Download presentation
Presentation is loading. Please wait.
Published byMartha Pitts Modified over 6 years ago
1
CHANGES THAT AFFECT US Traffic Changes in the Mine
File No: SHWD001 Date Issued: 2nd February Description: Mining progression in the Sherwood pit has required traffic to be split into two one way sections. The two sections are on different elevations with the lower elevation being for traffic heading to the dump and the upper section for traffic coming from the dump. Reason for Change: Changes are required inline with the mining sequences in Sherwood Justification: To ensure that the haul road has adequate width for haul road traffic Actions to Take: Please ensure on your passage through this area you are aware of the changes From Dump to Shovel From Shovel to Dump Two way traffic resumes Smallwood / Goulet Approach Please proceed with caution in this area
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.