Performance Degradation cERL Injector Cryomodule

Similar presentations


Presentation on theme: "Performance Degradation cERL Injector Cryomodule"— Presentation transcript:

1 Performance Degradation cERL Injector Cryomodule
and Performance Recovery in cERL Injector Cryomodule Eiji Kako (KEK, Japan)

2 cERL Injector Section 500 kV DC Gun 2K Cold Box Gate valve Buncher
Cavity X-ray detector Faraday cup Screen monitor Lower Center Upper Collimator No.1 Faraday cup Screen monitor No.2 No.3 Injector Cryomodule Merger Section Ion pump Specification 7.0 MV/m x 3 cavity Total Vacc : 5 MV

3 Assembly of Injector Cryomodule
History of cool-down cycles Year 2012 2013 2014 2015 2016 Assembly of Injector Cryomodule 1st cool-down 2nd cool-down 3rd cool-down 4th cool-down 5th cool-down 6th cool-down 7th cool-down 8th cool-down 9th cool-down 10th cool-down 4 6 9 Low RF power tests of Injector Cryomodule 1 High RF power tests of Injector Cryomodule 4 Beam commissioning of Injector section at 5 MeV 5 7 11 High RF power tests of Main Linac Cryomodule Beam commissioning of Main Linac section 1 3 Beam commissioning of Re-circular ring 4 6 Beam operation at 20 MeV, ~10 mA 1 4 LCS experiments 5 6 Beam operation at 20 MeV, ~100 mA 1 3 Beam operation at 20 MeV, ~1 mA

4 Severe increase of x-ray radiation level
> 100 mSv/h Jump Jump #1 Cavity #2 Cavity #3 Cavity Total : 5 MV (Ave. 7.0 MV/m) Quench

5 Performance degradation in long term beam operation for 3 years
Eacc = 7.0 MV/m individual cavity Eacc = 7.0 MV/m individual cavity Observations Degradation firstly initiated in #3 cavity close to merger section. Then, contamination area seems to have gradually extended toward #2 cavity and #1 cavity. Qo values in #3 cavity dramatically degraded after June 11th , together with heavy x-ray radiation. Field emitted electrons, which run away from #3 cavity, were accelerated by #2 and #3 cavities. These electrons went toward upper stream and collided with cathode surface of DC-gun.

6 Pulsed RF conditioning for performance recovery
CW 30 kW Klystron CW 300 kW Klystron QL interlock < 0.8 x QL(normal)

7 Performance recovery by pulsed RF conditioning

8 Questions ?? How do you clean warm components?
Gate valves Ion pump Beam position monitor Screen monitor Faraday cup Collimator Beam pipes (Charge-up of insulator) Where dust particles come from?