Provo River Watershed Modeling with WMS Ryan Murdock
2
Creation of Hydrologic Model
Import 17 USGS 7.5 minute quads 30m resolution UTM projection Import 250K Digital Raster Graphic (DRG)
3
DEMs and DRG
4
DEM Processing Fill no data cells Smooth DEM
Compute flow directions & flow accumulations Convert raster streams to feature arcs Choose outlet Set accumulation threshold Delineate basin boundaries
5
Flow Accumulations (threshold = 1000)
6
Delineated Basin elevation~ 1200m-3800m
7
More Data USGS gaging stations Land use/land cover data Provo
Vivian Park Heber Land use/land cover data CN extraction
8
Completing the Model Create and study sub-basins
Calibrate flow rates to gaging station records (HEC-1) Input Reservoirs (Deer Creek)
9
Further Analysis Analyze lag time & time of concentration approaches
Robustness of equations Sensitivity to slope, area, and location Try multiple methods on same area Compare results
10
Water Resources Engineers at work