KING ARTHUR 4500 m3 Ethylene Carrier 02/12/2018
2
02/12/2018 King Arthur
3
Technical characteristics 4500 m3 Ethylene Carrier
02/12/2018 Technical characteristics 4500 m3 Ethylene Carrier Lenght overall mt. 104,0 Lenght between perpendiculars mt. 96,0 Breadth mt. 16,0 Moulded depth (from keel to main deck) mt. 8,40 Summer draft mt. 7,50 D.W.T. tonn
4
Technical characteristics 4500 m3 Ethylene Carrier
02/12/2018 Technical characteristics m3 Ethylene Carrier Cargoes Two different products loaded, contained and discharged contemporarily providing that only one requires cooling. Acetaldehyde, Anhydrous Ammonia (max -20), Butadiene, Batane (Iso/normal), Butylene, Butane/Propane mixture, Propane, Commercial Propane, Prolylene, Vynil Chloride monomer, Isoprene, Ethane, Butadiene Hydrocarbon mixture (C4), Ethylene.
5
Technical characteristics 4500 m3 Ethylene Carrier
02/12/2018 Technical characteristics 4500 m3 Ethylene Carrier Segregated ballast capacity Cum Bunker capacity High f.o. m3 450 – gasoil m3 100 at 100% 4000 Kw at 720 rpm Service speed 15,8 knots at 85% with 15% sea margin Max speed 17,4 knots Nitrogen generator 450 Ncum /h at 99% Green Star notation Alternative propulsion System Two deck tanks 25m3
6
The fastest ethylene carrier in the world!!!
02/12/2018 Points of STRENGHT Max speed 17,4 knots Low consuption design 25 years life design High manoeuvrability Bow thruster High bridge visibility 2 deck tanks for commercial flexibility & change of cargo Green star notation Shaft generator kw suitable for cooling down in navigation Alternative propulsion system Double hull to protect bunkering area Full redundancy of electric propulsion: four auxiliary engines High mooring retention The fastest ethylene carrier in the world!!!
7
KING ARTHUR under construction at Bach Dang Shipyard
02/12/2018 KING ARTHUR under construction at Bach Dang Shipyard Hull completed
8
Tanks Cargo tanks on barges at Shipyard Cargo tank installation
02/12/2018 Tanks Cargo tanks on barges at Shipyard Cargo tank installation
9
Bottom view during cargo tank installation
02/12/2018 Tanks Bottom view during cargo tank installation Cargo tank installation
10
02/12/2018 Launching
11
Up-to-date Overview Superstructures Side overview
02/12/2018 Up-to-date Overview Superstructures Side overview
12
Mooring winches / windlass
02/12/2018 Fore manouvering area Manifold area Mooring winches / windlass
13
Canopy Deck overview Deck tanks for gassing up www.mediterraneanav.it
02/12/2018 overview Deck tanks for gassing up
14
Bridge Navigation Bridge Bridge radio station www.mediterraneanav.it
02/12/2018 Bridge Navigation Bridge Bridge radio station
15
02/12/2018 Bridge 2 Navigation Bridge
16
Crew mess room Smoking room Officer mess room www.mediterraneanav.it
02/12/2018 Crew mess room Smoking room Officer mess room
17
Accomodations Master bedroom / Master day room /
02/12/2018 Accomodations Master bedroom / Master day room / Chief engineer bedroom Chief engineer day room
18
Accomodations Officer cabin Double crew cabin www.mediterraneanav.it
02/12/2018 Accomodations Officer cabin Double crew cabin
19
Cargo control room Engine control room www.mediterraneanav.it
02/12/2018 Cargo control room Engine control room
20
02/12/2018 Pantry Ambulatory - hospital
21
Engine Room Engine control room Nitrogen generator room
02/12/2018 Engine Room Engine control room Nitrogen generator room
22
Engine Room 2 Servo valve power pack generators main engine
02/12/2018 Engine Room 2 Servo valve power pack generators main engine
23
Workshop Purifiers room Sterring gear room www.mediterraneanav.it
02/12/2018 Purifiers room Sterring gear room
24
02/12/2018
25
News report from Vietnamese
02/12/2018 Delivery Forth & fifth generation News report from Vietnamese national television
26
“THE END” MEDITERRANEA di NAVIGAZIONE S.p.A.