Download presentation
Presentation is loading. Please wait.
1
Technology Update September 22, 2014
2
Technology Update Staffing
Chief Technology Officer Instructional Technology Director of Instructional Technology New Coordinator Instructional Specialists (2) Technology Department Network Engineer Campus Computer Technicians (6) Staffing changes – disruption in services
3
Technology Update TechnoPalooza Storage
Backup window Capacity Planned obsolescence of array Disaster Recovery & Business Continuity Network Infrastructure & Internet Capacity TechnoPalooza – huge success Storage – Backup times exceed available time at night, capacity > 87% used, Maintenance contract exceeds new array pricing Discuss AT&T and Onesource – Internet capacity recommendation – 100MB’s per 1000, – 1GB’s per , Checkpoint issues with authentication ATT inbound traffic at 100MB’s – Network issues with flat network, capacity of network and issues with NHS DR/BC – work begins with server and storage upgrades
4
Technology Update NHS – Network Challenges
1:1 Rollout – 9,505 tablets out to students; 7,471 – Day 1 Lab Upgrades – NHS 10, BNHS 7 – SPAM Password changes NHS challenges – related to MLD and flat layer 2 network 1:1 successful – zero devices missing at start of school 510 computers replaced updated to go with replacement cycle NHS – particular network challenges due to network design SPAM – password changes coming due to over 3 Million spam messages outbound from NISD –
5
Technology Update Netschool – 1,893 Active courses
Work Orders – 514 Open Opened to Closed Ratio -50 per day 5th Grade Tablet Carts by 10/3/14
6
Technology Update September 22, 2014
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.