Boiler Controls & Instrumentation K Karthikeyan Manager Controls & Instrumentation BHEL, Tiruchirappalli

3 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I INTRODUCTION PART I - BOILER PART 2 - INSTRUMENTATION PART 3 - CONTROLS Bharat Heavy Electricals Limited - Tiruchirappalli

4 Boiler Controls & Instrumentation
Boiler C&I Boiler Controls & Instrumentation Bharat Heavy Electricals Limited - Tiruchirappalli

5 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler C&I -Functions Bharat Heavy Electricals Limited - Tiruchirappalli

6 Boiler Controls & Instrumentation
Boiler C&I Boiler Controls & Instrumentation Broad engineering activities Control systems engineering Instrumentation engineering Electrical systems engineering New product development Bharat Heavy Electricals Limited - Tiruchirappalli

7 Boiler Controls & Instrumentation
Boiler C&I Boiler Controls & Instrumentation Functions Proposal Engineering Contract Engineering Product Engineering Quality Assurance & Control Field Engineering Research & Development Bharat Heavy Electricals Limited - Tiruchirappalli

8 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Proposal Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

9 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Proposal Engineering Scope of Work Project Estimate Offer submission Offer evaluation by customer Award of contract Bharat Heavy Electricals Limited - Tiruchirappalli

10 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Proposal Engineering In summary, the purpose is to draw-up - Scope of Work - Project Estimate of the project. Deliverables : - Estimable quantity(BOM)- main and spares - Datasheets - Descriptive offers of packages & - Preliminary design sketches(P&IDs, GA). Bharat Heavy Electricals Limited - Tiruchirappalli

11 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Scope of Work Arrived based on a broad specification prepared by the customer/consultant. Individual system scope identified gets recompiled into a project scope of work . Project scope document includes scope of work , terminal points & exclusions Bharat Heavy Electricals Limited - Tiruchirappalli

12 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Scope of Work The typical scope covered in Boiler C&I discipline include Furnace safeguard Supervisory system Secondary Air Damper control system Soot blower control system Boiler area field instruments Associated cable & accessories. Electricals(MCC, elevator etc.) Bharat Heavy Electricals Limited - Tiruchirappalli

13 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Offer evaluation The offers get evaluated at the customer end. Customer awards the contract on a technically qualified bid with the lowest price. The award of contract is indicated by a ‘Letter of Intent’ received from the customer. Bharat Heavy Electricals Limited - Tiruchirappalli

14 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Award of contract The offers get evaluated at the customer end. Customer awards the contract on a technically qualified bid with the lowest price. The award of contract is indicated by a ‘Letter of Intent’ received from the customer. Bharat Heavy Electricals Limited - Tiruchirappalli

15 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls & Instrumentation Contract Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

16 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Contract Engineering Packages SG integral C&I(Trichy) Station C&I(PEM or customer)- in case of BTG or Turnkey SG integral electricals(Trichy) Station Electricals(PEM or customer)- in case of BTG or Turnkey Bharat Heavy Electricals Limited - Tiruchirappalli

17 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Contract Engineering The role involves system level contract coordination for the boiler C&I area. Applicable PGMA List Sub Delivery check list. Boiler Contract Regular activity(BCR) schedule ‘00’ PG list(erection documents). Applicable O&M documents. Bharat Heavy Electricals Limited - Tiruchirappalli

18 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Contract Engineering System Engg. Documents involved : Piping&Instrumentation Diagrams(P&IDs) Measurement & control recommendations Automatic control schemes Interlock & protection schemes Bharat Heavy Electricals Limited - Tiruchirappalli

19 P & I Diagram- Air & flue gas (portion)
Boiler C&I P & I Diagram- Air & flue gas (portion) Bharat Heavy Electricals Limited - Tiruchirappalli

20 Instrument schedule steam & water (sample)
Boiler C&I Instrument schedule steam & water (sample) Bharat Heavy Electricals Limited - Tiruchirappalli

21 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Product Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

22 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Product Engineering Detailed design of Boiler C&I products & systems Digital controls Analog controls Electrical systems & cables Field instruments Special instruments Actuators Bharat Heavy Electricals Limited - Tiruchirappalli

23 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Product Engineering Digital Controls Burner management system. Soot Blower control system Analog Controls Secondary air damper control system. Auxiliary PRDS control system. Bharat Heavy Electricals Limited - Tiruchirappalli

