 Culvert Works – Under Progress
Culvert Work along West Lane-1 (Goa Estate)  Culvert Work along West Avenue-7 (Wipro Neeladri) 

9 Footpath Works – Under Progress
Footpath works at HP Avenue Construction of Compound Wall at Shiva Traders

10 Footpath Works – Completed
Shoulder Drain work along TCS Road Replacing existing chamber cover -RCC slab with Chequered Plate,

11 IIITB College, West Avenue-1 (Infosys Avenue)
Footpath Works – Completed IIITB College, West Avenue-1 (Infosys Avenue)

12 Detail Three Year Plan for Footpath works in ECity West & East Phase.
SI.NO THREE YEAR PLAN AMOUNT in Crs 1 FIRST YEAR - upto MARCH 2017 7.52 2 SECOND YEAR - APRIL 2017 to MARCH 2018 13.23 3 THIRD YEAR - APRIL 2018 to MARCH 2019 11.86 TOTAL 32.62 At the Rate of Rs. 4,375/- per Sqm

13 Landscape Work– Completed
Landscaping work below fly over & the median located in East Phase.

14 Extended Aeration Sludge System
SBT (Soil Biotechnology) STP Extended Aeration Sludge System

15 8 KLD SBT (Soil Biotechnology) STP at the Fire Station

16 300 KLD ELCITA STP

17 Mode of Transportation Sewage Treatment Plant Source and destination
Companies KSSIDC complex KIADB land 300 KLD Common STP at Elcia Park With Extended Aeration Sludge System 8 KLD SBT (Soil Biotechnology) STP at the Fire Station ELCITA Vehicle Vendor Vehicles

18 Use of treated water The Government has directed the respective license issuing & plan sanctioning authorities to include the condition in their approvals & licenses that only tertiary treated water shall be used for construction purposes, gardening, washing, servicing and cleaning of vehicles. ELCITA has informed all industries. Industries use treated water for construction and gardening

19 Sludge to compost

20 Treated water for composting and vegetables at OWTP

21 Rain water recharge at e-City

22 Estate Management Contract Awarded
Providing Security Services to ELCITA within Ecity Industrial Area. Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road KSSIDC Complex Internal Roads

23 Estate Management Contracts on Anvil
Providing House Keeping Services to ELCITA within Ecity Industrial Area. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road, Electronics City East Phase. Erkadi System to Arvind Mills Construction of 500 KLD STP in KIADB Land, Electronics City East Phase.