North Georgia Water Resources Partnership Spring Annual Meeting/ Educational Seminar RUSSELL CREEK RESERVOIR April 25, 2018
2
OUTLINE Permits Obtained Design Phase Construction Phase
Environmental Campus
3
PERMITS OBTAINED
4
PERMITS OBTAINED Existing Lake Proposed Reservoir
Soil Conservation Service built No. 13 in 1968 11 acres 3.5 mi2 watershed Proposed Reservoir 137 acres 110’ tall Earthen Dam 1.3 Billion Gallons of Water
5
PERMITS OBTAINED Russell Creek Reservoir 17.3 MGD (peak day)
11.47 MGD (annual average) Serving 126,000 in 2057
6
PERMITS OBTAINED Wetland Credits Purchased
Stream Credits Purchased (Over 2 Years) Land Purchased Cultural Mitigation Completed Funding Finalized
7
DESIGN PHASE
8
DESIGN PHASE
9
DESIGN PHASE Site Overiew
10
DESIGN PHASE Request for Proposals Freese and Nichols
Golder / Wiedeman & Singleton Gannett Fleming / Parsons Schnabel Engineering / Arcadis
11
CONSTRUCTION PHASE Designed and Constructed to NRCS and Georgia Safe Dam Standards Remove Trees during the winter of Must remove the Entire Existing Dam Completion Scheduled for Spring 2023
12
ENVIRONMETNAL CAMPUS
13
ENVIRONMETNAL CAMPUS
14
QUESTIONS?