24 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Product Engineering Electrical systems Control supply panels LT Motor control centres Power distribution panels Field instruments Switches & gauges for Pressure,Level & temperature Thermocouples Flow elements Bharat Heavy Electricals Limited - Tiruchirappalli

25 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Product Engineering Special instruments Flame scanner system Acoustic steam leak detection system. Electronic water level indicator. Closed circuit television system. Vibration monitoring system. Flue gas analysers. Steam and water analysers. Bharat Heavy Electricals Limited - Tiruchirappalli

26 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Product Engineering Electrical and C & I engineering design Release of indents for C & I sub-delivery items. Evaluation of technical offers for bought-out items Technical Delivery Conditions (TDC) Bharat Heavy Electricals Limited - Tiruchirappalli

27 Quality Control & Assurance
Boiler C&I Boiler Controls & Instrumentation Quality Control & Assurance Bharat Heavy Electricals Limited - Tiruchirappalli

28 Quality Control & Assurance
Boiler C&I Quality Control & Assurance The role involves preparation/review of following activity w.r.t C&I products & systems Prepare Standard Quality Plans (SQP) Prepare Contract Quality Plans (CQP) Review/Approve Vendor Quality Plans (VQP) Issue Reference Quality Plans (RQP) Prepare Inspection Check Lists (ICL) Bharat Heavy Electricals Limited - Tiruchirappalli

29 Quality Control & Assurance
Boiler C&I Quality Control & Assurance Performing inspection at vendor works for CI products & systems - bought-out items Review & dispose Site Action Requests on CI products & systems Bharat Heavy Electricals Limited - Tiruchirappalli

30 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Field Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

31 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Field Engineering The role involves Providing technical support / trouble shooting of C&I products / system during - Erection & commissioning stage of project - Operation after handing over to customer Review & dispose Commissioning action requests Review & dispose Contract closing pending issues Visiting sites to ensure smooth progress of C&I site activity Bharat Heavy Electricals Limited - Tiruchirappalli

32 Research & Development
Boiler C&I Boiler Controls & Instrumentation Research & Development Bharat Heavy Electricals Limited - Tiruchirappalli

33 Research & Development
Boiler C&I Research & Development In-house developed C&I systems & products Microprocessor based Gravimetric coal feeder controls - BHELFEED Microcontroller based Flame moniotirng system - BHELSCAN Acoustic steam leak detection system – BHELSONIC Electronic water level Indicator system- BHELVISION Bharat Heavy Electricals Limited - Tiruchirappalli

34 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Basics Bharat Heavy Electricals Limited - Tiruchirappalli

35 BOILER CLASSIFICATION
Boiler C&I BOILER CLASSIFICATION Cycle Conventional (Rankine cycle) HRSG (combined cycle) Nuclear Circulation Natural, Controlled Once through Type of firing Corner Front Downshot FBC Stoker Fuels Oil Coal Gas End use Utility Industrial Bharat Heavy Electricals Limited - Tiruchirappalli

36 Boiler C&I BOILER CLASSIFICATION
Bharat Heavy Electricals Limited - Tiruchirappalli

37 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I BHEL BOILERS Power Boilers Up to 600 MW rating(Coal, oil and gas fired - Subcritical) Up to 800 MW - Supercritical Nuclear steam generators Up to 235 MW rating Industrial boilers Up to 450 Tonnes/hour rating Fertilisers, Petrochemical, Steel & Paper industries Wide range of fuels- Oil, Gas, BFG, Bagasse, Black liquor. Bharat Heavy Electricals Limited - Tiruchirappalli

38 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Bharat Heavy Electricals Limited - Tiruchirappalli

39 Schematic of a boiler

40 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Bharat Heavy Electricals Limited - Tiruchirappalli

41 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I UTILITY BOILERS - ESSENTIAL COMPONENTS Furnace & Circulation system Superheaters Reheaters Economiser Airheaters Fans Pulverisers Raw coal feeders Fuel firing system Sootblowers Bharat Heavy Electricals Limited - Tiruchirappalli

42 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I CIRCULATION SYSTEMS Natural circulation Controlled circulation Once through Circulation ratio : Mass rate of water fed to the steam generating tubes to the mass rate of steam generated. Natural circulation 6 Controlled circ Once through 1 Bharat Heavy Electricals Limited - Tiruchirappalli

