Redesign of the Arborway: Kelley Circle to Murray Circle

Similar presentations


Presentation on theme: "Redesign of the Arborway: Kelley Circle to Murray Circle"— Presentation transcript:

1 Redesign of the Arborway: Kelley Circle to Murray Circle
Design By: HUB Engineering, Inc Michelle Boccia Andrew Caparco Joseph Mayotte Jocelyn Rothstein

2 Redesign of the Arborway
Existing Conditions: Emerald Necklace Jamaica Pond Project Area Arnold Arboretum HUB Engineering, Inc. Redesign of the Arborway

3 Redesign of the Arborway
Existing Conditions: Kelley Circle Murray Circle HUB Engineering, Inc. Redesign of the Arborway

4 Redesign of the Arborway
Objectives: Provide a high quality multi-use path. Provide safe pedestrian crossings. Provide a high quality multi-use path. Provide safe pedestrian crossings. Maintain arterial capacity. Maintain arterial capacity. Convert road space to green space. Convert inaccessible green space to accessible green space. Preserve existing landscape and mature trees. Separate regional and local traffic. Provide reasonable access to and from local streets while discouraging cut-thru traffic. Separate regional and local traffic. Provide reasonable access to and from local streets while discouraging cut-thru traffic. HUB Engineering, Inc. Redesign of the Arborway

5 Northeastern Proposed Design:
Signal added at Eliot Street. Signalized intersection replaces existing rotary at Murray Circle. Two coordinated signals replace current rotary at Kelley Circle. Proposed 10’ Paved Multi-Use Path and 6’ Stone Dust Path Outer Arborways now two-way 18’ roadways. Existing signal at Pond Street replaced with all-way stop. Crossover signal separates EB Left and EB Through traffic in order to increase capacity. HUB Engineering, Inc. Redesign of the Arborway

6 Paths: Existing Cross Section Proposed Cross Section
HUB Engineering, Inc. Redesign of the Arborway

7 Origin-Destination Study:
HUB Engineering, Inc. Redesign of the Arborway

8 Analysis of Proposed Improvements
Weekday AM: v/c 0.57 LOS A Weekday PM: v/c 0.65 LOS A Weekday AM: v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B Weekday AM: v/c 0.67 LOS B Weekday PM: v/c 0.60 LOS B Weekday AM: v/c 0.97 LOS B Weekday PM: v/c 0.80 LOS A Weekday AM: v/c 0.53 LOS B Weekday PM: v/c 0.64 LOS B Weekday AM: v/c 0.57 LOS B Weekday PM: v/c 0.36 LOS B HUB Engineering, Inc. Redesign of the Arborway

9 Existing Recreational Greenspace:
Accessible Greenspace Inaccessible Greenspace HUB Engineering, Inc. Redesign of the Arborway

10 Proposed Recreational Greenspace:
New Greenspace = 4.45 Acres Newly Accessible Greenspace = 5.60 Acres Total Greenspace Gained = Acres Accessible Greenspace Inaccessible Greenspace HUB Engineering, Inc. Redesign of the Arborway

11 Redesign of the Arborway
VISSIM… HUB Engineering, Inc. Redesign of the Arborway

12 Redesign of the Arborway
Evaluation: Design provides a 10’ paved multi-use path as well as a 6’ stone dust path. All crossings are signal protected. Design provides a 10’ paved multi-use path as well as a 6’ stone dust path. All crossings are signal protected. Design maintains current arterial capacity. Design maintains current arterial capacity. Design converts road space to green space. Design converts inaccessible green space to accessible green space. No mature trees along the Arborway disrupted. Design geometrically separates regional and local traffic. Design provides reasonable access to and from local street. Design geometrically separates regional and local traffic. Design provides reasonable access to and from local street. HUB Engineering, Inc. Redesign of the Arborway

13 Redesign of the Arborway
Questions? HUB Engineering, Inc. Redesign of the Arborway