Introduction Members: Robert E. Meyer III Dan Phan-Quoc Kieu Michael T. Riley Andrew Siefer Advisors: Dr. J. W. Lamont Dr. R. E. Patterson III Client:

Similar presentations


Presentation on theme: "Introduction Members: Robert E. Meyer III Dan Phan-Quoc Kieu Michael T. Riley Andrew Siefer Advisors: Dr. J. W. Lamont Dr. R. E. Patterson III Client:"— Presentation transcript:

1 M.E.L.V.I.N. Electronic Voting System for a Legislative Body May02-05 04/30/02

2 Introduction Members: Robert E. Meyer III Dan Phan-Quoc Kieu Michael T. Riley Andrew Siefer Advisors: Dr. J. W. Lamont Dr. R. E. Patterson III Client: GSB (ex-client)

3 Outline Introduction Problem Statement Design Objectives
End Product Description Assumptions and Limitations Technical Approach Evaluation of Success Recommendations Budgets Lessons Learned Closing Summary Questions

4 Problem Statement The Government of the Student Body takes many votes per session. These votes are currently taken by roll call voting. Roll call voting is extremely time consuming. This leads to long meetings and wasted time.

5 Our Mission We are to design a voting system that will save the GSB time.

6 Design Objectives: Hardware
Basic Voting Functions Cost Effectiveness Ease of Use Fits Current Infrastructure Expandability Environmental Adaptability

7 Design Objectives: Software
Ability to Tally Results Logging of All Votes Attendance Monitor

8 End-Product Description
Basic Voting functions ID Referencing Display of Results Port to Microsoft Excel Attendance

9 M.E.L.V.I.N. Interface

10 Conceptual Drawing

11 Assumptions and Limitations
Cost Training Funding Available Parts

12 Technical Approach Daisy Chaining of Modules Router Configuration
PC Interface Router Control Router Configuration

13 Evaluation of Project Success
Design of System Completed Software Design Completed Development of Software Completed Partial Development of Hardware Partial Hardware/Software Integration

14 Recommendations Ensure Rapid Budget Approval
Guarantee interest in project Departmental Parts Database Saves time during R & D Phase

15 Initial Budget

16 Actual Budget

17 Human Budget

18 Lessons Learned Technical Knowledge Non-technical Knowledge
Visual Basic Microprocessor Development Digital Circuit Design Non-technical Knowledge Third Party Relations Budget Development

19 Closing Summary Our system will provide: Faster Voting Time
Greater Flexibility Logging of Votes Improved Time Efficiency

20 Project Demonstration
MELVIN and Modules

21 Questions?????


Download ppt "Introduction Members: Robert E. Meyer III Dan Phan-Quoc Kieu Michael T. Riley Andrew Siefer Advisors: Dr. J. W. Lamont Dr. R. E. Patterson III Client:"

Similar presentations