43 Boiler C&I BOILER CIRCULATION SYSTEMS
Bharat Heavy Electricals Limited - Tiruchirappalli

44 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Fans 1. Axial Impulse type - IGV Control. Reaction type - Blade pitch Control. 2. Radial Inlet damper control, Variable speed control; Variable speed control by two speed motor, Hydraulic coupling or Variable frequency drive. Bharat Heavy Electricals Limited - Tiruchirappalli

45 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Radial Fan Bharat Heavy Electricals Limited - Tiruchirappalli

46 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Axial Reaction Bharat Heavy Electricals Limited - Tiruchirappalli

47 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I RADIAL FANS - SPEED CONTROL Flow proportional to Speed Flow proportional to (Impeller Dia) 3 Head proportional to (Speed) 2 Head proportional to (Impeller Dia) 2 Hence Variation in speed alters the performance Bharat Heavy Electricals Limited - Tiruchirappalli

48 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FANS IN BOILER - SCOPE Primary air fans - Dries & transports Pulverised coal Forced draft fans - Supplies Combustion air Induced draft fans - Sucks Flue gas out of furnace Bharat Heavy Electricals Limited - Tiruchirappalli

49 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I MILL - GRINDS COAL Slow speed mills (Tube mills - 15 to 25 RPM) Medium speed mills (Bowl mill, Ball and race mill etc.- 50 to 100 RPM) High speed mills (hammer mills directly coupled to motor to 1000 RPM) Bharat Heavy Electricals Limited - Tiruchirappalli

50 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I RAW COAL FEEDERS Scope : CONVEY RAW COAL TO MILL Volumetric - Rotary and drag link, Gravimetric – Endless belt type Types : Bharat Heavy Electricals Limited - Tiruchirappalli

51 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I AIRHEATER Heat recovery equipment Extract heat from Flue gas to heat primary & secy. Air Regenerative type ( Rotating drive ) Tubular type Types : Bharat Heavy Electricals Limited - Tiruchirappalli

52 SOOTBLOWERS Remove ash & slag from pressure part tubes
Boiler C&I SOOTBLOWERS Remove ash & slag from pressure part tubes Types Long retractable sootblowers - traverse & rotary motors Half retractable sootblowers- traverse & rotary motors Rotary blowers - rotary motor Wall blowers - traverse & rotary motors Furnace temperature probe - Used during boiler start up Bharat Heavy Electricals Limited - Tiruchirappalli

53 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FUELS & COMBUSTION Fuels : Coal Oil Gas H/C ratio Natural gas Fuel oil Coal Calorific value (kcal/kg ) Gas Oil Bituminous coal Lignite Coal burning methods "On grate" “In suspension" Fluidised bed Three 'T's of combustion Time Temperature and Turbulence. Bharat Heavy Electricals Limited - Tiruchirappalli

54 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FUELS & COMBUSTION Rapid combustion Short period of time High temperature & Very turbulent flame . Less turbulence and longer burning produces fewer nitrous oxide. In some cases combustion is delayed or staged intentionally to obtain fewer nitrous oxide or to obtain desired flame characteristics. Bharat Heavy Electricals Limited - Tiruchirappalli

55 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I COMBUSTION CALCULATIONS The amount of carbon and oxygen for complete combustion of Carbon are represented by the formula Carbon + Oxygen = Carbon di oxide C + O2 = CO BTU/Kg C 12 Kgs + 32 Kgs = 44 Kgs. The formula for combustion of hydrogen is represented by Hydrogen + Oxygen = Water 2H2 + O2 = 2H2 O BTU/Kg H2 4Kgs + 32 Kgs = 36 Kgs Bharat Heavy Electricals Limited - Tiruchirappalli

56 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I COMBUSTION CALCULATIONS An example of incomplete combustion reaction, Carbon + Oxygen = Carbon monoxide 2C + O2 = 2CO BTU/Kg C 24Kgs + 32 Kgs = 56 Kgs With right conditions of time, temperature and turbulence, by adding more oxygen to the carbon monoxide, the carbon monoxide will further oxidise to carbon di oxide resulting in the second part of heat energy from the original carbon. Carbon monoxide + Oxygen = Carbon di oxide 2CO + O2 = 2 CO BTU/Kg CO 56 Kgs Kgs = 88 Kgs Bharat Heavy Electricals Limited - Tiruchirappalli

