Download presentation
Presentation is loading. Please wait.
1
CUORE Detector Calibration System
Lead shield 40K 300K 4K 0.7K 70mK 10mK guide tubes detector support plate bolometers @ ~10 mK insertion of 12 γ sources that move under own weight top view of detector array with source positions cryostat detector calibration system in cryostat source locations Karsten Heeger, Univ. of Wisconsin CRC, October 29-30, 2012
2
Started Installation of DCS Components above 4K
Lead shield 40K 300K 4K 0.7K 70mK 10mK guide tubes detector support plate bolometers @ ~10 mK S-shaped guide tubes between 300K and 4K first DCS hardware installed at LNGS in September 2012 detector calibration system in cryostat Karsten Heeger, Univ. of Wisconsin CRC, October 29-30, 2012
3
Starting DCS Commissioning in Early 2013
Lead shield 40K 300K 4K 0.7K 70mK 10mK guide tubes detector support plate bolometers @ ~10 mK first DCS motion system to be installed and commissioned in Feb 2013 final full-scale test of DCS hardware at Wisconsin detector calibration system in cryostat Karsten Heeger, Univ. of Wisconsin CRC, October 29-30, 2012
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.