Download presentation
Presentation is loading. Please wait.
1
DR & EE Nexus in the industrial sector
Marcus Wilcox, CEO & PE Cascade Energy, Inc. © 2014 Cascade Energy
2
Cascade energy © 2014 Cascade Energy
3
Regional industry © 2014 Cascade Energy
4
refiners A 25,000 hp Motor Draws 20 MW Energy Use Equal
to 17,500 Homes
5
Refrigeration
6
Pumping
7
Process Compressors A 8,000 hp Motor Draws 6 MW Energy Use Equal to
5,000 Homes
8
Water Treatment
9
Compressed Air
10
Hydraulics
11
Electric Resistance Just a paltry 550 kW… Energy Use Equal to
~500 Homes
12
7PP - Regional industrial load
© 2014 Cascade Energy
13
7PP - Industrial least cost sector
Maximum Technical Potential by 2035 (aMW) Total Resource Cost ($/MWh) Residential 2328 95 Commercial 1871 30 Industrial 580 22 Agriculture 130 32 Note: It takes a unique, targeted approach to go get the Industrial Draft 7th Power Plan, Chapter 12 © 2014 Cascade Energy
14
Characteristics of industrial
Risk averse Secretive Slow Strategic Understaffed Stiff competition for funds Targeted expertise Priorities are safety, compliance, productivity and quality Relationship, credibility and trust-driven A single point of access to EE & DR is best © 2014 Cascade Energy
15
Dr asks of industrials Reschedule? Forgo? Store, Slow or Accelerate? Generate? © 2014 Cascade Energy
16
Industrial Ee & dr nexus
Investments in EE can be leveraged for DR Organizations that adopt Strategic Energy Management (SEM) are well-positioned for DR Interactive effects between EE & DR are site dependent Limited opportunity for short notification DR EE & DR have similar data requirements © 2014 Cascade Energy
17
Thanks Marcus H. Wilcox, CEO Cascade Energy, Inc © 2014 Cascade Energy
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.