Butte County Board of Supervisors September 27, 2016
Initial Study/Mitigated Negative Declaration for Evidence Building and Morgue Agenda Item 5.02 Butte County Board of Supervisors September 27, 2016
2
Request Adopt an Initial Study and Mitigated Negative Declaration for the Butte County Evidence Building and Morgue
3
Public Safety Neighborhood
4
Need for Project Existing 2500 sq. ft. evidence building does not accommodate contemporary evidence handling procedures, is not climate controlled, and will be demolished under a ministerial building permit to accommodate construction of the Supplemental Jail Facility north of the existing Jail. No existing Morgue; autopsies performed at local mortuaries
5
Background Existing evidence building built in 1960’s and is no longer serviceable Replacement of the Evidence Building has been in the Capital Improvement Program since 2004 Board contracted with Nacht & Lewis for design services for Evidence Building & Morgue in February, 2016
6
Project Description 11,00 Evidence Building & Morgue
Construction staging and access areas (1.35 acres) for construction equipment too heavy to safely utilize Sheriff’s Access Road. Storage for 43 bodies w/ three autopsy tables 1,000 sq. ft. of outdoor storage About 25 additional parking spaces LEED Silver or equivalent standards Nighttime exterior security lighting
7
Conceptual Site Plan
8
CEQA Findings The proposed Evidence Storage Building and Morgue will have a less than significant impact with incorporation of seven mitigation measures No comments received during the 30-day review period, August 24 to September 23, 2016
9
Mitigation Measures (1 of 2)
Aesthetics (Minimize Off-Site Glare from Exterior Lighting); Air Quality (Ensure Adequate Dust Control); Air Quality (Minimize Combustion Emissions from Heavy-Duty Construction Equipment); Biological Resources (Migratory Birds) Cultural Resources (Protection of Cultural Resources Found During Work);
10
Mitigation Measures (2 of 2)
Hydrology/Water Quality (Prepare Low Impact Development Plan to Manage Post- Construction Stormwater Runoff); Noise (Limit Work to Daytime Hours and Provide Best Available Noise Suppression).
11
Recommendation: Adopt the resolution and authorize the chair to sign.