57 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I COMBUSTION CALCULATIONS The theoretical requirement of combustion is given by Kgs air/ Kgs of fuel =11.53C (H2 - O2/8) S, where C, H2, O2 and S are decimal equivalent to ultimate analysis % by weight. If flue gas oxygen content is known, Excess air (%) = K[21/(21-% Oxygen) -1] * 100, where K = 0.9 for gas, 0.94 for oil and 0.97 for coal. This formula is based on dry basis percentage oxygen. Bharat Heavy Electricals Limited - Tiruchirappalli

58 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Instruments Bharat Heavy Electricals Limited - Tiruchirappalli

59 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Bharat Heavy Electricals Limited - Tiruchirappalli

60 Instrumentation representation- ISA
Boiler C&I Instrumentation representation- ISA First letter P-Pressure T-temperature F- Flow A- Analytical Succeeding letters A- Alarm I- Indicate R- Record Q- Integrate C- Control S- Switch T- tansmitter E- Element P- Pocket W- Well Bharat Heavy Electricals Limited - Tiruchirappalli

61 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Boiler Controls Bharat Heavy Electricals Limited - Tiruchirappalli

62 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I BOILER CONTROLS Continuous control : Objective Enabling Automatic Operation. Optimising operating performance. On-Off control : Supervise process operation for safety Prevent process from entering unsafe condition. Bharat Heavy Electricals Limited - Tiruchirappalli

63 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I BOILER CONTROLS Auto control system Boiler Auxiliaries interlocks & protection system Furnace safeguard supervisory system (FSSS) Bharat Heavy Electricals Limited - Tiruchirappalli

64 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Auto control system. Master demand Combustion and draft control Feed-water control Steam-temperature control Bharat Heavy Electricals Limited - Tiruchirappalli

65 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Master demand 'Master demand' controls the boiler operation. Set from unit load demand or main steam header pressure control ‘Master demand’ sets burners firing at a rate required for steam production and corresponding air flow demand Bharat Heavy Electricals Limited - Tiruchirappalli

66 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Combustion control Fuel flow control Air Flow Control Coal mill control Objective : Fuel is consumed at a rate that exactly matches the Steam demand. Fuel is consumed safely, so that the energy is released without risk to plant, personnel or environment Bharat Heavy Electricals Limited - Tiruchirappalli

67 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Combustion control Air Fuel/Cross Limiting AIR CONTROL FT PT A T P I f(x) Fuel FLOW STEAM HEADER PRESSURE AIR FLOW SP LO SELECT HI SELECT Fuel CONTROL Fuel Feed AIR DAMPER Air Feed Bharat Heavy Electricals Limited - Tiruchirappalli 67

68 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Mill air flow and temperature control Mill uses primary air - For transporting coal from mill to furnace. To "dry" coal. Air flow to mill and mill outlet temperature are regulated using Hot air damper and cold air damper respectively Bharat Heavy Electricals Limited - Tiruchirappalli

69 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Feedwater control Objective : To supply enough water to the boiler to match the evaporation rate. Water level in the drum indicates amount of water in boiler Actual Steam Flow - Used to determine required feedwater during transient conditions when level may not be accurate. Difference between Actual steam flow and Actual Feedwater Flow is added to the level error to form the ‘Feedwater demand’. Feedwater demand drives the feed control station to adjust feedwater sa as to maintain the drum level to normal value. Bharat Heavy Electricals Limited - Tiruchirappalli

70 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Feedwater control P R E S U C O M N A T I f ( x ) X F L K D V / W y p i c a l s n g e - d r v o t m . , u h b w 4 5 1 9 8 Bharat Heavy Electricals Limited - Tiruchirappalli

71 Boiler C&I Steam temperature control Objective:
Steam temperature control Objective: To maintain a constant steam temperature at turbine inlet despite large load swings . Basic methods : DESUPERHEATING (ATTEMPERATION) Fine spray of comparatively cool water droplets into the vapour to reduce steam temperature. BURNER TILT POSITIONING Raise/Lower the Fireball in the furnace by tilting burners upwards or downwards. Bharat Heavy Electricals Limited - Tiruchirappalli

72 Boiler C&I Steam temperature control
Steam temperature control Bharat Heavy Electricals Limited - Tiruchirappalli

73 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Secondary Air Damper Control Two types of dampers – Fuel air dampers & Auxiliary air dampers Maintains proper windbox air flow distribution 0 to 30 % unit load, all auxiliary dampers modulated to maintain windbox to furnace differential pressure Above 30% unit load, BMS “closes” elevations of auxiliary dampers that are not required for elevations of fuel currently in service Fuel air dampers are positioned on an elevation basis as a function of the corresponding coal feeder speed High windbox to furnace differential pressure opens all the secondary air dampers Bharat Heavy Electricals Limited - Tiruchirappalli

