Presentation is loading. Please wait.

Presentation is loading. Please wait.

TJC (The Joint Commission) Report Generating Feature…

Similar presentations


Presentation on theme: "TJC (The Joint Commission) Report Generating Feature…"— Presentation transcript:

1 TJC (The Joint Commission) Report Generating Feature…

2 Let’s walk through some basic and powerful TJC report generating features…

3 Open TJC Reports Folder
After you initiate “Start TJC Reporting” you then run your electrical system through your testing procedures. Start TJC Recording Stop TJC Recording Open TJC Reports Folder TJC

4 After you initiate “Start JCAHO Reporting” you then run your electrical system through your testing procedures. After you initiate “Start TJC Reporting” you then run your electrical system through your testing procedures.

5 TJC Testing in Progress
Status indicator pops up. TJC

6 Open TJC Reports Folder
You have now captured all required data in the start/stop time “window”. Start TJC Recording Stop TJC Recording Open TJC Reports Folder TJC

7 Open TJC Reports Folder
Start TJC Recording Stop TJC Recording Open TJC Reports Folder TJC TJC

8 TJC TJC Recording TJC Recording

9 TJC Recording

10 Open TJC Reports Folder
After reports are completed, print out, download or disseminate as needed. Start TJC Recording Stop TJC Recording TJC Open TJC Reports Folder TJC

11 Open TJC Reports Folder
TJC Controls Start TJC Recording Stop TJC Recording Manually initiated Start time: 4:46, end time: 6:34. The test ran approx. two hours. Automatic or situational automatic initiation of the TJC reporting feature is also available. Open TJC Reports Folder

12 Same approx. two hour window.

13

14 Example of Engine Data TJC screens.

15

16


Download ppt "TJC (The Joint Commission) Report Generating Feature…"

Similar presentations


Ads by Google