ENGR 581 Work Cell Integration:

Similar presentations


Presentation on theme: "ENGR 581 Work Cell Integration:"— Presentation transcript:

1 ENGR 581 Work Cell Integration:
Engineering Considerations – An Introduction

2 Questions to Consider What are design considerations for a work cell?
What makes up an integrated work cell? How are work cells implemented? What type of equipment is interfaced in a work cell? What are the goals in work cell integration? (think big picture)

3 Some Design Considerations

4 Size / Shape / Space : Product

5 Size / Shape / Space : Process

6 Part Delivery - Feeders

7 Part Delivery - Conveyors

8 Part Delivery - Conveyors

9 Part Loading/Unloading

10 Part Loading/Unloading

11 Part Loading/Unloading

12 Process Status: Andon Lights

13 Access: Equipment

14 Access: People

15 Arrangement: Work Height

16 Arrangement: Cell/Line Layout

17 Arrangement: Organization

18 Arrangement: Zoning

19 Arrangement: Fixturing

20 Safety: Access

21 Safety: Activation

22 Safety: Guarding

23 Safety: Good Lighting/Mirrors

24 Quality Assurance: Part Check

25 Quality Assurance: Part Check

26 QA: Process Check

27 Work Instructions

28 Work Instructions

29 Support Systems: Pneumatics

30 Support Systems: Hydraulic

31 Controller : Process

32 Controller : Cell

33 Work Cell Integration Goals:
Control of output / Predictability Waste reduction / Flow of product Increased safety Increased process quality / Reliability Downtime reduction

34 For Next Time Find literature / sources related to brownfield (brown field)/ greenfield (green field) implementation practices. Compare the two. Consider benefits / problems / constraints associated with work cell implementation

35 For Next Time Determine other important factors considered in the design phase of a cell Be prepared to present your findings – you may share some of your own industrial experiences to add value

36 Related Topics To Investigate:
Work Cell Standardization Lean / 5S / Flow Mfg. Time / Space Constraints Interface Requirements / Advances in Computer Technology

37