74 Boiler C&I Steam temperature control
Steam temperature control Cascade control used for Spray de-superheating loop MS temperature error establishes the set point for SH DESH outlet temp. SH DESH outlet temp. error positions the spray control valve such as to regulate the MS temperature within allowable limits. Burner tilt responds to the lower of SH or RH outlet temp. Spray control responds to the higher of SH or RH outlet temp. Bharat Heavy Electricals Limited - Tiruchirappalli

75 BOILER AUXILIARIES INTERLOCKS AND PROTECTION SYSTEM
Boiler C&I BOILER AUXILIARIES INTERLOCKS AND PROTECTION SYSTEM Scope : Sequence control of starting and protection & interlocking of boiler auxiliaries… FD fans ID fans PA fans Airheaters Dampers Valves Bharat Heavy Electricals Limited - Tiruchirappalli

76 FURNACE SAFEGUARD SUPERVISORY SYSTEM ( FSSS )
Boiler C&I FURNACE SAFEGUARD SUPERVISORY SYSTEM ( FSSS ) This system takes care of interlocks required for starting, supervising the operating and safe shut down of the equipments connected with fuel firing system. Bharat Heavy Electricals Limited - Tiruchirappalli

77 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Tangential Windbox Bharat Heavy Electricals Limited - Tiruchirappalli

78 FURNACE PLAN CORNER DESIGNATION
Boiler C&I FURNACE PLAN CORNER DESIGNATION 2 C E R N O - 3 C E R N O - SECONDARY AIR SECONDARY AIR 4 C E R N O - 1 C E R N O - FRONT WATER WALL Bharat Heavy Electricals Limited - Tiruchirappalli

79 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Fireball –Tangential Firing Bharat Heavy Electricals Limited - Tiruchirappalli

80 CAUSES OF FURNACE EXPLOSIONS
Boiler C&I CAUSES OF FURNACE EXPLOSIONS An interruption of Fuel or Air supply or Ignition energy to the burners, sufficient to result in momentary loss of flames, followed by restoration and delayed re-ignition of an accumulation. Fuel leakage into an idle furnace and the ignition of the accumulation by a spark or other source of ignition. Repeated unsuccessful attempts to light-off without appropriate purging, resulting in the accumulation of an explosive mixture. The accumulation of an explosive mixture of fuel and air as a result of loss of flame or incomplete combustion at one or more burners in the presence of other burners operating normally or during lighting of additional burners. The accumulation of an explosive mixture of fuel and air as a result of a complete furnace flameout and the ignition of the accumulation by a spark or other ignition source, such as could occur where attempting to light a burner(s). Purging with an airflow that is too high, which stirs up combustibles smoldering in hoppers. Bharat Heavy Electricals Limited - Tiruchirappalli

81 CAUSES OF FURNACE IMPLOSIONS
Boiler C&I CAUSES OF FURNACE IMPLOSIONS A mal-operation of the equipment regulating the boiler gas flow, including air supply and flue gas removal, resulting in furnace exposure to excessive induced draft fan head assembly. The rapid decay of furnace gas temperatures and pressure resulting from either a rapid reduction in fuel input or a master fuel trip. A combination of the two conditions indicated in a, b above has resulted in the most severe furnace implosion incidents. Bharat Heavy Electricals Limited - Tiruchirappalli

82 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS FUNCTIONS OF FSSS 1. FURNACE PURGE SUPERVISION 2. SECONDARY AIR DAMPER MODULATION AND ON-OFF CONTROL AND SUPERVISION 3. IGNITOR ON-OFF CONTROL AND SUPERVISION 4. LIGHT OIL ON-OFF CONTROL AND SUPERVISION 5. HEAVY OIL ON-OFF CONTROL AND SUPERVISION 6. PULVERIZER AND FEEDER ON-OFF CONTROL AND SUPERVISION 7. FLAME SCANNER INTELLIGENCE AND CHECKING 8. BOILER TRIP PROTECTION. Bharat Heavy Electricals Limited - Tiruchirappalli

83 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I F S S S F - FURNACE S - SAFEGUARD S - SUPERVISORY S - -SYSTEM FSSS ENSURES SAFE FURNACE OPERATING CONDITIONS DURING START UP LOW LOAD OPERATION SHUT DOWN. Bharat Heavy Electricals Limited - Tiruchirappalli

