Presentation is loading. Please wait.

Presentation is loading. Please wait.

7-Module beam test D. Attié, P. Colas, W. Wang,

Similar presentations


Presentation on theme: "7-Module beam test D. Attié, P. Colas, W. Wang,"— Presentation transcript:

1 7-Module beam test D. Attié, P. Colas, W. Wang,
M. Dixit, P. Hayman, A. Robichaud, T. Maerschalk, J. Timmermans. I’m here to present a TPC review LCTPC WP Phone Meeting #158 September 13, 2012

2 LCTPC WP phone meeting #158
Summary of the tests S S P S S PS September 13, 2012 LCTPC WP phone meeting #158

3 LCTPC WP phone meeting #158
Metallic dust issue ~4 mm September 13, 2012 LCTPC WP phone meeting #158

4 LCTPC WP phone meeting #158
Endplate gaps Distance: ~ 3 mm Detector sides are grounded Field distorsion !? 3.2 mm September 13, 2012 LCTPC WP phone meeting #158

5 LCTPC WP phone meeting #158
Nice cosmic events September 13, 2012 LCTPC WP phone meeting #158

6 LCTPC WP phone meeting #158
Last run: 100 first events September 13, 2012 LCTPC WP phone meeting #158

7 Data taking program (B=1T)
Commissioning (pedestals, cosmics): 100 kevts Z scan: 300 kevts Z = 0 ; 0.5 ; 1 ; 2.5 ; 5 ; 10 ; 15 ; 20 ; 25 ; 30 ; 35 ; 40 ; 45 ; 50 ; 55 ; 57 cm E = 140 ; 230 V/cm Gain scan: 100 kevts V = 330 ; 340 ; 350 ; 360 ; 370 ; 380 ; 390 X and  scans at E=230 V/cm: kevts X every 2 mm Z = 5 ; 30 cm Peaking time scan: 30 kevts September 13, 2012 LCTPC WP phone meeting #158

8 LCTPC WP phone meeting #158
Next steps After installation, everything worked fine (106 events taken) smoothly Connections between FECs and detector PCB need to be improved Other minor improvements have to be done 4 more detectors have been produced by Cern and have to be tested, the last one will be produced during the next weeks Data analysis is in progress within MarlinTPC framework September 13, 2012 LCTPC WP phone meeting #158


Download ppt "7-Module beam test D. Attié, P. Colas, W. Wang,"

Similar presentations


Ads by Google