Download presentation
Presentation is loading. Please wait.
Published byAbigayle Phelps Modified over 6 years ago
1
WESLEYAN P-4-8 MAJOR MAINTENANCE FY 15 356 WASHINGTON STREET
1ST FLOOR COMMON ROOM /MEDITATION ROOM/ HALLS / STAIRS NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 15 356 WASHINGTON STREET EXTERIOR PAINTING / CARPENTRY REPAIRS – CARPET INSTALLATION SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-4-8
2
WESLEYAN P-4-9 356 WASHINGTON STREET
KITCHEN / CLOSET / LAUNDRY / ENTRY 356 WASHINGTON STREET EXTERIOR PAINTING / CARPENTRY REPAIRS – CARPET INSTALLATION SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-4-9
3
WESLEYAN P-4-10 356 WASHINGTON STREET
EXTERIOR PAINTING / CARPENTRY REPAIRS – CARPET INSTALLATION SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-4-10
4
WESLEYAN P-4-11 356 WASHINGTON STREET 2ND FLOOR BEDROOMS
EXTERIOR PAINTING / CARPENTRY REPAIRS – CARPET INSTALLATION SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-4-11
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.