84 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS SOME OF THE PRECAUTIONARY MEASURES TO ACHIEVE SAFE AND RELIABLE OPERATION FURNACE SHOULD BE PURGED BEFORE LIGHT UP ADEQUATE IGNITION ENERGY TO EACH BURNER ADEQUATE AIR SUPPLY TO EACH BURNER TO AVOID FLAME OUT OPTIMUM FURNACE PRESSURE CORRECT AIR TO FUEL RATIO Bharat Heavy Electricals Limited - Tiruchirappalli

85 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS FUNCTIONAL DIVISION OF LOGICS UNIT LOGIC ELEVATION LOGIC CORNER LOGIC Bharat Heavy Electricals Limited - Tiruchirappalli

86 TYPICAL CONDITIONS FOR FURNACE PURGE:
Boiler C&I TYPICAL CONDITIONS FOR FURNACE PURGE: Heavy fuel oil trip valve closed. Heavy fuel oil nozzle valves closed. Light fuel oil trip valve closed. Light fuel oil nozzle valves closed. Flame scanners on each elevation indicate no flame. Air flow greater than 30% and less than 40% All pulverisers off. All feeders off. Pulveriser outlet gates closed. All hot air gates closed. All cold air dampers not greater than 5° open. Both PA fans off. No boiler trip existing. All auxiliary air dampers modulating. Bharat Heavy Electricals Limited - Tiruchirappalli

87 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS BOILER TRIP COMMAND IS INITIATED BY LOW OR HIGH DRUM WATER LEVEL BOTH I.D OR F.D ARE OFF LOW OR HIGH FURNACE PRESSURE REHEATER PROTECTION TRIP TURBINE LOSS OF ALL FUEL TRIP LOSS OF UNIT D.C POWER LESS THAN FIRE BALL AND LOSS OF AC AT ANY ELEVATION MANUAL TRIP UNIT FLAME FAILURE TRIP INSUFFICIENT PRIMARY AIR Bharat Heavy Electricals Limited - Tiruchirappalli

88 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS BOILER TRIP COMMAND RESULTS IN STOPPAGE OF ALL FUEL INPUTS BY TRIPPING 1. ALL PULVERIZERS 2. ALL FEEDERS 3. ALL OIL GUNS 4. ALL IGNITORS IT CLOSES 1. IGNITOR LIGHT OIL TRIP VALVES HEAVY OIL TRIP VALVES Bharat Heavy Electricals Limited - Tiruchirappalli

89 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Scanner Fan logic “Scanner duct to furnace DP” when low initiates a Scanner air fan -A “run” command If DP value remains “low” for more than five seconds, scanner air fan -B “run” command is issued. If DP condition is low even after 10 seconds “Loss Of Scanner Cooling Air” alarm is generated Bharat Heavy Electricals Limited - Tiruchirappalli

90 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Seal Air Fan Control When either Primary Air Fan is on, seal air fan “A” is automatically placed in service. If either Primary Air Fan is on & Seal Air Header/Cold Air Duct DP is low, the seal air fan is auto started. When both seal air fans are on and the Seal Air Header/Cold Air Duct DP is not low,either seal air fan can be stopped manually. Bharat Heavy Electricals Limited - Tiruchirappalli

91 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS PULVERIZER STARTING PROCEDURE START “PULVERIZER ON” FEEDBACK OPEN HOT AIR GATE WAIT TILL PULVERIZER COMES TO TEMPERATURE ( 140°F ) START FEEDER ( AT MINIMUM FEEDER SPEED ) COAL FLOW INDICATOR OR PULVERIZER AMPERE ( ( WITH IN 5 SECONDS ) FIFTY SECONDS FEEDER SPEED RELEASED TO AUTOMATIC CONTROL FUEL AIR DAMPER OPENED FUEL AIR DAMPER MODULATED TO AUTOMATIC CONTROL. Bharat Heavy Electricals Limited - Tiruchirappalli

92 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS PULVERIZER START REQUIREMENTS A IGNITION ENERGY AVAILABLE B. ADEQUATE PRIMARY AIR C. D.C POWER AVAILABLE D. LOCAL PULVERIZER CONDITION SATISFACTORY E. IF NO OTHER FEEDER IS WORKING FUEL AND AIR NOZZLE TILTS PLACED IN HORIZONDAL CONDITION. Bharat Heavy Electricals Limited - Tiruchirappalli

