Download presentation
Presentation is loading. Please wait.
1
Presentation on IMR flaw analysis
2
Details Flaw detection
Date of laying : /08 GMT passed : Sectional GMT : Frequency of testing : months Last date of testing : /07/16 Result in last date of testing : GOOD Date of detection of flaw : 21/10/16
3
Freezed Peak pattern observed in USFD machine
4
Dissection for the flaw
5
Longitudinal section of main flaw
Head checks Main flaw Direction of traffic
6
Closer view of the flaw Head checks Main flaw
7
Multiple flaw detected within 10 cms
Head checks Horizontal flaw in developing stage Main flaw Direction of traffic
8
Multiple Head checks with an angle of 25 to 35 degress
Main flaw with angle of degrees
9
Main flaw angles Main flaw with 65 degress
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.