93 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS CONDITIONS ( LOCAL ) TO BE SATISFIED TO START RESPECTIVE PULVERIZER A. DISCHARGE VALVE OPEN B. SEAL AIR VALVE OPEN C. COLD AIR DAMPER OPEN D. PULVERIZER DAMPER OUTLET LESS THAN 200°F E. FEEDER INLET GATE OPEN F. TRAMP IRON HOPPER VALVE OPEN. Bharat Heavy Electricals Limited - Tiruchirappalli

94 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS PULVERIZER IGNITION ENERGY AVAILABLE A MINIMUM OF 3 OF THE 4 LIGHT OIL OR HEAVY OIL NOZZLE VALVE OF THE ELEVATION JUST ABOVE OR BELOW, ARE OPEN OR BOILER LOADING IS GREATER THAN 30% AND PULVERIZER JUST ABOVE OR BELOW IS IN SERVICE AT GREATER THAN 50% LOADING. Bharat Heavy Electricals Limited - Tiruchirappalli

95 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS MILL OUTLET TEMPERATURE CONTROL HIGH PULVERIZER OUTLET TEMPERATURE (ABOVE 200°F ) WILL OPEN COLD AIR DAMPER AND CLOSE HOT AIR GATE. Bharat Heavy Electricals Limited - Tiruchirappalli

96 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS FEEDER CONTROL A. FEEDER RUNS AT MINIMUM SPEED UNTIL INITIATING CONDITION IS CORRECTED, AT WHICH TIME THE FEEDER WILL BE RETURNED TO CONTROL. A. PULVERIZER BOWL DIFFERENTIAL HIGH. B. PULVERIZER AMPS. ABOVE MAXIMUM SET POINT. B. LOSS OF COAL FLOW AND LOW PULVERIZER CURRENT WILL TRIP THE FEEDER, OPEN COLD AIR DAMPER AND CLOSE HOT AIR GATE. AFTER CORRECTIVE ACTION THE HOT AIR GATE IS OPENED AND FEEDER IS RESTARTED. Bharat Heavy Electricals Limited - Tiruchirappalli

97 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS CONDITIONS FOR A PULVERIZER TRIP PULVERIZER DISCHARGE VALVE NOT OPEN LOSS OF UNIT DC POWER (FOR MORE THAN 2 SECONDS) PULVERIZER IGNITION PERMIT NOT SATISFIED AND SUPPORT IGNITION IS REQUIRED. BOILER TRIP PRIMARY AIR FAN TRIP Bharat Heavy Electricals Limited - Tiruchirappalli

98 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS PULVERIZER SHUT DOWN SEQUENCE START ASSOCIATED OIL ELEVATION REDUCE FEEDER SPEED TO MINIMUM CLOSE HOT AIR GATE PULVERIZER OUTLET TEMPERATURE IS 120°F STOP FEEDER WAIT FOR 2 MINUTES STOP PULVERIZER FURNACE STABILIZES ASSOCIATED OIL LEVEL SHUT DOWN. Bharat Heavy Electricals Limited - Tiruchirappalli

99 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS PULVERIZER SHUT DOWN START ASSOCIATED OIL ELEVATION REDUCE FEEDER SPEED TO MINIMUM CLOSE HOT AIR GATE PULVERIZER TEMPERATURE IS 120°F STOP FEEDER TWO MINUTES STOP PULVERIZER FURNACE STABILIZES SHUT OFF ASSOCIATED OIL ELEVATION. Bharat Heavy Electricals Limited - Tiruchirappalli

100 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS ARRANGEMENT OF SYSTEM FSSS - MAJOR PARTS LOGIC CABINET CONSOLE INSERT SECONDARY AIR DAMPER PANEL MILL PANEL FIELD EQUIPMENTS CUSTOMER SUPPLIED INTERFACE EQUIPMENT. Bharat Heavy Electricals Limited - Tiruchirappalli

101 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I Oil gun start sequence HEA Advances Atomising valve opens Corner oil valve opens HEA sparks Flame scanner picks up flame HEA retracts Corner valve closes if flame is not sensed. Bharat Heavy Electricals Limited - Tiruchirappalli

102 Bharat Heavy Electricals Limited - Tiruchirappalli
Boiler C&I FSSS – Oil gun start up timing sequence Bharat Heavy Electricals Limited - Tiruchirappalli